Members Can Post Anonymously On This Site
White Sands Test Facility Encourages Locals to Leave Their Footprint on the Space Industry
-
Similar Topics
-
By Space Force
With the application window for Space Force special duty assignments for calendar year 2025 now open, Guardians have the opportunity to expand the breadth and depth of their skills while gaining knowledge of another part of the Space Force enterprise outside their normal duties.
View the full article
-
By European Space Agency
ESA’s Proba-3 will be the first mission to create an artificial total solar eclipse by flying a pair of satellites 150 metres apart. For six hours at a time, it will be able to see the Sun’s faint atmosphere, the corona, in the hard-to-observe region between the Sun’s edge and 1.4 million kilometres from its surface. This new technology combined with the satellite pair’s unique extended orbit around Earth will allow Proba-3 to do important science, revealing secrets of the Sun, space weather and Earth’s radiation belts.
View the full article
-
By European Space Agency
Researchers have achieved a breakthrough in bringing 5G technology to space, marking a pivotal moment in telecommunications history. The 5G Infrastructure Study (5G-IS), funded by ESA’s Connectivity and Secure Communications directorate, has mapped out how satellites can deliver reliable 5G connectivity worldwide.
View the full article
-
By Space Force
SecAF Kendall delivered a speech to USAFA cadets about the qualities necessary for strong leadership and why capable, insightful, moral leaders are more essential than ever in defense of the nation.
View the full article
-
By NASA
Credit: NASA NASA has selected Sierra Lobo, Inc. of Fremont, Ohio, to provide for test operations, test support, and technical system maintenance activities at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.
The NASA Stennis Test Operations Contract is fixed-price, level-of-effort contract that has a value of approximately $47 million. The performance period begins July 1, 2025, and extends three years, with a one-year base period and two one-year option periods.
The contract will provide test operations support for customers in the NASA Stennis test complex. It also will cover the operation and technical systems maintenance of the high-pressure industrial water, high-pressure gas, and cryogenic propellant storage support areas, as well as providing welding, fabrication, machining, and component processing capabilities.
NASA Stennis is the nation’s largest propulsion test site, with infrastructure to support projects ranging from component and subscale testing to large engine hot fires. Researchers from NASA, other government agencies, and private industry utilize NASA Stennis test facilities for technology and propulsion research and developmental projects.
For information about NASA and other agency programs, visit:
https://www.nasa.gov
-end-
Tiernan Doyle
Headquarters, Washington
202-358-1600
tiernan.doyle@nasa.gov
C. Lacy Thompson
Stennis Space Center, Bay St. Louis, Mississippi
228-363-5499
calvin.l.thompson@nasa.gov
Share
Details
Last Updated Nov 21, 2024 LocationNASA Headquarters Related Terms
Stennis Space Center NASA Centers & Facilities Stennis Test Facility and Support Infrastructure View the full article
-
-
Check out these Videos
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.