Jump to content

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      Curiosity Navigation Curiosity Home Mission Overview Where is Curiosity? Mission Updates Science Overview Instruments Highlights Exploration Goals News and Features Multimedia Curiosity Raw Images Images Videos Audio Mosaics More Resources Mars Missions Mars Sample Return Mars Perseverance Rover Mars Curiosity Rover MAVEN Mars Reconnaissance Orbiter Mars Odyssey More Mars Missions The Solar System The Sun Mercury Venus Earth The Moon Mars Jupiter Saturn Uranus Neptune Pluto & Dwarf Planets Asteroids, Comets & Meteors The Kuiper Belt The Oort Cloud 2 min read
      Sols 4402-4415: Rover Decks and Sequence Calls for the Holidays
      An image under the left-front wheel of NASA’s Mars rover Curiosity shows a block that Curiosity drove over and possibly broke in half. The rover acquired this image using its Mars Descent Imager (MARDI) on sol 4396 — Martian day 4,396 of the Mars Science Laboratory mission — on Dec. 18, 2024 at 06:03:35 UTC. NASA/JPL-Caltech/MSSS Earth planning date: Friday, Dec. 20, 2024
      Welcome to the 2024 holiday plan for Curiosity! This year we’re spanning 14 sols to last us through the Earth new year. And this is my fourth year operating Mastcam during the holidays (throwback to 2023 Marsmas!). I already knew to expect a long day, so I got my lunch prepared — blew Mars a kiss in the pre-dawn sky — and headed to work at 0600 Pacific time to start planning prep. Luckily my team got a head start on Mastcam images by including a full 360-degree panorama, post-drive, last plan, so I just had to fill in some gaps and cover some buttes with our higher-resolution camera. In total we’re only planning about 438 images this holiday, which is a pretty light haul if you can believe it! We also didn’t pass SRAP to unstow the arm (again) today, which is a bummer for science but usually makes my job easier since Mastcam doesn’t have to worry about where the arm might be during our imaging. One instrument’s coal is another instrument’s present!
      So we’re doing things a little funky this holiday. We’re planning science on the first, seventh, 13th, and 14th sols — with a drive and a soliday! The hardest part of this plan was keeping it all straight in our heads.
      Without any contact science planned, MAHLI went on holiday early (actually, she’s been out all week!) and APXS only had to babysit an atmospheric integration, which doesn’t require any arm motion. ChemCam has three LIBS and four RMI mosaics planned, which is definitely more than usual. But actually, the highest sequence count for today goes to Mastcam! Our usual limit is around 20 sequences for complexity reasons, but today I delivered 34 total sequences. Of those 34 sequences, 10 are for tracking surface changes from wind, seven are for measuring the atmospheric opacity, three are ChemCam LIBS documentations, three are for documenting our location post-drive, two are large mosaics of Texoli and Wilkerson buttes, and two are for noctilucent cloud searching (our first attempts to find clouds this Martian winter!).
      With any luck, we’ll start passing SRAP again in 2025 after another approximately 58-meter drive (about 190 feet). Until then, Earthlings — Merry Marsmas and Happy Earth New Year!
      Written by Natalie Moore, Mission Operations Specialist at Malin Space Science Systems
      Share








      Details
      Last Updated Dec 30, 2024 Related Terms
      Blogs Explore More
      4 min read Sols 4398-4401: Holidays Ahead, Rocks Under the Wheels


      Article


      2 weeks ago
      3 min read Perseverance Blasts Past the Top of Jezero Crater Rim


      Article


      2 weeks ago
      3 min read Sols 4396-4397: Roving in a Martian Wonderland


      Article


      2 weeks ago
      Keep Exploring Discover More Topics From NASA
      Mars


      Mars is the fourth planet from the Sun, and the seventh largest. It’s the only planet we know of inhabited…


      All Mars Resources


      Explore this collection of Mars images, videos, resources, PDFs, and toolkits. Discover valuable content designed to inform, educate, and inspire,…


      Rover Basics


      Each robotic explorer sent to the Red Planet has its own unique capabilities driven by science. Many attributes of a…


      Mars Exploration: Science Goals


      The key to understanding the past, present or future potential for life on Mars can be found in NASA’s four…

      View the full article
    • By European Space Agency
      As preparations continue to launch the Copernicus Sentinel-2C satellite on 4 September, the team at Europe’s Spaceport in Kourou, French Guiana, has bid farewell to their precious satellite as it was sealed from view within the Vega rocket fairing.
      View the full article
    • By Amazing Space
      LIVE SpaceX Starlink Launch
    • By Amazing Space
      LIVE SpaceX Starlink Launch
    • By NASA
      Technicians working inside the Payload Hazardous Servicing Facility at the agency’s Kennedy Space Center in Florida unfolded and fully extended the first of two five-panel solar arrays built for NASA’s Europa Clipper in preparation for inspection and cleaning as part of assembly, test, and launch operations. On March 6, technicians working inside the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center in Florida unfolded and fully extended the first of two five-panel solar arrays for the agency’s Europa Clipper spacecraft. Each solar array measures 46.5 feet in length. For the operation, the team suspended the solar array on a gravity offload support system that helps support the weight of the solar array while it’s here on Earth. Up next, technicians will begin inspecting and cleaning as part of assembly, test, and launch operations. Planned to arrive at Jupiter in April 2030, the mission will study Jupiter’s moon Europa, which shows strong evidence beneath its icy crust of a global ocean over twice the volume of all Earth’s oceans. The spacecraft will ship to Florida later this year from NASA’s Jet Propulsion Lab in Southern California in preparation for launch aboard a SpaceX Falcon Heavy rocket from Kennedy’s Launch Complex 39A. 
      Photo credit: NASA/Ben Smegelsky
      View the full article
  • Check out these Videos

×
×
  • Create New...