Jump to content

RCRA Permit Modification


NASA

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      NASA has awarded a task order modification to the Aerospace Testing and Facilities Operations and Maintenance (ATOM-5) contract to Jacobs Technology Inc., of Tullahoma, Tennessee, to provide the agency’s Ames Research Center in California’s Silicon Valley, with an upgrade to the center’s Unitary Plan Wind Tunnel main drive speed control variable frequency drive. 
      The ATOM-5 award is a cost-plus fixed-fee indefinite-delivery indefinite-quantity contract that supports several experiments in the ground-based aerospace facilities at Ames, including wind tunnels, high-enthalpy arc jet facilities, and the Sensor and Thermal Protection System Advanced Research Lab. The task order award value is $41 million with a period of performance through Oct. 1, 2027.
      The project will upgrade the electrical system of its wind tunnel to improve the efficiency and capability of the main drive motors. These motors are required to operate the 11-by-11-foot Transonic Wind Tunnel and 9-by-7-foot Supersonic Wind Tunnel facilities at Ames. The upgrade is expected to result in improved facility reliability, reductions in annual power and water usage, reduction of maintenance requirements, and elimination of environmental hazards allowing the facility to continue to support NASA missions and programs into the future.
      For information about NASA and agency programs, visit:
      https://www.nasa.gov

      -end-
      Rachel Hoover
      Ames Research Center, Silicon Valley, Calif.
      650-604-4789
      rachel.hoover@nasa.gov
      View the full article
    • By NASA
      Repair, Refurbishment, and Modification


      WSTF Staff Components can be refurbished as a cost effective alternative to the cost of new equipment.
      Credits: NASA WSTF

      Our engineers refurbish, repair, and redesign fluid components such as check valves, relief valves, solenoid valves, and manual valves ensuring relief valves and other components are operating within manufacturer’s specifications and comply with the requirements of
      American National Standards Institute (ANSI)/NB 23, American Society of Mechanical Engineers (ASME) Code, Section VIII, Div. 1, and the National Board Inspection Code (NBIC). Facilities and Certifications
      Component Services is an approved “VR” certified facility holding the National Board Inspection Code (NBIC) Certificate of Authorization and “VR” Symbol Stamp for the repair of pressure relief valves. 
      Our team is also certified to manufacture flight hardware by NASA and the International Space Station (ISS) Program.
      Repair and Refurbishment
      Repair and refurbishment is a cost effective alternative to replacement and our highly skilled team disassembles, inspects, and precision cleans each item received. We ensure the parts being used for repair and replacement are from the original manufacturer, or from a vendor approved by the National Board verifying replacement parts meet original manufacturer specifications. Spares and replacements can be manufactured by our in-house NASA certified Machining and Fabrication workforce to replace parts that are no longer commercially available.
      Modification
      Equipment can be modified to work safely in your pressure system or in specific media such as oxidizer, oxygen service, fuels, and propellants. Guided by the knowledge gained from 40 years or research and testing by our Oxygen System and Propellants and Aerospace Fluids engineers, our team can modify equipment with recommended parts to operated safely and avoid costly mistakes created by using the wrong components.
      Last Updated: Aug 6, 2017
      Editor: Judy Corbett
      View the full article
  • Check out these Videos

×
×
  • Create New...