Jump to content

55 Years Ago: Manned Orbiting Laboratory Cancellation


Recommended Posts

  • Publishers
Posted

The Manned Orbiting Laboratory (MOL), a joint classified project of the U.S. Air Force (USAF) and the National Reconnaissance Office (NRO), sought to establish a crewed platform in low Earth orbit to obtain high-resolution photographic imagery of America’s 1960s Cold War adversaries. Approved in 1965, the MOL Program envisioned a series of space stations launched from a new pad in California and placed in low polar Earth orbit. Two-man crews, launching and returning to Earth aboard modified Gemini-B capsules, would work aboard the stations for 30 days at a time. Although the Air Force selected 17 pilots and built prototype hardware, the program faced budget pressures and competition from rapidly advancing technologies in uncrewed reconnaissance capabilities, leading to its cancellation on June 10, 1969.

Patch of the Manned Orbiting Laboratory (MOL) Program Illustration of the MOL as it would have appeared in orbit Space Launch Complex-6 under construction in 1966 at Vandenberg Air Force (now Space Force) Base in California
Left: Patch of the Manned Orbiting Laboratory (MOL) Program. Middle: Illustration of the MOL as it would have appeared in orbit. Image credit: Courtesy National Air and Space Museum. Right: Space Launch Complex-6 under construction in 1966 at Vandenberg Air Force (now Space Force) Base in California. Image credit: Courtesy National Reconnaissance Office.

Announced by Defense Secretary Robert S. McNamara in December 1963 and formally approved by President Lyndon B. Johnson in August 1965, the MOL Program envisioned a series of 60-foot-long space stations in low polar Earth orbit, occupied by 2-person crews for 30 days at a time, launching and returning to Earth aboard modified Gemini-B capsules. Externally similar to NASA’s Gemini spacecraft, the MOL version’s major modification involved a hatch cut into the heat shield that allowed the astronauts to internally access the laboratory located behind the spacecraft without the need for a spacewalk. While MOL astronauts would carry out a variety of experiments, a telescope with sophisticated imaging systems for military reconnaissance made up the primary payload in the laboratory. The imaging system, codenamed Dorian and carrying the Keyhole KH-10 designation, included a 72-inch diameter primary mirror designed to provide high resolution images of targets of military interest. To reach their polar orbits, MOLs would launch from Vandenberg Air Force (now Space Force) Base (AFB) in California. Construction of Space Launch Complex-6 (SLC-6) there began in March 1966 to accommodate the Titan-IIIM launch vehicle. The sensitive military nature of MOL resulted in its top-secret classification, not declassified by the NRO until October 2015.

Group 1 – Michael J. Adams, Albert H. Crews, John L. Finley, Richard E. Lawyer, Lachlan Macleay, Francis G. Neubeck, James M. Taylor, and Richard H. Truly Group 2 – Robert L. Crippen, Robert F. Overmyer, Karol J. Bobko, C. Gordon Fullerton, and Henry W. Hartsfield Group 3 – Robert T. Herres, Robert H. Lawrence, Donald H. Peterson, and James A. Abrahamson
The three selection groups of Manned Orbiting Laboratory pilots. Left:  Group 1 – Michael J. Adams, Albert H. Crews, John L. Finley, Richard E. Lawyer, Lachlan Macleay, Francis G. Neubeck, James M. Taylor, and Richard H. Truly. Middle: Group 2 – Robert L. Crippen, Robert F. Overmyer, Karol J. Bobko, C. Gordon Fullerton, and Henry W. Hartsfield. Right: Group 3 – Robert T. Herres, Robert H. Lawrence, Donald H. Peterson, and James A. Abrahamson. Image credits: Courtesy U.S. Air Force.

The USAF selected 17 pilots in three groups for the MOL program. The first group, selected on Nov. 12, 1965, consisted of eight pilots – Michael J. Adams, Albert H. Crews, John L. Finley, Richard E. Lawyer, Lachlan Macleay, Francis G. Neubeck, James M. Taylor, and Richard H. Truly. Adams retired from the MOL program in July 1966 to join the X-15 program. While making his seventh flight, he died in November 1967 when his aircraft crashed. Finley left the program in April 1968, returning to the U.S. Navy. The second group, selected on June 17, 1966, consisted of five pilots – Karol J. “Bo” Bobko, Robert L. Crippen, C. Gordon Fullerton, Henry W. Hartsfield, and Robert F. Overmyer. The third and final group of four pilots, chosen on June 30, 1967, comprised James A. Abrahamson, Robert T. Herres, Robert H. Lawrence, and Donald H. Peterson. Lawrence has the distinction as the first African American selected as an astronaut by any national space program. He died in the crash of an F-104 in December 1967.

Group photo of 14 of the 15 Manned Orbiting Laboratory pilots still in the program in early 1968
Group photo of 14 of the 15 Manned Orbiting Laboratory pilots still in the program in early 1968 – John L. Finley, front row left, Richard E. Lawyer, James M. Taylor, Albert H. Crews, Francis G. Neubeck, and Richard H. Truly; Robert T. Herres, back row left, James W. Hartsfield, Robert F. Overmyer, C. Gordon Fullerton, Robert L. Crippen, Donald H. Peterson, Karol J. Bobko, and James A. Abrahamson. Michael J. Adams had left the program and died in an X-15 crash, Robert H. Lawrence had died in a F-104 crash, and Lachlan Macleay does not appear for unknown reasons.

The only space launch in the MOL program occurred on Nov. 3, 1966, when a Titan-IIIC rocket took off from Cape Canaveral Air Force (now Space Force) Station’s Launch Complex 40. The rocket carried a MOL mockup, without the KH-10 imaging payload, and a Gemini-B capsule refurbished after it flew NASA’s uncrewed Gemini 2 suborbital mission in January 1965. This marked the only reflight of an American spacecraft intended for human spaceflight until the advent of the space shuttle. The flight successfully demonstrated the hatch in the heat shield design during the capsule’s reentry after a 33-minute suborbital flight. Sailors aboard the U.S.S. La Salle (LPD-3) recovered the Gemini-B capsule near Ascension Island in the South Atlantic Ocean and returned it to the Air Force for postflight inspection. Visitors can view it on display at the Cape Canaveral Space Force Museum. The MOL mockup entered Earth orbit and released three satellites. It also carried a suite of 10 experiments called Manifold, ranging from cell growth studies to tests of new technologies. Although the experiments could have operated for 75 days, the MOL stopped transmitting after 30 days, and decayed from orbit Jan. 9, 1967.

The only operational launch of the Manned Orbiting Laboratory (MOL) program, a Gemini-B capsule and a MOL mockup atop a Titan-IIIC rocket in 1966 The flown Gemini-B capsule on display at the Cape Canaveral Space Force Museum in Florida Former MOL and NASA astronaut Robert L. Crippen stands beside the only flown Gemini-B capsule – note the hatch in the heat shield at top
Left: The only operational launch of the Manned Orbiting Laboratory (MOL) program, a Gemini-B capsule and a MOL mockup atop a Titan-IIIC rocket in 1966. Middle: The flown Gemini-B capsule on display at the Cape Canaveral Space Force Museum in Florida. Right: Former MOL and NASA astronaut Robert L. Crippen stands beside the only flown Gemini-B capsule – note the hatch in the heat shield at top.

By 1969, the MOL program ran several years behind schedule and significantly over budget, and other than the one test flight had not flown any actual hardware. Although no flight hardware yet existed, aside from the long lead time mirrors for the imaging system, plans in May 1969 called for four 30-day MOL missions at 6-month intervals starting in January 1972. However, technology for uncrewed military reconnaissance had advanced to the stage that the KH-10 system proposed for MOL had reached obsolescence. Following a review, the new administration of President Richard M. Nixon, faced with competing priorities for the federal budget, announced the cancellation of the MOL program on June 10, 1969. 

Prototypes of elements of the Manned Orbiting Laboratory (MOL) under construction Medium fidelity mockup of the MOL crew cabin, with suited crew member and the narrow tunnel leading to the Gemini-B capsule Former MOL and NASA astronaut Robert L. Crippen stands next to the spacesuit developed for the MOL program
Left: Prototypes of elements of the Manned Orbiting Laboratory (MOL) under construction. Middle: Medium fidelity mockup of the MOL crew cabin, with suited crew member and the narrow tunnel leading to the Gemini-B capsule. Right: Former MOL and NASA astronaut Robert L. Crippen stands next to the spacesuit developed for the MOL program. Image credits: Courtesy National Reconnaissance Office.

Although the sudden cancellation came as a shock to those working on the program, some of the personnel involved as well as some of the hardware developed for it, made their way into other agencies and projects. For example, the Air Force had developed a flexible spacesuit required by the MOL pilots to navigate through the narrow tunnel between the Gemini-B capsule and the laboratory – that technology transferred to NASA for future spacesuit development. The waste management system designed for use by MOL pilots flew aboard Skylab. The MOL laboratory simulator and the special computer to operate it also transferred to NASA. The technology developed for the acquisition and tracking system and the mission development simulator for the KH-10 imaging system found its way into NASA’s earth remote sensing program.

Official NASA photograph of the Group 7 astronauts – Karol J. Bobko, left, C. Gordon Fullerton, Henry W. Hartsfield, Robert L. Crippen, Donald H. Peterson, Richard H. Truly, and Robert F. Overmyer – transfers from the Manned Orbiting Laboratory program
Official NASA photograph of the Group 7 astronauts – Karol J. Bobko, left, C. Gordon Fullerton, Henry W. Hartsfield, Robert L. Crippen, Donald H. Peterson, Richard H. Truly, and Robert F. Overmyer – transfers from the Manned Orbiting Laboratory program.

After the cancellation of the MOL program, NASA invited the younger (under 35) MOL pilots to join its astronaut corps. Bobko, Crippen, Fullerton, Hartsfield, Overmyer, Peterson, and Truly transferred to NASA on August 14, 1969, as the Group 7 astronaut class. In 1972, Crippen and Bobko participated in the 56-day ground-based Skylab Medical Experiment Altitude Test, a key activity that contributed to Skylab’s success. Although it took nearly 12 years for the first of the MOL transfers to make it to orbit, all of them went on to fly on the space shuttle in the 1980s, six of them as commanders. In an ironic twist, NASA assigned Crippen to command the first space shuttle polar orbiting mission (STS-62A) that would have launched from the SLC-6 pad at Vandenberg in 1986. But after the January 1986 Challenger accident, the Air Force reduced its reliance on the shuttle as a launch platform and cancelled the mission. Truly served as NASA administrator from 1989 to 1992 and Crippen as the director of NASA’s Kennedy Space Center in Florida from 1992 to 1995. NASA hired Crews, not as an astronaut but as a pilot, and he stayed with the agency until 1994. Of the MOL astronauts that did not meet NASA’s age limit requirement, many went on to have stellar careers. Abrahamson joined NASA in 1981 as associate administrator for manned space flight, then went on to lead the Strategic Defense Initiative from 1984 to 1989. Herres served as vice chairman of the Joint Chiefs of Staff from 1987 to 1990.

Space shuttle Enterprise during fit checks at the SLC-6 launch facility at Vandenberg Air Force (now Space Force) Base in 1985 Athena rocket awaits launch on SLC-6 in 1997 Delta-IV Heavy lifts off from SLC-6 in 2011
Left: Space shuttle Enterprise during fit checks at the SLC-6 launch facility at Vandenberg Air Force (now Space Force) Base in 1985. Middle: Athena rocket awaits launch on SLC-6 in 1997. Right: Delta-IV Heavy lifts off from SLC-6 in 2011.

Following cancellation of the MOL program, the Air Force mothballed the nearly completed SLC-6 at Vandenberg. In 1972, the Air Force and NASA began looking at SLC-6 as a pad to launch space shuttles with payloads requiring polar orbits, with the decision made in 1975. Workers began converting SLC-6 to launch the space shuttle in 1979. Although space shuttle Enterprise used SLC-6 for fit checks in 1985, the Challenger accident the following year caused the Air Force to cancel plans to use the space shuttle to launch polar orbiting satellites, and they once again mothballed the pad. Following modifications, small Athena rockets used the pad between 1995 and 1999, the first launches from the facility after 30 years of development and modifications. Another conversion begun in 1999 modified SLC-6 to launch Delta-IV and Delta-IV Heavy rockets starting in 2006, with the last flight in 2022. SpaceX leased SLC-6 in April 2023 to begin launches of Falcon 9 and Falcon Heavy rockets in 2025.

Schematic of the optical system of the Manned Orbiting Laboratory (MOL), including the 72-inch primary mirror at right The Multiple Mirror Telescope Observatory on Mount Hopkins, Arizona, in its original six-mirror configuration using mirrors from the MOL Program
Left: Schematic of the optical system of the Manned Orbiting Laboratory (MOL), including the 72-inch primary mirror at right. Image credit: courtesy: NRO. Right: The Multiple Mirror Telescope Observatory on Mount Hopkins, Arizona, in its original six-mirror configuration using mirrors from the MOL Program. Image credit: Courtesy Multiple Mirror Telescope.

The NRO transferred six surplus 72-inch mirrors from the cancelled KH-10 program to the Smithsonian Astrophysical Observatory for the Multiple-Mirror Telescope (MMT) it built in association with the University of Arizona, located on Mount Hopkins, Arizona. By combining the light of the six mirrors, they achieved an effective light collecting area of a single 177-inch telescope mirror. The MMT operated in this six-mirror configuration for nearly 20 years before a single 215-inch mirror replaced them.

Read Abrahamson’s, Bobko’s, Crew’s, Crippen’s, Fullerton’s, Hartsfield’s, Peterson’s, and Truly’s recollections of the MOL program in their oral history interviews with the JSC History Office. In 2019, the NRO held a panel discussion with MOL pilots Abrahamson, Bobko, Macleay, Crews, and Crippen, by then free to talk about their experiences during the now declassified program.

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      On March 24, 1975, the last in a long line of super successful Saturn rockets rolled out from the vehicle assembly building to Launch Pad 39B at NASA’s Kennedy Space Center in Florida. The Saturn IB rocket for the Apollo-Soyuz Test Project was the 19th in the Saturn class stacked in the assembly building, beginning in 1966 with the Saturn V 500F facilities checkout vehicle. Thirteen flight Saturn V rockets followed, 12 to launch Apollo spacecraft and one to place the Skylab space station into orbit. In addition, workers stacked four flight Saturn IB rockets, three to launch crews to Skylab and one for Apollo-Soyuz, plus another for the Skylab rescue vehicle that was not needed and never launched. Previously, workers stacked Saturn I and Saturn IB rockets on the pads at Launch Complexes 34 and 37. With the successful liftoff in July 1975, the Saturn family of rockets racked up a 100 percent success rate of 32 launches. 

      Workers lower the Apollo command and service modules onto the spacecraft adaptor.NASA Technicians in the assembly building replace the fins on the Saturn IB rocket’s first stage. NASA Workers in the assembly building prepare to lower the spacecraft onto its Saturn IB rocket.NASA Inspections of the Saturn IB rocket’s first stage fins revealed hairline cracks in several hold-down fittings and managers ordered the replacement of all eight fins. While the cracks would not affect the flight of the rocket they bore the weight of the rocket on the mobile launcher. Workers finished the fin replacement on March 16. Engineers in Kennedy’s spacecraft operations building prepared the Apollo spacecraft for its historic space mission. By early March, they had completed checkout and assembly of the spacecraft and transported it to the assembly building on March 17 to mount it atop the Saturn IB’s second stage. Five days later, they topped off the rocket with the launch escape system. 

      The final Saturn IB begins its rollout from the vehicle assembly building. NASA The Saturn IB passes by the Launch Control Center. NASA Apollo astronauts Thomas Stafford, left, Vance Brand, and Donald “Deke” Slayton pose in front of their Saturn IB during the rollout.NASA On March 23, workers edged the mobile transporter carrying the Saturn IB just outside the assembly building’s High Bay 1, where engineers installed an 80-foot tall lightning mast atop the launch tower. The next morning, the stack continued its rollout to Launch Pad 39B with the prime crew of Thomas  Stafford, Vance Brand, and Donald “Deke” Slayton and support crew members Robert Crippen and Richard Truly on hand to observe. About 7,500 people, including guests, dependents of Kennedy employees and NASA Tours patrons, watched as the stack moved slowly out of the assembly building on its five-mile journey to the launch pad.   

      Mission Control in Houston during the joint simulation with Flight Director Donald Puddy in striped shirt and a view of Mission Control in Moscow on the large screen at left. NASA A group of Soviet flight controllers in a support room in Mission Control in Houston during the joint simulation. NASA On March 20, flight controllers and crews began a series of joint simulations for the joint mission scheduled for July 1975. For the six days of simulations, cosmonauts Aleksei Leonov and Valeri Kubasov and astronauts Stafford, Brand, and Slayton participated in the activity in spacecraft simulators in their respective countries, with both control centers in Houston and outside Moscow fully staffed as if for the actual mission. The exercises simulated various phases of the mission, including the respective launches, rendezvous and docking, crew transfers and joint operations, and undocking. 

      Astronauts Thomas Stafford, left, Vance Brand, and Donald “Deke” Slayton in a boilerplate Apollo command module preparing for the water egress training. NASA Stafford, left, Slayton, and Brand in the life raft during water egress training. NASA Astronauts Stafford, Brand and Slayton participated in a water egress training activity on March 8,  completing the exercise in a water tank in Building 260 at NASA’s Johnson Space Center in Houston. The astronauts practiced egressing from their spacecraft onto a lift raft and being lifted up with the use of a Billy Pugh rescue net. They practiced wearing their flight coveralls as well as their spacesuits. 

      Explore More
      5 min read 50 Years Ago: Preparing the Final Saturn Rocket for Flight
      Article 2 months ago 6 min read 45 Years Ago: Soyuz and Apollo Launch
      Article 5 years ago 8 min read 45 Years Ago: Historic Handshake in Space
      Article 5 years ago View the full article
    • By NASA
      On March 23, 1965, the United States launched the Gemini III spacecraft with astronauts Virgil “Gus” Grissom and John Young aboard, America’s first two-person spaceflight. Grissom earned the honor as the first person to enter space twice and Young as the first member of the second group of astronauts to fly in space. During their three-orbit flight they carried out the first orbital maneuvers of a crewed spacecraft, a critical step toward demonstrating rendezvous and docking. Grissom and Young brought Gemini 3 to a safe splashdown in the Atlantic Ocean. Their ground-breaking mission led the way to nine more successful Gemini missions in less than two years to demonstrate the techniques required for a Moon landing. Gemini 3 marked the last spaceflight controlled from Cape Kennedy, that function shifting permanently to a new facility in Houston. 

      In one of the first uses of the auditorium at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, managers announce the prime and backup Gemini III crews. NASA NASA astronauts Virgil “Gus” Grissom and John Young, the Gemini III prime crew. NASA Grissom, foreground, and Young in their capsule prior to launch.NASA On April 13, 1964, just five days after the uncrewed Gemini I mission, in the newly open auditorium at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, Director Robert Gilruth introduced the Gemini III crew to the press. NASA assigned Mercury 4 veteran Grissom and Group 2 astronaut Young as the prime crew, with Mercury 8 veteran Walter Schirra and Group 2 astronaut Thomas Stafford serving as their backups. The primary goals of Project Gemini included proving the techniques required for the Apollo Program to fulfil President John F. Kennedy’s goal of landing a man on the Moon and returning him safely to Earth before the end of the 1960s. Demonstrating rendezvous and docking between two spacecraft ranked as a high priority for Project Gemini.  

      Liftoff of Gemini III.NASA The uncrewed Gemini I and II missions validated the spacecraft’s design, reliability, and heat shield, clearing the way to launch Gemini III with a crew. On March 23, 1965, after donning their new Gemini spacesuits, Grissom and Young rode the transfer van to Launch Pad 19 at Cape Kennedy in Florida. They rode the elevator to their Gemini spacecraft atop its Titan II rocket where technicians assisted them in climbing into the capsule. At 9:24 a.m. EST, the Titan’s first stage engines ignited, and Gemini III rose from the launch pad. 

      The Mission Control Center at Cape Kennedy in Florida during Gemini III, controlling a human spaceflight for the final time.NASA The Mission Control Center at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, monitoring the Gemini III mission.NASA Five and a half minutes after launch, the Titan II’s second stage engine cut off and the spacecraft separated to begin its orbital journey. Grissom became the first human to enter space a second time. While engineers monitored the countdown from the Launch Pad 19 blockhouse, once in orbit flight controllers in the Mission Control Center at the Cape took over. Controllers in the new Mission Control Center at the Manned Spacecraft Center, now the Johnson Space Center in Houston, staffed consoles and monitored the mission in a backup capacity. Beginning with Gemini IV, control of all American human spaceflights shifted permanently to the Houston facility. 
      Gemini III entered an orbit of 100 miles by 139 miles above the Earth. Near the end of the first orbit, while passing over Texas, Grissom and Young fired their spacecraft’s thrusters for one minute, 14 seconds. “They appear to be firing good,” said Young, confirming the success of the maneuver. The change in velocity adjusted their orbit to 97 miles by 105 miles. A second burn 45 minutes later altered the orbital inclination by 0.02 degrees. Another task for the crew involved testing new food and packaging developed for Gemini. As an off-the-menu item, Young had stowed a corned beef on rye sandwich in his suit pocket before flight, and both he and Grissom took a bite before stowing it away, concerned about crumbs from the sandwich floating free in the cabin.
      Shortly after splashdown, Gemini III astronaut Virgil “Gus” Grissom exits the spacecraft as crewmate John Young waits in the life raft. NASA Sailors hoist the Gemini III spacecraft aboard the prime recovery ship U.S.S. Intrepid.NASA Young, left, and Grissom stand with their spacecraft aboard Intrepid. NASA Near the end of their third revolution, Grissom and Young prepared for the retrofire burn to bring them out of orbit. They oriented Gemini III with its blunt end facing forward and completed a final orbital maneuver to lower the low point of their orbit to 45 miles, ensuring reentry even if the retrorockets failed to fire. They jettisoned the rearmost adapter section, exposing the retrorockets that fired successfully, bringing the spacecraft out of orbit. They jettisoned the retrograde section, exposing Gemini’s heat shield. Minutes later, they encountered the upper layers of Earth’s atmosphere at 400,000 feet, and he buildup of ionized gases caused a temporary loss of communication between the spacecraft and Mission Control. At 50,000 feet, Grissom deployed the drogue parachute to stabilize and slow the spacecraft, followed by the main parachute at 10,600 feet. Splashdown occurred in the Atlantic Ocean near Grand Turk Island, about 52 miles short of the planned point, after a flight of 4 hours, 52 minutes, 31 seconds. 
      Gemini III astronauts Virgil “Gus” Grissom, left, and John Young upon their return to Cape Kennedy in Florida. NASA Grissom and Young at the postflight press conference. NASA The welcome home ceremony for Grissom and Young at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston.NASA A helicopter recovered Grissom and Young and delivered them to the deck of the U.S.S. Intrepid, arriving there one hour and 12 minutes after splashdown. On board the carrier, the astronauts received a medical checkup and a telephone call from President Lyndon B. Johnson. The ship sailed to pick up the spacecraft and sailors hoisted it aboard less than three hours after landing. The day after splashdown, Grissom and Young flew to Cape Kennedy for debriefings, a continuation of the medical examinations begun on the carrier, and a press conference. Following visits to the White House, New York, and Chicago, the astronauts returned home to Houston on March 31. The next day, Gilruth welcomed them back to the Manned Spacecraft Center, where in front of the main administration building, workers raised an American flag that Grissom and Young had carried on their mission. That flag flew during every subsequent Gemini mission. 

      During the Gemini III welcome home ceremony in front of the main administration building at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, workers raise an American flag that the astronauts had carried on their mission. NASA
      Explore More
      5 min read 60 Years Ago: Gemini 1 Flies a Successful Uncrewed Test Flight
      Article 12 months ago 6 min read 60 Years Ago: Uncrewed Gemini 2 Paves the Way for the First Crewed Mission
      Article 2 months ago 6 min read Artemis I Mission Control at a Glance
      Article 3 years ago View the full article
    • By NASA
      Explore This Section Earth Home Earth Observer Home Editor’s Corner Feature Articles Meeting Summaries News Science in the News Calendars In Memoriam More Archives 5 min read
      Celebrating 25 Years of Terra
      Expanded coverage of topics from “The Editor’s Corner” in The Earth Observer
      Terra anniversary banner Image credit: NASA Nasa personnel gather to celebrate Terra’s 25th anniversary at the Goddard Visitor Center. Image credit: NASA On December 18, 2024, Terra—the first EOS Flagship mission celebrated the 25th anniversary of its launch from Vandenberg Space Force (then Air Force) Base. Some 70 individuals gathered at the Goddard Space Flight Center’s (GSFC) Visitor Center to celebrate this remarkable achievement for the venerable mission – with 75 more participating virtually. 
      The gathering began with a reception culminating with some informal remarks in the main area of the Visitor’s Center outside the auditorium from Marc Dinardo [Lockheed Martin, emeritus] who was involved in the design of Terra. He explained that – at the time it was being built in the 1990s – Terra represented a “big step forward” for Lockheed Martin compared to projects the company had done prior to this. He discussed several engineering feats, e.g., fitting spacecraft components into the Atlas rocket used to launch Terra, moving from tape recorders to solid state recorders for data storage, the (at the time) novel thermal system developed to reject heat and protect instruments, and the direct broadcast capabilities.
      After the initial remarks, the in-person participants moved into the auditorium where they heard from representatives from Senior management [both from NASA Headquarters and GSFC] as well as from several key figures in Terra’s long history. Each speaker gave brief remarks and shared their perspectives on Terra’s development and achievements. Short summaries of each presentation follow below.
      Julie Robinson [NASA HQ—Deputy Director of the Earth Science Division] began by noting that this feels like a family celebration.  She said her first  personal experience with Terra was submitting a proposal as a young scientist to do research that would use data from Terra. At that time the idea of studying Earth as a system of systems was brand new.  She had no idea at that time that more than a quarter-century later, she’d be involved  in planning the “next generation” Earth System Observatory (ESO). 
      Shawn Domagal-Goldman [Deputy Director of the Sciences and Exploration Directorate] spoke about how some of the biggest science questions we try to answer are interdisciplinary and cross-instrument, spanning missions and generations, and that the expertise and diverse skillsets of those who have worked on the Terra team over the past 25 years embodies this goal.
      Tom Neumann [GSFC—Deputy Director of Earth Science Division (GSFC)] reflected on his early involvement in the Terra–Aqua–Aura proposal reviews. He noted the sheer number of people involved in the mission and the logistical challenges that organizing that size group presented at the time.  He also commented on the feeling of family surrounding the Team and how this surely contributed to its remarkable achievements over the past 25 years.
      Guennadi Kroupnik [Canadian Space Agency—Director General of Space Utilization] extended congratulations to NASA and Terra team for 25 years of operations. He commented that this “six year” mission has endured far beyond what was planned. Canada’s contribution was the Measurement of Pollution in the Troposphere (MOPITT) instrument with Jim Drummond [University of Toronto] as Principal Investigator. Kroupnik noted that MOPITT Is longest continuously running instrument in Canadian history. He is pleased that CSA has been able to partner with NASA on Terra and looks forward to future collaboration on the Atmospheric Observing System (AOS), which is one of the missions planned as part of ESO.
      Jack Kaye [NASA Headquarters—Associate Director for Research of the Earth Science Division] spoke of Terra’s remarkable scientific accomplishments, the creativity of the team, and the intentional emphasis placed on validating the data, and the creativity of the Team. He also noted that the direct broadcast capability was extremely useful and led to many applications. Kaye remarked that the late Yoram Kauffman referred to the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) as the “zoom lens of Terra.”
      Miguel Román [GSFC—Deputy Director for Atmospheres] described himself as a “child of Terra,” as he began his science career at around the same time that Terra launched and has been involved in various capacities ever since. Román recalled the launch taking place near vineyards, where the team celebrated the successful launch with local wine, to finally sharing a bottle of wine with the late Piers Sellers (who served as the first Terra project scientist) at one of the final gatherings Piers threw before he passed from cancer. Román also mentioned the Our Changing Planet book that four Earth Scientists – including former EOS Senior Project Scientist and Moderate Resolution Imaging Spectroradiometer (MODIS) Science Team Leader Michael King and former Aqua Project Scientist Claire Parkinson—both GSFC emeritus – collaborated to write that was published in 2007. This book made use of numerous images and data from Terra’s five instruments – as well as other EOS data.
      Kurt Thome [GSFC—Terra Project Scientist] rounded out the presentations, emphasizing again what several have stated in their individual comments – the Terra Team truly is a family. He commented that he’s only been leading the mission for the past ten years and that his work builds on the shoulders of those who came before him. In particular, he acknowledged the slide Miguel Román showed briefly during his presentation that honored those who were part of the Terra family who have passed away – e.g., Piers Sellers, Yoram Kauffman. 
      Steve Platnick
      EOS Senior Project Scientist
      Share








      Details
      Last Updated Mar 20, 2025 Related Terms
      Earth Science View the full article
    • By NASA
      On March 6, 1985, NASA’s newest space shuttle, Atlantis, made its public debut during a rollout ceremony at the Rockwell International manufacturing plant in Palmdale, California. Under construction for three years, Atlantis joined NASA’s other three space-worthy orbiters, Columbia, Challenger, and Discovery, and atmospheric test vehicle Enterprise. Officials from NASA, Rockwell, and other organizations attended the rollout ceremony. By the time NASA retired Atlantis in 2011, it had flown 33 missions in a career spanning 26 years and flying many types of missions envisioned for the space shuttle. The Visitor Center at NASA’s Kennedy Space Center in Florida has Atlantis on display. 

      Space shuttle Atlantis under construction at Rockwell International’s Palmdale, California, plant in 1984. Credit/NASA. Atlantis during the rollout ceremony in Palmdale. Credit/NASA. Workers truck Atlantis from Palmdale to NASA’s Dryden, now Armstrong, Flight Research Center. Credit/NASA. On Jan. 25, 1979, NASA announced the names of the first four space-worthy orbiters – Columbia, Challenger, Discovery, and Atlantis. Like the other vehicles, NASA named Atlantis after an historical vessel of discovery and exploration – the Woods Hole Oceanographic Institute’s two-masted research ship Atlantis that operated from 1930 to 1966. On Jan. 29, NASA signed the contract with Rockwell International of Downey, California, to build and deliver Atlantis. Construction began in March 1980 and finished in April 1984. Nearly identical to Discovery but with the addition of hardware to support the cryogenic Centaur upper stage then planned to deploy planetary spacecraft in 1986, plans shelved following the Challenger accident. After a year of testing, workers prepared Atlantis for its public debut. 

      Atlantis arrives at NASA’s Dryden, now Armstrong, Flight Research Center to prepare for its cross-country ferry flight. Credit/NASA. Atlantis during an overnight stop at Ellington Air Force Base, now Ellington Field, in Houston. Credit/NASA. Atlantis arrives at NASA’s Kennedy Space Center in Florida.Credit/NASA. Three days after the rollout ceremony, workers trucked Atlantis 36 miles overland to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base in California’s Mojave Desert, for final preparations for its cross-country ferry flight. In the Mate Demate Device, workers placed Atlantis atop the Shuttle Carrier Aircraft, a modified Boeing 747, to begin the ferry flight. The duo left Edwards on April 12, the fourth anniversary of the first space shuttle flight. Following an overnight stop at Houston’s Ellington Air Force Base, now Ellington Field, Atlantis arrived at NASA’s Kennedy Space Center in Florida on April 13. 

      Atlantis following its first rollout to Launch Pad 39A. Credit/NASA. The flight readiness firing of Atlantis’ three main engines.Credit/NASA. Liftoff of Atlantis on its first mission, STS-51J. Credit/NASA. Four months later, on Aug. 12, workers towed Atlantis from the processing facility to the assembly building and mated it to an external tank and twin solid rocket boosters. The entire stack rolled out to Launch Pad 39A on Aug. 30 in preparation for the planned Oct. 3 launch of the STS-51J mission. As with any new orbiter, on Sept. 13 NASA conducted a 20-second Flight Readiness Firing of Atlantis’ three main engines. On Sept. 16, the five-person crew participated in a countdown demonstration test, leading to an on time Oct. 3 launch. Atlantis had joined the shuttle fleet and begun its first mission to space. 

      Space shuttle Atlantis in the Visitor Center at NASA’s Kennedy Space Center in Florida. Credit/NASA. Over the course of its 33 missions spanning more than 26 years, Atlantis flew virtually every type of mission envisioned for the space shuttle, including government and commercial satellite deployments, deploying spacecraft to visit interplanetary destinations, supporting scientific missions, launching and servicing scientific observatories such as the Hubble Space Telescope, performing crew rotations and resupplying the Mir space station, and assembling and maintaining the International Space Station. Atlantis flew the final mission of the shuttle program, STS-135,  in July 2011. The following year, NASA transported Atlantis to the Kennedy Visitor Center for public display.  

      Explore More
      7 min read 40 Years Ago: Space Shuttle Discovery Makes its Public Debut
      Article 1 year ago 14 min read 40 Years Ago: STS-4, Columbia’s Final Orbital Flight Test
      Article 3 years ago 6 min read 45 Years Ago: Space Shuttle Enterprise Makes its Public Debut
      Article 3 years ago View the full article
    • By NASA
      Rotor Optimization for the Advancement of Mars eXploration (ROAMX) team members and test stand at NASA Ames Research Center.NASA During 2024-2025, helicopter blades optimized for Mars were tested in the Planetary Aeolian Laboratory (PAL) at NASA Ames Research Center as part of the Rotor Optimization for the Advancement of Mars eXploration (ROAMX) project.  The experimental test-chamber of the PAL can be depressurized to create atmospheric air pressures of different planetary bodies such as Mars. The full-scale ROAMX blades were spun in hover configuration up to 4000 RPM at an atmospheric density of Mars (approximately 0.015 kilograms per cubic meter).  The Ingenuity blades were also tested in the PAL to compare the performance of the optimized blades against the Ingenuity Mars Helicopter Technology Demonstrator. The test was conducted to validate computational models of the performance of the optimized blades. Simulations show that the optimized ROAMX blades perform significantly better than the Ingenuity blades, allowing helicopters on Mars to fly farther, faster, and carry a science payload. The next phase of testing will occur with higher RPMs and additional collective angles.
      Rotor Optimization for the Advancement of Mars eXploration (ROAMX) hover test stand with ROAMX blades installed in the Planetary Aeolian Laboratory (PAL) low-pressure chamber at NASA Ames Research Center.NASAView the full article
  • Check out these Videos

×
×
  • Create New...