Jump to content

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      Carrying a suite of NASA science and technology, Firefly Aerospace’s Blue Ghost Mission 1 successfully landed at 3:34 a.m. EST on Sunday, March 2, 2025, near a volcanic feature called Mons Latreille within Mare Crisium, a more than 300-mile-wide basin located in the northeast quadrant of the Moon’s near side.Firefly Aerospace The shadow of Firefly Aerospace’s Blue Ghost lunar lander can be seen in this photo from the Moon, taken after landing on March 2, 2025. The lander safely delivered a suite of 10 NASA science and technology instruments; these instruments will operate on the lunar surface for approximately one lunar day, or about 14 Earth days. The successful Moon delivery is part of NASA’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign. This is the first CLPS delivery for Firefly, and their first Moon landing.  
      Learn more about Blue Ghost Mission 1.
      Image credit: Firefly Aerospace
      View the full article
    • By NASA
      First image captured by Firefly’s Blue Ghost lunar lander, taken shortly after confirmation of a successful landing at Mare Crisium on the Moon’s near side. This is the second lunar delivery of NASA science and tech instruments as part of the agency’s Commercial Lunar Payload Services initiative.Credit: Firefly Aerospace Carrying a suite of NASA science and technology, Firefly Aerospace’s Blue Ghost Mission 1 successfully landed at 3:34 a.m. EST on Sunday near a volcanic feature called Mons Latreille within Mare Crisium, a more than 300-mile-wide basin located in the northeast quadrant of the Moon’s near side.
      The Blue Ghost lander is in an upright and stable configuration, and the successful Moon delivery is part of NASA’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign. This is the first CLPS delivery for Firefly, and their first Moon landing.  
      The 10 NASA science and technology instruments aboard the lander will operate on the lunar surface for approximately one lunar day, or about 14 Earth days.
      “This incredible achievement demonstrates how NASA and American companies are leading the way in space exploration for the benefit of all,” said NASA acting Administrator Janet Petro. “We have already learned many lessons – and the technological and science demonstrations onboard Firefly’s Blue Ghost Mission 1 will improve our ability to not only discover more science, but to ensure the safety of our spacecraft instruments for future human exploration – both in the short term and long term.”
      Since launching from NASA’s Kennedy Space Center in Florida on Jan. 15, Blue Ghost traveled more than 2.8 million miles, downlinked more than 27 GB of data, and supported several science operations. This included signal tracking from the Global Navigation Satellite System (GNSS) at a record-breaking distance of 246,000 miles with the Lunar GNSS Receiver Experiment payload – showing NASA can use the same positioning systems on Earth when at the Moon. Science conducted during the journey also included radiation tolerant computing through the Van Allen Belts with the Radiation-Tolerant Computer System payload and measurements of magnetic field changes in space with the Lunar Magnetotelluric Sounder payload.
      “The science and technology we send to the Moon now helps prepare the way for future NASA exploration and long-term human presence to inspire the world for generations to come,” said Nicky Fox, associate administrator for science at NASA Headquarters in Washington. “We’re sending these payloads by working with American companies – which supports a growing lunar economy.”
      During surface operations, the NASA instruments will test and demonstrate lunar subsurface drilling technology, regolith sample collection capabilities, global navigation satellite system abilities, radiation tolerant computing, and lunar dust mitigation methods. The data captured will benefit humanity by providing insights into how space weather and other cosmic forces impact Earth.  
      Before payload operations conclude, teams will aim to capture imagery of the lunar sunset and how lunar dust reacts to solar influences during lunar dusk conditions, a phenomenon first documented by former NASA astronaut Eugene Cernan on Apollo 17. Following the lunar sunset, the lander will operate for several hours into the lunar night.
      “On behalf of our entire team, I want to thank NASA for entrusting Firefly as their lunar delivery provider,” said Jason Kim, CEO of Firefly Aerospace. “Blue Ghost’s successful Moon landing has laid the groundwork for the future of commercial exploration across cislunar space. We’re now looking forward to more than 14 days of surface operations to unlock even more science data that will have a substantial impact on future missions to the Moon and Mars.”
      To date, five vendors have been awarded 11 lunar deliveries under CLPS and are sending more than 50 instruments to various locations on the Moon, including the lunar South Pole. Existing CLPS contracts are indefinite-delivery, indefinite-quantity contracts with a cumulative maximum contract value of $2.6 billion through 2028. 
      Learn more about NASA’s CLPS initiative at:
      https://www.nasa.gov/clps
      -end-
      Amber Jacobson / Karen Fox 
      Headquarters, Washington
      202-358-1600
      amber.c.jacobson@nasa.gov / karen.c.fox@nasa.gov 
      Natalia Riusech / Nilufar Ramji
      Johnson Space Center, Houston
      281-483-5111
      nataila.s.riusech@nasa.gov / nilufar.ramji@nasa.gov
      Antonia Jaramillo
      Kennedy Space Center, Florida
      321-501-8425
      antonia.jaramillobotero@nasa.gov
      Share
      Details
      Last Updated Mar 02, 2025 LocationNASA Headquarters Related Terms
      Commercial Lunar Payload Services (CLPS) Artemis Earth's Moon Science & Research Science Mission Directorate View the full article
    • By NASA
      NASA/Brandon Torres Navarrete Engineers at NASA’s Ames Research Center in California’s Silicon Valley, Bohdan Wesely, right, and Eli Hiss, left, complete a fit check of the two halves of a space capsule that will study the clouds of Venus for signs of life.
      Led by Rocket Lab of Long Beach, California, and their partners at the Massachusetts Institute of Technology in Cambridge, Rocket Lab’s Venus mission will be the first private mission to the planet.
      NASA’s role is to help the commercial space endeavor succeed by providing expertise in thermal protection of small spacecraft. Invented at Ames, NASA’s Heatshield for Extreme Entry Environment Technology (HEEET) – the brown, textured material covering the bottom of the capsule in this photo – is a woven heat shield designed to protect spacecraft from temperatures up to 4,500 degrees Fahrenheit. The probe will deploy from Rocket Lab’s Photon spacecraft bus, taking measurements as it descends through the planet’s atmosphere.
      Teams at Ames work with private companies, like Rocket Lab, to turn NASA materials into solutions such as the heat shield tailor-made for this spacecraft destined for Venus, supporting growth of the new space economy. NASA’s Small Spacecraft Technology program, part of the agency’s Space Technology Mission Directorate, supported development of the heat shield for Rocket Lab’s Venus mission.

      View the full article
    • By European Space Agency
      Image: The first metal 3D part ever created on orbit has landed on Earth. 
      The sample was produced in ESA’s Metal 3D Printer on the International Space Station. Now, it’s on Earth for the first time, at ESA’s technical heart in the Netherlands (ESTEC). 
      The printer, developed by Airbus and its partners, was installed in the Columbus module by ESA astronaut Andreas Mogensen during his Huginn mission in January 2024. In June, the facility succeeding in making its first print, a curvy line in the shape of an 'S’. In summer, the printer produced its first full sample, and then a second sample in December. 
      This first sample will now be tested in the Materials and Electrical Components Laboratory at ESTEC and compared to samples printed on Earth to understand how microgravity affects the printing process. 
      The second sample will be handed over to the Technical University of Denmark (DTU). 
      While astronauts have operated plastic 3D printers on the International Space Station before, this marks the first successful metal printing on orbit. As missions venture farther from Earth, in-space manufacturing will be crucial for self-sufficiency, allowing astronauts to manufacture essential parts, repair equipment and create tools on demand, without relying on costly resupply missions. 
      View the full article
    • By European Space Agency
      Launched just two months ago and still in the process of being commissioned for service, the Copernicus Sentinel-1C satellite is, remarkably, already showing how its radar data can be used to map the shape of Earth’s land surface with extreme precision.
      These first cross-satellite ‘interferometry’ results assure its ability to monitor subsidence, uplift, glacier flow, and disasters such as landslides and earthquakes.
      View the full article
  • Check out these Videos

×
×
  • Create New...