Jump to content

Recommended Posts

Posted
BepiColombo's sixth flyby route through Mercury's magnetic environment

On 8 January 2025, the ESA/JAXA BepiColombo mission will fly just 295 km above Mercury's surface, with a closest approach scheduled for 06:59 CET (05:59 UTC). It will use this opportunity to photograph Mercury, make unique measurements of the planet’s environment, and fine-tune science instrument operations before the main mission begins. This sixth and final flyby will reduce the spacecraft’s speed and change its direction, readying it for entering orbit around the tiny planet in late 2026.

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By SpaceX
      Starship | Sixth Flight Test
    • By NASA
      1 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      NASA’s X-59 quiet supersonic research aircraft completed its first maximum afterburner test at Lockheed Martin’s Skunk Works facility in Palmdale, California. This full-power test, during which the engine generates additional thrust, validates the additional power needed for meeting the testing conditions of the aircraft. The X-59 is the centerpiece of NASA’s Quesst mission, which aims to overcome a major barrier to supersonic flight over land by reducing the noise of sonic booms.Lockheed Martin Corporation/Garry Tice NASA completed the first maximum afterburner engine run test on its X-59 quiet supersonic research aircraft on Dec. 12. The ground test, conducted at Lockheed Martin’s Skunk Works facility in Palmdale, California, marks a significant milestone as the X-59 team progresses toward flight.
      An afterburner is a component of some jet engines that generates additional thrust. Running the engine, an F414-GE-100, with afterburner will allow the X-59 to meet its supersonic speed requirements. The test demonstrated the engine’s ability to operate within temperature limits and with adequate airflow for flight. It also showed the engine’s ability to operate in sync with the aircraft’s other subsystems.
      The X-59 is the centerpiece of NASA’s Quesst mission, which seeks to solve one of the major barriers to supersonic flight over land by making sonic booms quieter. The X-59’s first flight is expected to occur in 2025.
      Share
      Details
      Last Updated Dec 20, 2024 EditorDede DiniusContactMatt Kamletmatthew.r.kamlet@nasa.gov Related Terms
      Aeronautics Aeronautics Research Mission Directorate Armstrong Flight Research Center Commercial Supersonic Technology Integrated Aviation Systems Program Low Boom Flight Demonstrator Quesst (X-59) Supersonic Flight Explore More
      2 min read NASA, Notre Dame Connect Students to Inspire STEM Careers
      Article 4 hours ago 2 min read NASA Flight Rerouting Tool Curbs Delays, Emissions
      Article 4 hours ago 3 min read Atmospheric Probe Shows Promise in Test Flight
      Article 1 week ago Keep Exploring Discover More Topics From NASA
      Armstrong Flight Research Center
      Aeronautics
      Supersonic Flight
      Quesst: The Vehicle
      View the full article
    • By European Space Agency
      On 1 December 2024, BepiColombo flew past Mercury for the fifth time. During this flyby, BepiColombo became the first spacecraft ever to observe Mercury in mid-infrared light. The new images reveal variations in temperature and composition across the planet's cratered surface.
      View the full article
    • By European Space Agency
      Image: BepiColombo's fifth Mercury flyby View the full article
    • By NASA
      NASA/Ben Smegelsky Employees at NASA’s Kennedy Space Center in Florida and NASA astronaut Victor Glover (right) happily snap a photo of themselves during a visit on Nov. 8, 2024. The employees are part of the agency’s Exploration Ground Systems (EGS), which develops and operates the systems and facilities needed to process and launch rockets and spacecraft for NASA’s Artemis missions. EGS plays a primary role in assembly, launch, and recovery of rockets and spacecraft.
      Image credit: NASA/Ben Smegelsky
      View the full article
  • Check out these Videos

×
×
  • Create New...