Jump to content

NASA’s Network of Small Moon-Bound Rovers Is Ready to Roll


Recommended Posts

  • Publishers
Posted

5 min read

Preparations for Next Moonwalk Simulations Underway (and Underwater)

Construction and testing are complete on the CADRE rovers, which will map the lunar surface together as a tech demo to show the promise of multirobot missions.

A trio of small rovers that will explore the Moon in sync with one another are rolling toward launch. Engineers at NASA’s Jet Propulsion Laboratory in Southern California recently finished assembling the robots, then subjected them to a punishing series of tests to ensure they’ll survive their jarring rocket ride into space and their travels in the unforgiving lunar environment.

Part of a technology demonstration called CADRE (Cooperative Autonomous Distributed Robotic Exploration), each solar-powered rover is about the size of a carry-on suitcase. The rovers and associated hardware will be installed on a lander headed for the Moon’s Reiner Gamma region. They’ll spend the daylight hours of a lunar day – the equivalent of about 14 days on Earth – conducting experiments by autonomously exploring, mapping, and using ground-penetrating radar that will peer below the Moon’s surface.

The goal is to show that a group of robotic spacecraft can work together to accomplish tasks and record data as a team without explicit commands from mission controllers on Earth. If the project succeeds, future missions could include teams of robots spreading out to take simultaneous, distributed scientific measurements, potentially in support of astronauts.

Engineers have put in long hours test-driving rovers and working out bugs to finish the hardware, get it through testing, and prepare it for integration with the lander.

Clamped to a shaker table, one of NASA’s CADRE rovers gets shaken vigorously during a test in November 2023. This vibration test is designed to show that the rover can withstand the jarring rocket ride on its journey to the Moon aboard a lunar lander.

“We have been in overdrive getting this tech demo ready for its lunar adventure,” said Subha Comandur, CADRE project manager at JPL. “It’s been months of nearly round-the-clock testing and sometimes re-testing, but the team’s hard work is paying off. Now we know these rovers are ready to show what a team of little space robots can accomplish together.”

Shake and Bake

While the list of tests is extensive, the most brutal involve extreme environmental conditions to ensure the rovers can withstand the rigors of the road ahead. That includes being locked in a thermal vacuum chamber that simulates the airless conditions of space and its extreme hot and cold temperatures. The hardware also gets clamped to a special “shaker table” that vibrates intensely to make sure it will endure the journey out of Earth’s atmosphere.

A CADRE rover is prepared for electromagnetic interference
A CADRE rover is prepared for electromagnetic interference and compatibility testing in a special chamber at JPL in November 2023. Such testing confirms that the operation of the electronic subsystems do not interfere with each other nor with those on the lander.
NASA/JPL-Caltech

“This is what we submit our rovers to: ‘shake’ to simulate the rocket launch itself and ‘bake’ to simulate the extreme temperatures of space. It’s very nerve-wracking to witness in person,” said JPL’s Guy Zohar, the project’s flight system manager. “We’re using many carefully selected commercial parts on our project. We expect them to work, but we’re always a little worried when we go into testing. Happily, each test has ultimately been successful.”

Engineers also performed environmental testing on three hardware elements mounted on the lander: a base station that the rovers will communicate with via mesh network radios, a camera that will provide a view of the rovers’ activities, and the deployer systems that will lower the rovers to the lunar surface via a fiber tether fed slowly out from a motorized spool.

Putting Code to the Test, Too

Meanwhile, engineers working on CADRE’s cooperative autonomy software have spent many days in JPL’s rocky, sandy Mars Yard with full-scale versions of the rovers called development models. With flight software and autonomy capabilities aboard, these test rovers showed they can accomplish key goals for the project. They drove together in formation. Faced with unexpected obstacles, they adjusted their plans as a group by sharing updated maps and replanning coordinated paths. And when one rover’s battery charge was low, the whole team paused so they could later continue together.

Two full-scale development model rovers
Two full-scale development model rovers are tested in JPL’s Mars Yard in August 2023 as part of NASA’s CADRE tech demo. These tests confirmed the project’s hardware and software can work together to accomplish key goals.
NASA/JPL-Caltech

The project conducted several drives at night under large flood lamps so the rovers could experience extreme shadows and lighting that approximate what they’ll encounter during the lunar daytime.

After that, the team performed similar drive tests with flight models (the rovers that will go to the Moon) in a JPL clean room. When the spotless floor there proved a bit slippery – a texture different from the lunar surface – the robots got out of formation. But they stopped, adjusted, and proceeded on their planned path.

“Dealing with curveballs – that’s important for the autonomy. The key is the robots respond to things going off plan, then they replan and are still successful,” said JPL’s Jean-Pierre de la Croix, CADRE principal investigator and autonomy lead. “We’re going to a unique environment on the Moon, and there will, of course, be some unknowns. We’ve done our best to prepare for those by testing software and hardware together in various situations.”

Next, the hardware will ship to Intuitive Machines for installation on a Nova-C lander that will launch atop a SpaceX Falcon 9 rocket from NASA’s Kennedy Space Center in Florida.

More About the Project

A division of Caltech in Pasadena, California, JPL manages the CADRE technology demonstration project for the Game Changing Development program within NASA’s Space Technology Mission Directorate in Washington. CADRE is a payload under NASA’s CLPS (Commercial Lunar Payload Services) initiative, which is managed by the agency’s Science Mission Directorate. The agency’s Glenn Research Center in Cleveland and its Ames Research Center in Silicon Valley, California, both supported the project. Motiv Space Systems designed and built key hardware elements at the company’s Pasadena facility. Clemson University in South Carolina contributed research in support of the project.

For more about CADRE, go to:

https://go.nasa.gov/cadre

News Media Contact

Melissa Pamer
Jet Propulsion Laboratory, Pasadena, Calif.
626-314-4928
melissa.pamer@jpl.nasa.gov

2024-022

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      Credit: NASA NASA’s Office of Small Business Programs will host the U.S. Small Business Administration (SBA) for the first time at its monthly webinar for small businesses at 1 p.m. EDT Wednesday, April 16.
      The webinar, currently open for registration, will focus on a new SBA manufacturing initiative and provide information about SBA’s flagship 7(a) loan program in addition to small business program updates from NASA.
      Participants in the webinar include:
      Casey Swails, deputy associate administrator, NASA Dwight Deneal, assistant administrator, Office of Small Business Programs (OSBP), NASA Headquarters in Washington Charles Williams, program manager, NASA OSBP SBA Administrator Kelly Loeffler Dianna Seaborn, deputy associate administrator, Office of Capital Access, SBA The NASA OSBP Learning Series is a collection of webinars that provide small businesses with an opportunity to receive training and ask questions to experts at the agency. Upcoming webinars are listed on OSBP website. Previous webinars the office has hosted can be found on the OSBP Learning Series Archives.
      For more information about NASA OSBP’s learning series and other outreach events, visit:
      https://www.nasa.gov/osbp
      -end-
      Share
      Details
      Last Updated Apr 14, 2025 LocationNASA Headquarters Related Terms
      General NASA Headquarters Office of Small Business Programs (OSBP) View the full article
    • By NASA
      NASA Deep Space Station 43 (DSS-43), a 230-foot-wide (70-meter-wide) radio antenna at NASA’s Deep Space Network facility in Canberra, Australia, is seen in this March 4, 2020, image. DSS-43 was more than six times as sensitive as the original antenna at the Canberra complex, so it could communicate with spacecraft at greater distances from Earth. In fact, Canberra is the only complex that can send commands to, and receive data from, Voyager 2 as it heads south almost 13 billion miles (21 billion kilometers) through interstellar space. More than 15 billion miles (24 billion kilometers) away, Voyager 1 sends its data down to the Madrid and Goldstone complexes, but it, too, can only receive commands via Canberra.
      As the Canberra facility celebrated its 60th anniversary on March 19, 2025, work began on a new radio antenna. Canberra’s newest addition, Deep Space Station 33, will be a 112-foot-wide (34-meter-wide) multifrequency beam-waveguide antenna. Buried mostly below ground, a massive concrete pedestal will house cutting-edge electronics and receivers in a climate-controlled room and provide a sturdy base for the reflector dish, which will rotate during operations on a steel platform called an alidade.
      When it goes online in 2029, the new Canberra dish will be the last of six parabolic dishes constructed under NASA’s Deep Space Network Aperture Enhancement Program, which is helping to support current and future spacecraft and the increased volume of data they provide. The network’s Madrid facility christened a new dish in 2022, and the Goldstone, California, facility is putting the finishing touches on a new antenna.
      Image credit: NASA
      View the full article
    • By NASA
      4 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      The radio antennas of NASA’s Canberra Deep Space Communications Complex are lo-cated near the Australian capital. It’s one of three Deep Space Network facilities around the world that keep the agency in contact with dozens of space missions Located at Tidbinbilla Nature Reserve near the Australian capital city, the Canberra complex joined the Deep Space Network on March 19, 1965, with one 85-foot-wide (26-meter-wide) radio antenna. The dish, called Deep Space Station 42, was decommis-sioned in 2000. This photograph shows the facility in 1965.NASA Canberra joined the global network in 1965 and operates four radio antennas. Now, preparations have begun on its fifth as NASA works to increase the network’s capacity.
      NASA’s Deep Space Network facility in Canberra, Australia celebrated its 60th anniversary on March 19 while also breaking ground on a new radio antenna. The pair of achievements are major milestones for the network, which communicates with spacecraft all over the solar system using giant dish antennas located at three complexes around the globe.
      Canberra’s newest addition, Deep Space Station 33, will be a 112-foot-wide (34-meter-wide) multifrequency beam-waveguide antenna. Buried mostly below ground, a massive concrete pedestal will house cutting-edge electronics and receivers in a climate-controlled room and provide a sturdy base for the reflector dish, which will rotate during operations on a steel platform called an alidade.
      Suzanne Dodd, the director for the Interplanetary Network Directorate at JPL, addresses an audience at the Deep Space Network’s Canberra complex on March 19, 2025. That day marked 60 years since the Australian facility joined the network.NASA “As we look back on 60 years of incredible accomplishments at Canberra, the groundbreaking of a new antenna is a symbol for the next 60 years of scientific discovery,” said Kevin Coggins, deputy associate administrator of NASA’s SCaN (Space Communications and Navigation) Program at NASA Headquarters in Washington. “Building cutting-edge antennas is also a symbol of how the Deep Space Network embraces new technologies to enable the exploration of a growing fleet of space missions.”
      When it goes online in 2029, the new Canberra dish will be the last of six parabolic dishes constructed under NASA’s Deep Space Network Aperture Enhancement Program, which is helping to support current and future spacecraft and the increased volume of data they provide. The network’s Madrid facility christened a new dish in 2022, and the Goldstone, California, facility is putting the finishing touches on a new antenna. 
      Canberra’s Role
      The Deep Space Network was officially founded on Dec. 24, 1963, when NASA’s early ground stations, including Goldstone, were connected to the new network control center at the agency’s Jet Propulsion Laboratory in Southern California. Called the Space Flight Operations Facility, that building remains the center through which data from the three global complexes flows.
      The Madrid facility joined in 1964, and Canberra went online in 1965, going on to help support hundreds of missions, including the Apollo Moon landings.
      Three eye-catching posters featuring the larger 230-foot (70-meter) antennas located at the three Deep Space Network complexes around the world.NASA/JPL-Caltech “Canberra has played a crucial part in tracking, communicating, and collecting data from some of the most momentous missions in space history,” said Kevin Ferguson, director of the Canberra Deep Space Communication Complex. “As the network continues to advance and grow, Canberra will continue to play a key role in supporting humanity’s exploration of the cosmos.”
      By being spaced equidistant from one another around the globe, the complexes can provide continual coverage of spacecraft, no matter where they are in the solar system as Earth rotates. There is an exception, however: Due to Canberra’s location in the Southern Hemisphere, it is the only one that can send commands to, and receive data from, Voyager 2 as it heads south almost 13 billion miles (21 billion kilometers) through interstellar space. More than 15 billion miles (24 billion kilometers) away, Voyager 1 sends its data down to the Madrid and Goldstone complexes, but it, too, can only receive commands via Canberra.
      New Technologies
      In addition to constructing more antennas like Canberra’s Deep Space Station 33, NASA is looking to the future by also experimenting with laser, or optical, communications to enable significantly more data to flow to and from Earth. The Deep Space Network currently relies on radio frequencies to communicate, but laser operates at a higher frequency, allowing more data to be transmitted.
      As part of that effort, NASA is flying the laser-based Deep Space Optical Communications experiment with the agency’s Psyche mission. Since the October 2023 launch, it has demonstrated high data rates over record-breaking distances and downlinked ultra-high definition streaming video from deep space.
      “These new technologies have the potential to boost the science and exploration returns of missions traveling throughout the solar system,” said Amy Smith, deputy project manager for the Deep Space Networkat JPL, which manages the network. “Laser and radio communications could even be combined to build hybrid antennas, or dishes that can communicate using both radio and optical frequencies at the same time. That could be a game changer for NASA.”
      For more information about the Deep Space Network, visit:
      https://www.nasa.gov/communicating-with-missions/dsn/
      NASA’s New Deep Space Network Antenna Has Its Crowning Moment NASA’s New Experimental Antenna Tracks Deep Space Laser VIDEO: How Do We Know Where Faraway Spacecraft Are? News Media Contact
      Ian J. O’Neill
      Jet Propulsion Laboratory, Pasadena, Calif.
      818-354-2649
      ian.j.oneill@jpl.nasa.gov
      2024-048
      Explore More
      5 min read Perseverance Rover Witnesses One Martian Dust Devil Eating Another
      Article 5 days ago 3 min read University High Triumphs at JPL-Hosted Ocean Sciences Bowl
      Article 1 week ago 6 min read NASA’s Curiosity Rover Detects Largest Organic Molecules Found on Mars
      Lee esta historia en español aquí. Researchers analyzing pulverized rock onboard NASA’s Curiosity rover have found…
      Article 2 weeks ago Share
      Details
      Last Updated Apr 08, 2025 Related Terms
      Deep Space Network Jet Propulsion Laboratory Explore More
      5 min read Perseverance Rover Witnesses One Martian Dust Devil Eating Another
      Article 5 days ago 3 min read University High Triumphs at JPL-Hosted Ocean Sciences Bowl
      Article 1 week ago 6 min read NASA’s Curiosity Rover Detects Largest Organic Molecules Found on Mars
      Lee esta historia en español aquí. Researchers analyzing pulverized rock onboard NASA’s Curiosity rover have found…
      Article 2 weeks ago Keep Exploring Discover Related Topics
      Missions
      Humans in Space
      Climate Change
      Solar System
      View the full article
    • By European Space Agency
      Image: ESA's Atomic Clock Ensemble in Space at NASA's Kennedy Space Center View the full article
    • By NASA
      The high-rise bridge that serves as the primary access point for employees and visitors to NASA’s Kennedy Space Center in Florida now is fully operational. In the late hours of March 18, 2025, the Florida Department of Transportation (FDOT) opened the westbound portion of the NASA Causeway Bridge, which spans the Indian River Lagoon and connects NASA Kennedy and Cape Canaveral Space Force Station to the mainland.
      This new bridge span (right side of photo) sits alongside its twin on the eastbound side, which has accommodated traffic in both directions since FDOT opened it on June 9, 2023. The new structure replaces the old two-lane drawbridge which operated at that location for nearly 60 years.
      “The old drawbridge served us well, witnessing decades of spaceflights since the Apollo era and supporting Kennedy’s transition to a multi-user spaceport,” said Kennedy’s Acting Director Kelvin Manning. “The new bridge will see NASA send American astronauts back to the Moon and on to Mars, and it will support the continued rapid growth of America’s commercial space industry here at Earth’s premier spaceport.”
      At 4,025 feet long, the new NASA Causeway Bridge is about 35% longer than its predecessor, featuring a 65-foot waterway clearance and a channel wide enough to handle larger vessels carrying cargo necessary for Kennedy to continue launching humanity’s future.
      The bridge sits on over 1,000 concrete pilings which total more than 22 miles in length. Nearly 270 concrete I-beams, each weighing hundreds of thousands of pounds, support the bridge, along with over 40,000 cubic yards of concrete and over 8.7 million pounds of steel. All 110 spans of the old drawbridge were demolished during the construction, with much of the material recycled for future projects.
      A $90 million federal infrastructure grant secured in July 2019 by Space Florida via the U.S. Department of Transportation funded nearly 50% of the drawbridge replacement as well the widening of nearby Space Commerce Way. NASA and the state of Florida provided the remaining funding for the upgrades.
      Photo credit: NASA/Glenn Benson
      View the full article
  • Check out these Videos

×
×
  • Create New...