Members Can Post Anonymously On This Site
U.S. Space Command begins dual-track operations of spaceflight safety services with Office of Space Commerce
-
Similar Topics
-
By European Space Agency
ESA’s Proba-3 will be the first mission to create an artificial total solar eclipse by flying a pair of satellites 150 metres apart. For six hours at a time, it will be able to see the Sun’s faint atmosphere, the corona, in the hard-to-observe region between the Sun’s edge and 1.4 million kilometres from its surface. This new technology combined with the satellite pair’s unique extended orbit around Earth will allow Proba-3 to do important science, revealing secrets of the Sun, space weather and Earth’s radiation belts.
View the full article
-
By European Space Agency
Researchers have achieved a breakthrough in bringing 5G technology to space, marking a pivotal moment in telecommunications history. The 5G Infrastructure Study (5G-IS), funded by ESA’s Connectivity and Secure Communications directorate, has mapped out how satellites can deliver reliable 5G connectivity worldwide.
View the full article
-
By NASA
Caption: Artist’s concept of Dragonfly soaring over the dunes of Saturn’s moon Titan. NASA/Johns Hopkins APL/Steve Gribben NASA has selected SpaceX to provide launch services for the Dragonfly mission, a rotorcraft lander mission under NASA’s New Frontiers Program, designed to explore Saturn’s moon Titan. The mission will sample materials and determine surface composition in different geologic settings, advancing our search for the building blocks of life.
The firm-fixed-price contract has a value of approximately $256.6 million, which includes launch services and other mission related costs. The Dragonfly mission currently has a targeted launch period from July 5, 2028, to July 25, 2028, on a SpaceX Falcon Heavy rocket from Launch Complex 39A at NASA’s Kennedy Space Center in Florida.
Dragonfly centers on novel approach to planetary exploration, employing a rotorcraft-lander to travel between and sample diverse sites on Saturn’s largest moon. With contributions from partners around the globe, Dragonfly’s scientific payload will characterize the habitability of Titan’s environment, investigate the progression of prebiotic chemistry on Titan, where carbon-rich material and liquid water may have mixed for an extended period, and search for chemical indications of whether water-based or hydrocarbon-based life once existed on Saturn’s moon.
NASA’s Launch Services Program at the agency’s Kennedy Space Center is responsible for managing the launch service. Managed for NASA at Johns Hopkins Applied Physics Laboratory in Laurel, Maryland, the Dragonfly team comprises scientists, engineers, technologists, managers and more who have deep experience on missions that have explored the solar system from the Sun to Pluto and beyond, as well as experts in rotorcraft, autonomous flight, and space systems from around the globe. Dragonfly is the fourth mission in NASA’s New Frontiers Program, managed by NASA’s Marshall Space Flight Center in Huntsville, Alabama, for the agency’s Science Mission Directorate in Washington.
For more information about NASA programs and missions, visit:
https://www.nasa.gov
-end-
Julian Coltre / Tiernan Doyle
Headquarters, Washington
202-358-1600
julian.n.coltre@nasa.gov / tiernan.p.doyle@nasa.gov
View the full article
-
By NASA
NASA has awarded Bastion Technologies Inc., of Houston, the Center Occupational Safety, Health, Medical, System Safety and Mission Assurance Contract (COSMC) at the agency’s Ames Research Center in California’s Silicon Valley.
The COSMC contract is a hybrid cost-plus-fixed-fee and firm-fixed-price contract, with an indefinite-delivery/indefinite-quantity component and maximum potential value of $53 million. The contract phase-in begins Thursday, Jan. 2, 2025, followed by a one-year base period that begins Feb. 14, 2025, and options to extend performance through Aug. 13, 2030.
Under this contract, the company will provide support for occupational safety, industrial hygiene, health physics, safety and health training, emergency response, safety culture, medical, wellness, fitness, and employee assistance. The contractor also will provide subject matter expertise in several areas including system safety, software safety and assurance, quality assurance, pressure system safety, procurement quality assurance, and range safety. Work will primarily be performed at NASA Ames and NASA’s Armstrong Flight Research Center in Edwards, California, as needed.
For information about NASA and agency programs, visit:
https://www.nasa.gov
-end-
Tiernan Doyle
NASA Headquarters, Washington
202-358-1600
tiernan.p.doyle@nasa.gov
Rachel Hoover
Ames Research Center, Silicon Valley, Calif.
650-604-4789
rachel.hoover@nasa.gov
View the full article
-
By NASA
Credit: NASA NASA has selected Sierra Lobo, Inc. of Fremont, Ohio, to provide for test operations, test support, and technical system maintenance activities at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.
The NASA Stennis Test Operations Contract is fixed-price, level-of-effort contract that has a value of approximately $47 million. The performance period begins July 1, 2025, and extends three years, with a one-year base period and two one-year option periods.
The contract will provide test operations support for customers in the NASA Stennis test complex. It also will cover the operation and technical systems maintenance of the high-pressure industrial water, high-pressure gas, and cryogenic propellant storage support areas, as well as providing welding, fabrication, machining, and component processing capabilities.
NASA Stennis is the nation’s largest propulsion test site, with infrastructure to support projects ranging from component and subscale testing to large engine hot fires. Researchers from NASA, other government agencies, and private industry utilize NASA Stennis test facilities for technology and propulsion research and developmental projects.
For information about NASA and other agency programs, visit:
https://www.nasa.gov
-end-
Tiernan Doyle
Headquarters, Washington
202-358-1600
tiernan.doyle@nasa.gov
C. Lacy Thompson
Stennis Space Center, Bay St. Louis, Mississippi
228-363-5499
calvin.l.thompson@nasa.gov
Share
Details
Last Updated Nov 21, 2024 LocationNASA Headquarters Related Terms
Stennis Space Center NASA Centers & Facilities Stennis Test Facility and Support Infrastructure View the full article
-
-
Check out these Videos
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.