Members Can Post Anonymously On This Site
Juice’s RIME antenna breaks free
-
Similar Topics
-
By NASA
2 min read
Preparations for Next Moonwalk Simulations Underway (and Underwater)
NASA’s Wallops Flight Facility commemorated the start of construction of its new Wallops Island causeway bridge during a groundbreaking ceremony at 10 a.m., Monday, April 14, 2025, on the island.
NASA’s Wallops Flight Facility commemorated the start of construction of its new Wallops Island causeway bridge during a groundbreaking ceremony at 10 a.m., Monday, April 14, 2025, on the island. NASA’s Wallops Flight Facility Facility Director David Pierce, NASA’s Goddard Space Flight Center Associate Center Director Ray Rubilotta, and Virgnia Sen. Bill DeSteph attended the ceremony.NASA/Danielle Johnson The ceremony was held at the base of the old Wallops Island causeway bridge. Virgina state Sen. Bill DeSteph attended the groundbreaking, along with staffers from the offices of Sen. Mark Warner, Sen. Tim Kaine, Congresswomen Jen Kiggans, Sen. Chris Van Hollen, and Sen. Angela Alsobrooks. NASA Wallops Facility Director David Pierce and NASA’s Goddard Space Flight Center Associate Center Director Ray Rubilotta attended on behalf of the agency.
“Much has changed over the decades, but one thing that has remained the same is our reliance on the causeway bridge as the only means for vehicular access to and from the island,” said Pierce. “Our bridge supports a growing portfolio of commercial launch and government partners. The work we do advances science, technology, and national security missions. This vital work for our nation is enabled by our bridge.”
In 2023, NASA Wallops was awarded $103 million in federal funds to fully construct and replace the current 65-year-old causeway bridge that serves as the only vehicular access from NASA Wallops Mainland facilities to its Wallops Island facilities and launch range. After years of exposure to coastal weather and repeated repairs to extend its viability, the existing causeway bridge is reaching the end of its service life.
The new causeway bridge, slated for completion in early 2028, will feature a flatter structure, capable of accommodating the increase in heavier loads transported to and from the island in support of an increased cadence of launch operations by NASA, its tenants, and commercial partners. This vital investment in NASA’s infrastructure supports the launch range’s continued growth, strengthening its role as a key asset in Virginia and the nation.
An architectural rendering showing the new Wallops Island causeway bridge next to the old causeway bridge.Courtesy of Kokosing NASA is partnering with the Federal Highway Administration to lead the delivery of the design-build project. The project has been awarded to Kokosing Construction Company.
For more information on NASA’s Wallops Flight Facility, visit www.nasa.gov/wallops.
Share
Details
Last Updated Apr 14, 2025 Related Terms
Wallops Flight Facility
View the full article
-
By NASA
This summer, NASA’s Glenn Research Center in Cleveland is offering a free summer STEM program for high school students in their junior and senior years.Credit: NASA NASA’s Glenn Research Center in Cleveland is launching the NASA Glenn High School Engineering Institute this summer. The free, work-based learning experience is designed to help high school students prepare for a future in the aerospace workforce.
Rising high school juniors and seniors in Northeast Ohio can submit applications for this new, in-person summer program from Friday, April 11, through Friday, May 9.
The NASA Glenn High School Engineering Institute will immerse students in NASA’s work while providing essential career readiness tools to help them in future science, technology, engineering, and mathematics-focused academic and professional pursuits.
Throughout the five-day institute, students will use authentic NASA mission content and work alongside Glenn’s technical experts to gain a deeper understanding of the engineering design process, develop practical engineering solutions to real-world challenges, and test prototypes to answer questions in key mission areas:
Acoustic dampening – How can we reduce noise pollution from jet engines? Power management and distribution – How can we develop a smart power system for future space stations? Simulated lunar operations – Can we invent tires that don’t use air? Program Dates
Selected students will participate in one of the following week-long sessions.
Session 1: July 7 – 11, 2025 Session 2: July 14 – 18, 2025 Session 3: July 21 – 25, 2025 Eligibility and Application Requirements
To be eligible for this program, students must:
Be entering 11th or 12th grade for the 2025-2026 academic year Have a minimum 3.2 GPA, verified by their school counselor Submit a letter of recommendation from a teacher Additional application requirements are outlined in the Supplemental Application.
How to Apply:
To be considered for this opportunity, complete and submit the NASA Gateway application and the Supplemental Application by Friday May 9.
Questions pertaining to the NASA Glenn High School Engineering Institute should be directed to Gerald Voltz at GRC-Ed-Opportunities@mail.nasa.gov.
For information about NASA Glenn, visit:
https://www.nasa.gov/glenn
-end-
Debbie Welch
Glenn Research Center, Cleveland
216-433-8655
debbie.welch@nasa.gov
Explore More
3 min read NASA Science Supports Data Literacy for K-12 Students
Data – and our ability to understand and use it – shapes nearly every aspect…
Article 19 hours ago 3 min read University High Triumphs at JPL-Hosted Ocean Sciences Bowl
Article 1 week ago 2 min read Students Explore Technical Careers at NASA
Article 3 weeks ago View the full article
-
By NASA
Official portrait of NASA Associate Administrator Jim Free, taken on Nov. 22, 2024, at the agency’s headquarters in Washington.Credit: NASA/Bill Ingalls NASA Associate Administrator Jim Free announced Wednesday his retirement, effective Saturday, Feb. 22. As associate administrator, Free has been the senior advisor to NASA Acting Administrator Janet Petro and leads NASA’s 10 center directors, as well as the mission directorate associate administrators at NASA Headquarters in Washington. He is the agency’s chief operating officer for more than 18,000 employees and oversaw an annual budget of more than $25 billion.
During his tenure as associate administrator since January 2024, NASA added nearly two dozen new signatories of the Artemis Accords, enabled the first Moon landing through the agency’s CLPS (Commercial Lunar Payload Services) initiative to deliver NASA science to the lunar surface, launched the Europa Clipper mission to study Jupiter’s icy ocean moon, and found molecules containing the ingredients for life in samples from asteroid Bennu delivered to Earth by NASA’s OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification and Security–Regolith Explorer) spacecraft.
“Throughout his career, Jim has been the ultimate servant leader – always putting the mission and the people of NASA first,” said Petro. “A remarkable engineer and a decisive leader, he combines deep technical expertise with an unwavering commitment to this agency’s mission. Jim’s legacy is one of selfless service, steadfast leadership, and a belief in the power of people.”
Among the notable contributions to the nation during his NASA career, Free also championed a new path forward to return samples from Mars ahead of human missions to the Red Planet, supported the crews living and working aboard the International Space Station as they conduct hundreds of experiments and technology demonstrations, and engaged industry in new ways to secure a public/private partnership for NASA’s VIPER (Volatiles Investigating Polar Exploration Rover) mission on the Moon.
“It has been an honor to serve NASA and walk alongside the workforce that tackles the most difficult engineering challenges, pursues new scientific knowledge in our universe and beyond, develops technologies for future exploration endeavors, all while prioritizing safety every day for people on the ground, in the air, and in space,” Free said. “I am grateful for the opportunity to be part of the NASA family and contribute to the agency’s mission for the benefit of humanity.”
During his more than three decades of service, Free has held several leadership roles at the agency. Before being named NASA associate administrator, Free served as associate administrator of the Exploration Systems Development Mission Directorate, where he oversaw the successful Artemis I mission and the development of NASA’s Moon to Mars architecture, defining and managing the systems development for the agency’s Artemis missions and planning for NASA’s integrated deep space exploration approach.
Free began his NASA career in 1990 as an engineer, working on Tracking and Data Relay Satellites at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. He later transferred to the agency’s Glenn Research Center in Cleveland and served in a variety of roles supporting the International Space Station and the development of the Orion spacecraft before transferring to NASA’s Johnson Space Center in Houston in 2008. Free returned to NASA Glenn in 2009 and was promoted to chief of the Space Flight Systems Directorate, where he oversaw the center’s space work. Free was named deputy center director in November 2010 and then served as center director from January 2013 until March 2016, when he was appointed to the NASA Headquarters position of deputy associate administrator for Technical [sic] in the Human Exploration and Operations Mission Directorate.
A native of Northeast Ohio, Free earned his bachelor’s degree in aeronautics from Miami University in Oxford, Ohio, and his master’s degree in space systems engineering from Delft University of Technology in the Netherlands.
Free is the recipient of the Presidential Rank Award, NASA Distinguished Service Medal, NASA Outstanding Leadership Medal, NASA Exceptional Service Medal, NASA Significant Achievement Medal, and numerous other awards.
For more information about NASA, visit:
https://www.nasa.gov
-end-
Kathryn Hambleton / Cheryl Warner
Headquarters, Washington
202-358-1600
kathryn.hambleton@nasa.gov / cheryl.m.warner@nasa.gov
Share
Details
Last Updated Feb 19, 2025 EditorJessica TaveauLocationNASA Headquarters Related Terms
Leadership View the full article
-
By NASA
NASA/JPL-Caltech A crane lowers the 112-foot-wide (34-meter-wide) steel framework for the Deep Space Station 23 (DSS-23) reflector dish into position on Dec. 18, 2024, at the Deep Space Network’s (DSN) Goldstone Space Communications Complex near Barstow, California. Once online in 2026, DSS-23 will be the fifth of six new beam waveguide antennas to be added to the network; DSS-23 will boost the DSN’s capacity and enhance NASA’s deep space communications capabilities for decades to come.
The DSN allows missions to track, send commands to, and receive scientific data from faraway spacecraft. More than 100 NASA and non-NASA missions rely on the DSN and Near Space Network, including supporting astronauts aboard the International Space Station and future Artemis missions, supporting lunar exploration, and uncovering the solar system and beyond.
Watch a time-lapse video of construction activities on Dec. 18.
Image credit: NASA/JPL-Caltech
View the full article
-
By Space Force
The Space Campus is a major initiative aimed at enhancing the base's space operations and capabilities in the area. The project is designed to provide a state-of-the-art facility for personnel to work together and advance the mission, supporting the growing demands of space-related activities.
View the full article
-
-
Check out these Videos
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.