Jump to content

Defense Department Provides Warning to Military Services Regarding Poppy Seed Consumption and Military Drug Testing


Space Force

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      4 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      Note: The following article is part of a series highlighting propulsion testing at NASA’s Stennis Space Center. To access the entire series, please visit: https://www.nasa.gov/feature/propulsion-powering-space-dreams/.
      Crews at NASA’s Stennis Space Center work Jan. 21-22, 2020, to install the first flight core stage of NASA’s powerful SLS (Space Launch System) rocket on the B-2 side of the Thad Cochran Test Stand for a Green Run test series. Operations required crews to lift the massive core stage from a horizontal position into a vertical orientation, a procedure known as “break over.” Once the stage was oriented in a horizontal position on the night of Jan. 21, crews tied it in place to await favorable wind conditions. The following morning, crews began the process of raising, positioning, and securing the stage on the stand. NASA/Stennis The future is now at NASA’s Stennis Space Center near Bay St. Louis, Mississippi – at least when it comes to helping power the next great era of human space exploration.  
      NASA Stennis is contributing directly to the agency’s effort to land the first woman, the first person of color, and its first international partner astronaut on the Moon – for the benefit of all humanity. Work at the nation’s largest – and premier – propulsion test site will help power SLS (Space Launch System) rockets on future Artemis missions to enable long-term lunar exploration and prepare for the next giant leap of sending the first astronauts to Mars.  
      “We play a critical role to ensure the safety of astronauts on future Artemis missions,” NASA Stennis Space Center Director John Bailey said. “Our dedicated workforce is excited and proud to be part of NASA’s return to the Moon.”  
      NASA Stennis achieved an RS-25 testing milestone in April at the Fred Haise Test Stand. Completion of the successful RS-25 certification series provided critical data for L3Harris (formerly known as Aerojet Rocketdyne) to produce new RS-25 engines, using modern processes and manufacturing techniques. The engines will help power SLS rockets beginning with Artemis V.   
      The first four Artemis missions are using modified space shuttle main engines also tested at NASA Stennis. For each Artemis mission, four RS-25 engines, along with a pair of solid rocket boosters, power the SLS rocket to produce more than 8.8 million pounds of total combined thrust at liftoff.   
      NASA’s powerful SLS rocket is the only rocket that can send the Orion spacecraft, astronauts, and cargo to the Moon on a single mission.   
      Following key test infrastructure upgrades near the Fred Haise Test Stand, NASA Stennis will be ready for more RS-25 engine testing. NASA has awarded L3Harris contracts to provide 24 new engines, supporting SLS launches for Artemis V through Artemis IX.  
      “Every RS-25 engine that launches Artemis to space will be tested at NASA Stennis,” said Joe Schuyler, director of the NASA Stennis Engineering and Test Directorate. “We take pride in helping to power this nation’s human space exploration program. We also take great care in testing these engines because they are launching astronauts to space. We always have safety in mind.” 
      NASA’s Stennis Space Center conducts a successful hot fire of the first flight core stage of NASA’s powerful SLS (Space Launch System) rocket on the B-2 side of the Thad Cochran Test Stand on March 18, 2021. NASA employees, as well as NASA astronauts Jessica Meir and Zena Cardman, watched the milestone moment. The hot fire of more than eight minutes marked the culmination of a Green Run series of tests on the stage and its integrated systems.  NASA/Stennis In addition to RS-25 testing, preparations are ongoing at the Thad Cochran Test Stand (B-2) for future testing of the agency’s new exploration upper stage. The more powerful SLS second stage, which will send astronauts and cargo to deep space aboard the Orion spacecraft, is being built at NASA’s Michoud Assembly Facility in New Orleans.   
      Before its first flight, the NASA Stennis test team will conduct a series of Green Run tests on the new stage’s integrated systems to demonstrate it is ready to fly. Crews completed installation of a key component for testing the upper stage in October. The lift and installation of the 103-ton interstage simulator component, measuring 31 feet in diameter and 33 feet tall, provided crews best practices for moving and handling the actual flight hardware when it arrives to NASA Stennis.   
      The exploration upper stage Green Run test series will culminate with a hot fire of the stage’s four RL10 engines, made by L3Harris, the lead SLS engines contractor.  
      “All of Mississippi shares in our return to the Moon with the next great era of human space exploration going through NASA Stennis,” Bailey said. “Together, we can be proud of the state’s contributions to NASA’s great mission.”   
      For information about NASA’s Stennis Space Center, visit:  
      Stennis Space Center – NASA  
      Share
      Details
      Last Updated Nov 13, 2024 EditorNASA Stennis CommunicationsContactC. Lacy Thompsoncalvin.l.thompson@nasa.gov / (228) 688-3333LocationStennis Space Center Related Terms
      Stennis Space Center Explore More
      5 min read NASA Stennis – An Ideal Place for Commercial Companies
      Article 13 mins ago 5 min read NASA Stennis Test Team Supports Space Dreams with Proven Expertise
      Article 14 mins ago 5 min read NASA Stennis Adapts with Purpose to Power Nation’s Space Dreams
      Article 14 mins ago Keep Exploring Discover Related Stennis Topics
      Propulsion Test Engineering
      NASA Stennis Front Door
      Multi-User Test Complex
      Doing Business with NASA Stennis
      View the full article
    • By NASA
      Teams with NASA and Lockheed Martin prepare to conduct testing on NASA’s Orion spacecraft on Thursday, Nov. 7, 2024, in the altitude chamber inside the Neil A. Armstrong Operations and Checkout building at NASA’s Kennedy Space Center in Florida. Lockheed Martin/David Wellendorf Teams lifted NASA’s Orion spacecraft for the Artemis II test flight out of the Final Assembly and System Testing cell and moved it to the altitude chamber to complete further testing on Nov. 6 inside the Neil A. Armstrong Operations and Checkout building at NASA’s Kennedy Space Center in Florida.
      Engineers returned the spacecraft to the altitude chamber, which simulates deep space vacuum conditions, to complete the remaining test requirements and provide additional data to augment data gained during testing earlier this summer.
      The Artemis II test flight will be NASA’s first mission with crew under the Artemis campaign, sending NASA astronauts Victor Glover, Christina Koch, and Reid Wiseman, as well as CSA (Canadian Space Agency) astronaut Jeremy Hansen, on a 10-day journey around the Moon and back.
      Image credit: Lockheed Martin/David Wellendorf
      View the full article
    • By NASA
      NASA and the military have shared strong connections since the agency’s early days. From the nation’s earliest aeronautic research and the recruitment of test pilot astronauts to modern-day technology development, satellite management, and planetary defense, NASA has built a longstanding partnership with the military.

      This legacy of collaboration has created natural opportunities for former service members to join NASA’s ranks at the conclusion of their military careers.

      Lewis Swain is one of the many veterans working at Johnson Space Center in Houston today. Swain was recruited by NASA contractor McDonnell Douglas after leaving the military in 1980. He commissioned as a second lieutenant and served in the Air Force for 12 years, flying nearly 200 combat missions during two tours in Vietnam.

      “The shuttle program was starting, and they needed ex-military pilots to serve as simulation instructors,” he said. Swain specialized in control and propulsion systems instruction for several years before becoming the training team lead for shuttle missions. Following the Challenger accident in 1986, Swain transitioned to supporting the International Space Station Program and Return to Flight evaluations. He has been a civil servant since 1989 and a training facility manager since 2006.

      L. Jerry Swain during his Air Force career (left) and as a facility manager at Johnson Space Center in Houston (right).Images courtesy of L. Jerry Swain NASA’s Pathways Internship Program has also provided a point of entry for former service members. John Smith was studying mechanical engineering at the University of Texas at El Paso when he made an impactful Johnson connection. “I met with a former flight director, Ms. Ginger Kerrick, at a career fair hosted by my university,” he said. “Pathways happened to be accepting applications at the time and she enthusiastically encouraged me to apply. I never expected to get a response, much less an offer. I couldn’t say yes fast enough when it came!”

      For others, the NASA SkillBridge Program has been instrumental in transitioning from the military to civilian careers. The program connects individuals in their final months of military service with a NASA office or organization. SkillBridge fellows work anywhere from 90 to 180 days, contributing their unique skillsets to the agency while building their network and knowledge. Since fellows’ pay and benefits are provided by their military branch, their support comes at no additional cost to NASA.

      Johnson hosted the agency’s first-ever SkillBridge fellow in spring 2019, paving the way for many others to follow. Albert Meza, an Air Force space professional, was among this first wave of service members at NASA. 
      Approaching retirement from the Air Force in November 2019, Meza planned to move his family back to Houston that summer, then join them in the fall once his military service ended. A colleague encouraged him to apply for SkillBridge because it would let Meza move with his family. Meza was skeptical, noting the military is not typically flexible on moves or timelines, but after a quick meeting with his commanding officer and finding a Johnson team to work with, he was on his way to Houston. “It was unbelievable,” he said. “It kind of fell into my lap.”

      Albert Meza visits Johnson Space Center’s Space Vehicle Mockup Facility while serving in the Air Force (left) and receives an award from NASA astronaut Rex J. Walheim during his retirement ceremony at Space Center Houston (right). Images courtesy of Albert Meza Today Meza is a payload integration manager for NASA’s CLPS (Commercial Lunar Payload Services) program, working within the Exploration Architecture, Integration, and Science Directorate at Johnson. In this role, he acts as a liaison between payload teams and the vendor developing a lander to help ensure flight requirements are understood and met.

      Meza is also one of SkillBridge’s on-site coordinators. He said that when he first arrived at Johnson, he realized the program was relatively unknown. “I thought, I need to take the responsibility for waving the flag for SkillBridge at NASA.” Meza works tirelessly to educate service members, military leaders, and NASA supervisors about the program’s benefits. He also emphasizes how easy it is for NASA supervisors to host a fellow. “You get someone for six months who is already disciplined, loyal, and has all of these highly trained credentials,” he said. “Any civil servant supervisor can host a SkillBridge fellow. The only real requirement is that the supervisor can provide IT assets and a work location.”

      Johnson has hosted more than 25 SkillBridge fellows since the program’s inception. Many fellows have since accepted full-time positions with NASA, including Patricia “Trish” Elliston. Meza found her a SkillBridge position with the center’s Protective Services Division in spring 2023. Elliston relocated to Houston in 2020, a few years prior to her anticipated retirement from the U.S. Coast Guard. Living in Houston and interacting with numerous NASA employees, along with prior experience working with the agency in maritime safety, convinced Elliston that Johnson was the place for her.

      Trish Elliston flies aboard an aircraft during a mission (left) and visits Johnson Space Center’s Space Vehicle Mockup Facility (right) while serving in the U.S. Coast Guard. Images courtesy of Trish Elliston “During my internship I networked as much as possible and made every effort to learn as much as I could so that I could be better prepared to start my civilian career,” Elliston said. “I worked hard and learned a lot, and when a job opportunity became available, I applied.” She now works as a cyber intelligence analyst within the Flight Operations Directorate.

      Meza notes that SkillBridge is a transition program, not a hiring program, and that some fellows have not received a job offer or have decided to pursue other opportunities. What happens after a SkillBridge fellowship depends on each individual and whether they’ve demonstrated their potential and built relationships in a way that turns this ‘foot in the door’ into a full-time position.  

      Interested in becoming a SkillBridge fellow at NASA? Learn more about the program and submit your application here.
      View the full article
    • By NASA
      NASA/Carla Thomas NASA’s X-59 quiet supersonic research aircraft sits in its run stall at Lockheed Martin’s Skunk Works facility in Palmdale, California, in this image from Oct. 30, 2024.
      The engine-run tests, which began Oct. 30, allow the X-59 team to verify the aircraft’s systems are working together while powered by its own engine. In previous tests, the X-59 used external sources for power. The engine-run tests set the stage for the next phase of the experimental aircraft’s progress toward flight.
      After the engine runs, the X-59 team will move to aluminum bird testing, where data will be fed to the aircraft under both normal and failure conditions. The team will then proceed with a series of taxi tests, where the aircraft will be put in motion on the ground. These tests will be followed by final preparations for first flight.
      Image credit: NASA/Carla Thomas
      View the full article
    • By NASA
      NASA's SpaceX 31st Cargo Resupply Services Launch
  • Check out these Videos

×
×
  • Create New...