Jump to content

Ariane 6 test model cryogenic system disconnection


Recommended Posts

Ariane_6_test_model_cryogenic_system_dis Video: 00:01:18

Teams from ESA, France’s space agency CNES and ArianeGroup successfully completed  the disconnection and retraction of the Ariane 6 cryogenic systems on 30 January 2024.

These operations mark the start of dismantling the Ariane 6 test model to make way for its first launch. The combined test phase for Ariane 6 using propellants is now over and the European rocket is on track for its inaugural launch.

The test model that is on the launch pad at Europe’s Spaceport in Kourou, French Guiana, stands 62 m high. It is exactly the same as the ‘production model’ Ariane 6 rockets that will soon be launched, except that its boosters are not tested as part of the complete rocket.

For this test, the fuel lines for the upper stage and main stage were disconnected. The yellow arms support the fuel lines that deliver liquid hydrogen and liquid oxygen to the upper stage that is powered by the Vinci orbital engine.

Instead of simply disconnecting the lines, the Ariane 6 teams approached the operations as more tests, or rehearsals, allowing the teams another chance to practice ahead of launch. Seconds before a liftoff, the cryogenic fuelling arms retract from the upper part of the rocket, removing the fuelling lines. The main stage is fuelled from the bottom of the rocket and these lines were also disconnected in the test.

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      NASA's Boeing Crew Flight Test Re-entry and Landing
    • By NASA
      NASA’s Boeing Crew Flight Test Undocking
    • By NASA
      The powerhouse of Gateway, NASA’s orbiting outpost around the Moon and a critical piece of infrastructure for Artemis, is in the midst of several electric propulsion system tests.
      The Power and Propulsion Element (PPE), being manufactured by Maxar Technologies, provides Gateway with power, high-rate communications, and propulsion for maneuvers around the Moon and to transit between different orbits. The PPE will be combined with the Habitation and Logistic Outpost (HALO) before the integrated spacecraft’s launch, targeted for late 2024 aboard a SpaceX Falcon Heavy. Together, these elements will serve as the hub for early Gateway crewed operations and various science and technology demonstrations as the full Gateway station is assembled around it in the coming years.
      In this image, PPE engineers successfully tested the integration of Aerojet Rocketdyne’s thruster with Maxar’s power procession unit and Xenon Flow Controller.
      Image Credit: NASA
      View the full article
    • By NASA
      NASA’s Boeing Crew Flight Test Status News Conference
    • By NASA
      Boeing’s Starliner spacecraft that launched NASA’s Crew Flight Test astronauts Butch Wilmore and Suni Williams to the International Space Station is pictured docked to the Harmony module’s forward port. (Credit: NASA) NASA Administrator Bill Nelson and leadership will hold an internal Agency Test Flight Readiness Review on Saturday, Aug. 24, for NASA’s Boeing Crew Flight Test. About an hour later, NASA will host a live news conference at 1 p.m. EDT from the agency’s Johnson Space Center in Houston.
      Watch the media event on NASA+, NASA Television, the NASA app, YouTube, and the agency’s website. Learn how to stream NASA content through a variety of platforms, including social media.
      Media interested in attending the news conference must contact the newsroom at NASA Johnson no later than 1 p.m., Friday, Aug. 23, at 281-483-5111 or jsccommu@mail.nasa.gov. Media participating by phone must RSVP no later than one hour prior to the start of the event. A copy of NASA’s media accreditation policy is online.
      NASA and Boeing have gathered data, both in space and on the ground, regarding the Starliner spacecraft’s propulsion and helium systems to better understand the ongoing technical challenges. The review will include a mission status update, review of technical data and closeout actions, as well as certify flight rationale to proceed with undocking and return from the space station.
      NASA’s Boeing Crew Flight Test launched on June 5 on a ULA (United Launch Alliance) Atlas V rocket from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida. It is an end-to-end test of the Starliner system as part of the agency’s Commercial Crew Program. Through partnership with American private industry, NASA is opening access to low Earth orbit and the space station to more people, science, and commercial opportunities.
      For NASA’s blog and more information about the mission, visit:
      https://www.nasa.gov/commercialcrew
      -end-
      Meira Bernstein / Josh Finch
      Headquarters, Washington
      202-358-1100
      meira.b.bernstein@nasa.gov / joshua.a.finch@nasa.gov
      Leah Cheshier / Sandra Jones
      Johnson Space Center, Houston
      281-483-5111
      leah.d.cheshier@nasa.gov / sandra.p.jones@nasa.gov
      Steve Siceloff / Danielle Sempsrott / Stephanie Plucinsky
      Kennedy Space Center, Florida
      321-867-2468
      steven.p.siceloff@nasa.gov / danielle.c.sempsrott@nasa.gov / stephanie.n.plucinsky@nasa.gov
      View the full article
  • Check out these Videos

×
×
  • Create New...