Jump to content

40 Years Ago: STS-41D – First Space Shuttle Launch Pad Abort


Recommended Posts

  • Publishers
Posted

In 1983, NASA received delivery of Discovery, the third space qualified vehicle in the agency’s space shuttle fleet. During the launch attempt for the STS-41D mission on June 26, 1984, Discovery’s onboard computers halted the countdown four seconds before liftoff, and after two of its main engines had already ignited. The six astronauts safely egressed the orbiter. This first on-the-pad abort of the shuttle program required the vehicle’s return to its assembly building for replacement of the faulty engine that caused the shutdown. The resulting two-month delay caused a shuffling of the mission’s payloads, but Discovery finally lifted off on Aug. 30, and the astronauts completed a successful six-day mission, deploying three commercial satellites, testing a new solar array, and conducting a commercial biotechnology experiment.

Space shuttle Discovery rolls out of Rockwell’s Palmdale facility Discovery atop the Shuttle Carrier Aircraft during the cross-country ferry flight Discovery arrives at NASA’s Kennedy Space Center in Florida
Left: Space shuttle Discovery rolls out of Rockwell’s Palmdale facility. Middle: Discovery atop the Shuttle Carrier Aircraft during the cross-country ferry flight. Right: Discovery arrives at NASA’s Kennedy Space Center in Florida.

Discovery rolled out of Rockwell International’s plant in Palmdale, California, on Oct. 16, 1983. Five of the six crew members assigned to its first flight attended the ceremony. Workers trucked Discovery overland from Palmdale to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base (AFB). Discovery arrived at NASA’s Kennedy Space Center (KSC) on Nov. 9 after a cross-country ferry flight from Edwards, following a two-day stopover at Vandenberg Air Force, now Space Force, Base in California, atop the Shuttle Carrier Aircraft, a modified Boeing 747. Discovery, named after several historical ships of exploration, incorporated manufacturing lessons learned from the first orbiters as well as through the use of more advanced materials. The new vehicle weighed nearly 8,000 pounds less than its sister ship Columbia and 700 pounds less than Challenger.

The STS-41D crew patch The STS-41D crew of R. Michael “Mike” Mullane, front row left, Steven A. Hawley, Henry W. “Hank” Hartsfield, and Michael D. Coats; and Charles D. Walker, back row left, and Judith A. Resnik
Left: The STS-41D crew patch. Right: The STS-41D crew of R. Michael “Mike” Mullane, front row left, Steven A. Hawley, Henry W. “Hank” Hartsfield, and Michael D. Coats; and Charles D. Walker, back row left, and Judith A. Resnik.

To fly Discovery’s first flight, originally designated STS-12 and later renamed STS-41D, in February 1983 NASA assigned Commander Henry W. Hartsfield, a veteran of STS-4, and first-time flyers Pilot Michael L. Coats, and Mission Specialists R. Michael Mullane, Steven A. Hawley, and Judith A. Resnik, all from the 1978 class of astronauts. In May 1983, NASA announced the addition of Charles D. Walker, an employee of the McDonnell Douglas Corporation, to the crew, flying as the first commercial payload specialist. He would operate the company’s Continuous Flow Electrophoresis System (CFES) experiment. The mission’s primary payloads included the Leasat-1 (formerly known as Syncom IV-1) commercial communications satellite and OAST-1, three experiments from NASA’s Office of Aeronautics and Space Technology, including the Solar Array Experiment, a 105-foot long lightweight deployable and retractable solar array.

Workers in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida lift Discovery to mate it with its external tank and solid rocket boosters Initial rollout of Discovery from the VAB to Launch Pad 39A on May 19, 1984 The Flight Readiness Firing on June 2
Left: Workers in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida lift Discovery to mate it with its external tank and solid rocket boosters. Middle: Initial rollout of Discovery from the VAB to Launch Pad 39A on May 19, 1984. Right: The Flight Readiness Firing on June 2.

The day after its arrival at KSC, workers towed Discovery from the SLF to the Orbiter Processing Facility (OPF) to being preparing it for its first space flight. Between Dec. 9, 1983, and Jan. 10, 1984, it entered temporary storage in the Vehicle Assembly Building (VAB) to allow postflight processing of Columbia in the OPF following STS-9. Workers returned Discovery to the OPF for final processing, towing it to the VAB on May 12 for mating with its External Tank (ET) and Solid Rocket Boosters (SRBs). The completed stack rolled out to Launch Pad 39A on May 19. On June 2, engineers successfully completed an 18-second Flight Readiness Firing of the shuttle main engines. Post test inspections revealed a debonding of a thermal shield in main engine number 1’s combustion chamber, requiring its replacement at the pad. The work pushed the planned launch date back three days to June 25.

The June 26 launch abort Discovery’s three main engines hours after the launch abort
Left: The June 26 launch abort. Right: Discovery’s three main engines hours after the launch abort.

The failure of the shuttle’s backup General Purpose Computer (GPC) caused a one-day delay of the first launch attempt on June 25. On June 26, the countdown proceeded smoothly and at T minus 6.6 seconds the orbiter’s GPCs began the serial ignition sequence of the three main engines. Normally, the three engines ignite at 0.12-second intervals to ease stress on the system and to allow onboard computers to diagnose any problems. Engines number 2 and 3, forming the base of the triangle closest to the body flap, ignited as planned, but engine number 1 at the apex of the triangle and nearest the vertical tail, did not ignite at all. This caused the Redundant Set Launch Sequencer (RSLS) to shut the two working engines down, calling an abort to the countdown at T minus 4 seconds. To ease the tension, Hawley reportedly said, “Gee, I thought we’d be a little higher at main engine cutoff.” The fact that engine number 1 had never ignited caused some momentary confusion as displays showed that the RSLS had not shut it down. A single engine still burning with the shuttle still on the pad would have led to a disaster. Once controllers and the onboard crew realized what had actually happened, they calmed down somewhat. What no one realized at the time is that a hydrogen fire, invisible to the naked eye, had broken out at the aft end of the orbiter. Had the crew evacuated at that time, they would have run through the invisible flames. The pad’s fire suppression system came on to deal with the fire, and when the crew did finally egress the shuttle, they received a good dousing of water. The crew returned safely, if a little drenched, to crew quarters. After ground teams assessed the cause of the abort, they made the decision to roll the stack back to the VAB, demate Discovery from the ET and SRBs and tow it back to the OPF. Workers replaced the faulty engine, and Discovery rolled back out to the launch pad on Aug. 9 for another launch attempt 20 days later, delayed by one day due to a software issue, and finally on Aug. 30, Discovery roared off its launch pad on a pillar of flame and within 8 minutes, NASA’s newest orbiter reached low Earth orbit.

Gemini VI launch pad abort in December 1965 Gemini VI crew of Thomas P. Stafford, left, and Walter M. Schirra
Left: Gemini VI launch pad abort in December 1965. Right: Gemini VI crew of Thomas P. Stafford, left, and Walter M. Schirra.

Although the first on the pad abort of the space shuttle program, the June 1984 attempt to launch Discovery on STS-41D represented the second such incident in the American human spaceflight program. The dubious honor of the first on the pad abort belongs to Gemini VI. On Dec. 12, 1965, astronauts Walter M. Schirra and Thomas P. Stafford strapped into the spacecraft for their second launch attempt to rendezvous with Gemini VII. The countdown clock ticked down to zero, and the Titan-II rocket’s first stage engines ignited. And shut off after just 1.2 seconds. Although the mission clock aboard the spacecraft had started, the rocket had not lifted off, and Schirra made the split-second decision not to eject himself and Stafford from the spacecraft. Engineers later traced the cause of the abort to a dust cap inadvertently left in the engine compartment. After workers took care of that issue, Schirra and Stafford tried to launch again on Dec. 15, and the third time proved to be the charm. 

STS-51F in August 1985 STS-55 in March 1993 STS-51 in August 1993 STS-68 in August 1994
Four space shuttle on-the-pad aborts. STS-51F in August 1985, left, STS-55 in March 1993, STS-51 in August 1993, and STS-68 in August 1994.

In the 10 years following the June 1984 abort, four additional shuttle launch attempts ended with an RSLS abort after at least one main engine had ignited.

July 12, 1985, STS-51F space shuttle Challenger

The RSLS executed a shutdown at T minus 3 seconds, after all three main engines had ignited, because the number two main engine’s chamber coolant valve did not close as rapidly as needed for startup. Investigations revealed a faulty sensor as the real culprit, and workers replaced it at the pad. Challenger launched successfully on July 29, but during ascent engine number 1 shut down, the only inflight failure of a main engine, resulting in the only abort to orbit of the program. Although the shuttle achieved a slightly lower than planned orbit, the mission met most of its science objectives.

March 22, 1993, STS-55 space shuttle Columbia

Following a trouble-free countdown, Columbia’s three main engines came to life at as planned, but three seconds later, the RSLS shut them all down when it detected that engine number 3 had not come up to full power. A tiny fragment of rubber caused a valve in the liquid oxygen system to leak, preventing the engine from fully starting. Columbia borrowed three main engines from Endeavour, and STS-55 took off on April 26 to carry out its German Spacelab-D2 mission.

Aug. 12, 1993, STS-51 space shuttle Discovery

After a trouble-free preflight processing and countdown, Discovery’s three main engines ignited as planned at T minus 6.6 seconds. Three seconds later, all three engines shut down. Investigation revealed the cause as a faulty sensor that monitors fuel flow through main engine number 2. Workers replaced all three engines at the pad, and Discovery took off on Sept. 12 to carry out its mission.

Aug. 18, 1994, STS-68 space shuttle Endeavour

Following a smooth countdown, Endeavour’s three main engines began their startup sequence at T minus 6.6 seconds. The GLS computers detected a problem with the No. 3 main engine’s High Pressure Oxidizer Turbine. One of its sensors detected a dangerously high discharge temperature, exceeding the rules of the Launch Commit Criteria, and Endeavour’s computers halted the countdown a mere 1.9 seconds before liftoff. Workers rolled Endeavour back to the VAB, replacing its three main engines with ones borrowed from Atlantis. STS-68 finally took off on Sept. 30 and successfully completed its radar mapping mission. NASA astronaut Daniel W. Bursch holds the distinction as the only person to have experienced two on-the-pad aborts, as he served as a mission specialist on both STS-51 and STS-68.

The lessons learned from these on-the-pad abort experiences can inform current and future programs. For example, the Space Launch System (SLS) uses main engines leftover from the space shuttle program to power its booster stage. And operationally, other launcher systems can learn from these experiences and safely manage similar future events.

Read recollections of the STS-41D mission by Hartsfield, Coats, Mullane, Hawley, and Walker in their oral histories with the JSC History Office.

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Space Force
      These Firm Fixed-Price, Indefinite-Delivery Requirements contracts were awarded to SpaceX, United Launch Services, and Blue Origin to provide critical space support to meet national security objectives.

      View the full article
    • By NASA
      Credit: NASA NASA acting Administrator Janet Petro and acting Associate Administrator Vanessa Wyche will lead the agency’s delegation at the 40th Space Symposium, Monday, April 7 through Thursday, April 10, in Colorado Springs, Colorado.
      Petro will join Space Foundation Chief Executive Officer Heather Pringle for a fireside chat to discuss NASA’s current priorities and partnerships at 12:15 p.m. EDT on Tuesday, April 8.
      Additional NASA participation in the conference includes a one-on-one discussion with Nicola Fox, associate administrator, Science Mission Directorate, and a lunar science and exploration panel featuring Lori Glaze, acting associate administrator, Exploration Systems Development Mission Directorate.
      A full agenda for this year’s Space Symposium is available online.
      Conference attendees will have the opportunity to learn more about NASA’s missions and projects on a variety of topics during brief talks with subject matter experts in the agency’s exhibit space.
      NASA will provide photos and updates about its participation in the Space Symposium from its @NASAExhibit account on X.
      For more information about NASA, visit:
      https://www.nasa.gov
      -end-
      Amber Jacobson
      Headquarters, Washington
      202-358-1600
      amber.c.jacobson@nasa.gov
      Share
      Details
      Last Updated Apr 04, 2025 EditorJessica TaveauLocationNASA Headquarters Related Terms
      Leadership Exploration Systems Development Mission Directorate Science Mission Directorate View the full article
    • By NASA
      2 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting.Josh Valcarcel A core component of Gateway, humanity’s first space station around the Moon, is now on American soil and one step closer to launch. In lunar orbit, Gateway will support NASA’s Artemis campaign to return humans to the Moon and chart a path of scientific discovery toward the first crewed missions to Mars.
      Gateway’s first pressurized module and one of its two foundational elements, HALO (Habitation and Logistics Outpost), arrived in Arizona on April 1. Fresh off a transatlantic journey from Thales Alenia Space in Turin, Italy, the structure will undergo final outfitting at Northrop Grumman’s integration and test facility before being integrated with Gateway’s Power and Propulsion Element at NASA’s Kennedy Space Center in Florida. The pair of modules will launch together on a SpaceX Falcon Heavy rocket.
      Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting.NASA/Josh Valcarcel Gateway’s HALO will provide Artemis astronauts with space to live, work, conduct scientific research, and prepare for missions to the lunar surface. It will offer command and control, data handling, energy storage, electrical power distribution, thermal regulation, and communications and tracking via Lunar Link, a high-rate lunar communication system provided by ESA (European Space Agency). The module will include docking ports for visiting vehicles such as NASA’s Orion spacecraft, lunar landers, and logistics modules. It will also support both internal and external science payloads, enabling research and technology demonstrations in the harsh deep space environment.
      Built with industry and international partners, Gateway will support sustained exploration of the Moon, serve as a platform for science and international collaboration, and act as a proving ground for the technologies and systems needed for future human missions to Mars.
      Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting.NASA/Josh Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting.NASA/Josh Valcarcel At the Thales Alenia Space facility in Turin, Italy, technicians prepare Gateway’s HALO (Habitation and Logistics Outpost) for transport. The module’s primary structure, fabricated by Thales Alenia Space, will travel to Northrop Grumman’s facility in Gilbert, Arizona, for final outfitting ahead of its launch to lunar orbit. Thales Alenia Space At the Thales Alenia Space facility in Turin, Italy, technicians prepare Gateway’s HALO (Habitation and Logistics Outpost) for transport. The module’s primary structure, fabricated by Thales Alenia Space, will travel to Northrop Grumman’s facility in Gilbert, Arizona, for final outfitting ahead of its launch to lunar orbit. Thales Alenia Space At the Thales Alenia Space facility in Turin, Italy, technicians prepare Gateway’s HALO (Habitation and Logistics Outpost) for transport. The module’s primary structure, fabricated by Thales Alenia Space, will travel to Northrop Grumman’s facility in Gilbert, Arizona, for final outfitting ahead of its launch to lunar orbit. Thales Alenia Space Gateway’s HALO (Habitation and Logistics Outpost) departs Italy en route to Arizona, where it will undergo final outfitting at Northrop Grumman’s facility in Gilbert ahead of its launch to lunar orbit. The module’s primary structure was fabricated by Thales Alenia Space in Turin. Thales Alenia Space Gateway’s HALO (Habitation and Logistics Outpost) departs Italy en route to Arizona, where it will undergo final outfitting at Northrop Grumman’s facility in Gilbert ahead of its launch to lunar orbit. The module’s primary structure was fabricated by Thales Alenia Space in Turin. Thales Alenia Space Gateway’s HALO (Habitation and Logistics Outpost) departs Italy en route to Arizona, where it will undergo final outfitting at Northrop Grumman’s facility in Gilbert ahead of its launch to lunar orbit. The module’s primary structure was fabricated by Thales Alenia Space in Turin. Thales Alenia Space Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting. Josh Valcarcel – NASA – JSC Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting.Josh Valcarcel – NASA – JSC Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting. Josh Valcarcel – NASA – JSC Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting. Josh Valcarcel – NASA – JSC Gateway’s HALO (Habitation and Logistics Outpost) arrives in Mesa, Arizona, after traveling from Italy, where Thales Alenia Space fabricated its primary structure. Delivered by cargo aircraft to Phoenix-Mesa Gateway Airport, HALO will be transported to Northrop Grumman’s facility in Gilbert for final outfitting. Josh Valcarcel – NASA – JSC Download additional high-resolution images of HALO here.
      Learn More About Gateway Facebook logo @NASAGateway @NASA_Gateway Instagram logo @nasaartemis Share
      Details
      Last Updated Apr 04, 2025 ContactLaura RochonLocationJohnson Space Center Related Terms
      Artemis Artemis 4 Earth's Moon Exploration Systems Development Mission Directorate Gateway Program Gateway Space Station Humans in Space Johnson Space Center Explore More
      2 min read NASA Prepares Gateway Lunar Space Station for Journey to Moon
      Assembly is underway for Gateway's Power and Propulsion Element, the module that will power the…
      Article 1 month ago 5 min read NASA Marks Artemis Progress With Gateway Lunar Space Station
      NASA and its international partners are making progress on Gateway – the lunar space station…
      Article 1 month ago 2 min read Advanced Modeling Enhances Gateway’s Lunar Dust Defense
      Ahead of more frequent and intense contact with dust during Artemis missions, NASA is developing…
      Article 2 months ago Keep Exploring Discover More Topics From NASA
      Humans In Space
      Orion Spacecraft
      Extravehicular Activity and Human Surface Mobility
      Human Landing System

      View the full article
    • By NASA
      NASA astronaut Christopher Williams poses for a portrait at NASA’s Johnson Space Center in Houston, Texas.Credit: NASA NASA astronaut Chris Williams will embark on his first mission to the International Space Station, serving as a flight engineer and Expedition 74 crew member.
      Williams will launch aboard the Roscosmos Soyuz MS-28 spacecraft in November, accompanied by Roscosmos cosmonauts Sergey Kud-Sverchkov and Sergei Mikaev. After launching from the Baikonur Cosmodrome in Kazakhstan, the trio will spend approximately eight months aboard the orbiting laboratory.
      During his expedition, Williams will conduct scientific investigations and technology demonstrations that help prepare humans for future space missions and benefit humanity.
      Selected as a NASA astronaut in 2021, Williams graduated with the 23rd astronaut class in 2024. He began training for his first space station flight assignment immediately after completing initial astronaut candidate training.
      Williams was born in New York City, and considers Potomac, Maryland, his hometown. He holds a bachelor’s degree in Physics from Stanford University in California and a doctorate in Physics from the Massachusetts Institute of Technology in Cambridge, where his research focused on astrophysics. Williams completed Medical Physics Residency training at Harvard Medical School in Boston. He was working as a clinical physicist and researcher at the Brigham and Women’s Hospital in Boston when he was selected as an astronaut.
      For more than two decades, people have lived and worked continuously aboard the International Space Station, advancing scientific knowledge and making research breakthroughs not possible on Earth. The station is a critical testbed for NASA to understand and overcome the challenges of long-duration spaceflight and to expand commercial opportunities in low Earth orbit. As commercial companies focus on providing human space transportation services and destinations as part of a robust low Earth orbit economy, NASA is able to more fully focus its resources on deep space missions to the Moon and Mars.
      Learn more about International Space Station research and operations at:
      https://www.nasa.gov/station
      -end-
      Josh Finch / Claire O’Shea
      Headquarters, Washington
      202-358-1100
      joshua.a.finch@nasa.gov / claire.a.o’shea@nasa.gov
      Chelsey Ballarte
      Johnson Space Center, Houston
      281-483-5111
      chelsey.n.ballarte@nasa.gov
      Share
      Details
      Last Updated Apr 03, 2025 LocationNASA Headquarters Related Terms
      Humans in Space International Space Station (ISS) ISS Research Johnson Space Center View the full article
    • By NASA
      NASA Astronaut Jonny Kim Soyuz MS-27 Launch
  • Check out these Videos

×
×
  • Create New...