Jump to content

Kennedy Space Center Looks Ahead to a Busy Year in 2024


NASA

Recommended Posts

  • Publishers
NASA's Space Launch System rocket Mobile Launcher moves to the launch pad at Kennedy Space Center.
The mobile launcher, carried by the crawler-transporter 2, rolls out from its park site location to Launch Pad 39B at NASA’s Kennedy Space Center in Florida in August 2023 for testing ahead of the agency’s Artemis II mission.
NASA/Ben Smegelsky

Another jam-packed year is in store for NASA’s Kennedy Space Center in Florida as the momentum of a busy 2023 is carried forward into the new year. On the horizon are missions to the Moon, more crew and cargo flights to the International Space Station, and several upgrade projects across the spaceport.

NASA’s first CLPS (Commercial Lunar Payload Services) initiative mission with Astrobotic’s Peregrine lunar lander is set to begin work in 2024 after lifting off on the inaugural launch of United Launch Alliance’s Vulcan Centaur rocket. These missions will help the agency develop capabilities needed to explore the Moon under Artemis ahead of sending astronauts to the lunar surface. 

Another CLPS mission, set for launch early in the year aboard a SpaceX Falcon 9 rocket, will send the Intuitive Machines Nova-C lander to a landing site at the Moon’s South Pole region. The mission will carry NASA payloads focusing on plume-surface interactions, space weather/lunar surface interactions, radio astronomy, precision landing technologies, and a communication and navigation node for future autonomous navigation technologies.  

A SpaceX Falcon 9 lifts off from NASA's Kennedy Space Center in Florida.
The SpaceX Falcon 9 rocket carrying the Dragon spacecraft lifts off from Launch Complex 39A at NASA’s Kennedy Space Center in Florida in November 2023 on the company’s 29th commercial resupply services mission for the agency to the International Space Station.
SpaceX

Development toward Artemis II, NASA’s first crewed test flight of its lunar-focused Artemis program continues across Kennedy. SLS (Space Launch System) hardware, including twin solid rocket boosters and a 212-foot-tall core stage for the Artemis II mission, will begin stacking and integration inside the Vehicle Assembly Building in the coming months, after which teams will begin a series of testing prior to launch. Processing also is underway on the core stage for Artemis III. 

The Artemis II Orion crew and service modules will continue prelaunch processing inside Kennedy’s Neil Armstrong Operations and Checkout Building alongside the crew modules for Artemis III and Artemis IV– NASA’s initial missions to land the next humans on the lunar surface.  

Technicians work around Boeing's Starliner spacecraft supported by a yellow crane during processing.
The Starliner team works to finalize the mate of the crew module and new service module for NASA’s Boeing Crew Flight Test that will take NASA astronauts Barry “Butch” Wilmore and Sunita “Suni” Williams to and from the International Space Station.
Boeing/John Grant

NASA and its commercial partners, Boeing and SpaceX, have three Commercial Crew Program missions set to fly from Florida’s Space Coast, setting up another busy year of traffic for the International Space Station in 2024. Teams are readying for the short-duration Crew Flight Test of Boeing’s CST-100 Starliner no earlier than April. Meanwhile, NASA and SpaceX will continue crew rotation missions to the orbiting laboratory with Crew-8 expected no earlier than mid-February and Crew-9 to follow in mid-August.  

Other crewed missions to the space station include SpaceX and Axiom Space’s short-duration Axiom Mission 3 and Axiom Mission 4 private astronaut missions.  

SpaceX’s Polaris Dawn, the second private short-duration orbital flight will also lift off from Kennedy with four individuals that plan to attempt the first-ever commercial spacewalk. 

Along with crewed flights, three of the agency’s Commercial Resupply Services missions hosted on SpaceX’s Dragon cargo spacecraft, Northrop Grumman’s Cygnus, and the debut flight of Sierra Space’s cargo spaceplane, Dream Chaser, are slated to fly from Kennedy next year to deliver thousands of pounds of supplies, equipment, and science investigations to the orbiting laboratory. 

Four astronauts sit inside a SpaceX Dragon crew capsule.
The four SpaceX Crew-8 crew members (from left) Alexander Grebenkin from Roscosmos, and Michael Barratt, Matthew Dominick, and Jeanette Epps, all NASA astronauts, are pictured training inside a Dragon mockup crew vehicle at SpaceX headquarters in Hawthorne, California.
SpaceX

NASA’s Launch Services Program based at Kennedy has several science and CubeSat missions manifested to fly on commercial rockets next year. They represent a mix of some of the agency’s most complex robotic and scientific missions, as well as smaller cost-efficient missions, and missions sponsored by NASA’s CubeSat Launch Initiative

The first of three primary missions is NASA’s PACE (Plankton, Aerosol, Cloud, ocean Ecosystem) spacecraft that will launch early next year on a SpaceX Falcon 9 rocket. PACE’s science goals include extending ocean color, atmospheric aerosol, and cloud data records for Earth system and climate studies.  

GOES-U (Geostationary Operational Environmental Satellite-U) is slated to launch in April on a SpaceX Falcon Heavy rocket, the fourth and final satellite in NOAA’s GOES-R Series of advanced geostationary weather-observing satellites. Scheduled for an October launch on a Falcon Heavy, the agency’s Europa Clipper mission will investigate Jupiter’s moon Europa to determine if it has conditions suitable to support life.  

Among the small spacecraft and CubeSat missions slated to launch in 2024 are two dedicated launches on Rocket Lab’s Electron for PREFIRE (Polar Radiant Energy in the Infrared Experiment), which aims to give researchers a more accurate picture of the energy entering and leaving Earth. Blue Origin’s New Glenn rocket will host NASA’s EscaPADE (Escape and Plasma Acceleration and Dynamics Explorers) mission that will send two spacecraft to study solar wind energy and momentum through Mars’ unique hybrid magnetosphere. 

ksc-20231204-ph-kls01-0018-1.jpg?w=1920
Technicians process the NASA’s Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) observatory on a spacecraft dolly in a high bay at the Astrotech Space Operations Facility near the agency’s Kennedy Space Center in Florida.
NASA/Kim Shiflett

While next year’s expected cadence of nearly 100 launches from Florida’s Space Coast is likely to mirror 2023’s record-setting pace, something else to look out for will be upgrade and sustainability efforts around the spaceport.  

The Indian River Bridge construction project, which opened the first of two spans in June of 2023, and the solar site 6 project of the Utility Energy Services Contract, are expected to wrap up and become fully operational next year. 

Restoration and beautification efforts across Kennedy also include the consideration of several sites for development into natural wildflower prairies. In the spring, Spaceport Integration’s sustainability team will work on “Project Arbor at the Spaceport.” It will focus on planting Florida native trees and one seedling from the Artemis Moon Tree project along the Fitness Trail near Operations Support Building II to provide shade, benefit wildlife, and help improve air quality. 

A historical marker sponsored by NASA and the Florida Department of State will be installed in early 2024 at the site of Kennedy’s original Headquarters Building making it the first to be located within Kennedy’s secure area. 

As 2023 draws to a close, Kennedy Space Center is gearing up to support more groundbreaking missions that will expand human knowledge of Earth and our solar system while protecting the local ecosystem and natural resources. 

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By European Space Agency
      Week in images: 02-06 September 2024
      Discover our week through the lens
      View the full article
    • By NASA
      Hubble Space Telescope Home Hubble Examines a Busy… Missions Hubble Home Overview About Hubble The History of Hubble Hubble Timeline Why Have a Telescope in Space? Hubble by the Numbers At the Museum FAQs Impact & Benefits Hubble’s Impact & Benefits Science Impacts Cultural Impact Technology Benefits Impact on Human Spaceflight Astro Community Impacts Science Hubble Science Science Themes Science Highlights Science Behind Discoveries Hubble’s Partners in Science Universe Uncovered Explore the Night Sky Observatory Hubble Observatory Hubble Design Mission Operations Missions to Hubble Hubble vs Webb Team Hubble Team Career Aspirations Hubble Astronauts News Hubble News Hubble News Archive Social Media Media Resources Multimedia Multimedia Images Videos Sonifications Podcasts E-books Lithographs Fact Sheets Glossary Posters Hubble on the NASA App More Online Activities   2 min read
      Hubble Examines a Busy Galactic Center
      This NASA/ESA Hubble Space Telescope image features the active spiral galaxy IC 4709. ESA/Hubble & NASA, M. Koss, A, Barth This NASA/ESA Hubble Space Telescope image features the spiral galaxy IC 4709a located around 240 million light-years away in the southern constellation Telescopium. Hubble beautifully captures its faint halo and swirling disk filled with stars and dust bands. The compact region at its core might be the most remarkable sight. It holds an active galactic nucleus (AGN).
      If IC 4709’s core just held stars, it wouldn’t be nearly as bright. Instead, it hosts a gargantuan black hole, 65 million times more massive than our Sun. A disk of gas spirals around and eventually into this black hole, crashing together and heating up as it spins. It reaches such high temperatures that it emits vast quantities of electromagnetic radiation, from infrared to visible to ultraviolet light and X-rays. A lane of dark dust, just visible at the center of the galaxy in the image above, obscures the AGN in IC 4709. The dust lane blocks any visible light emission from the nucleus itself. Hubble’s spectacular resolution, however, gives astronomers a detailed view of the interaction between the quite small AGN and its host galaxy. This is essential to understanding supermassive black holes in galaxies much more distant than IC 4709, where resolving such fine details is not possible.
      This image incorporates data from two Hubble surveys of nearby AGNs originally identified by NASA’s Swift telescope. There are plans for Swift to collect new data on these galaxies. Swift houses three multiwavelength telescopes, collecting data in visible, ultraviolet, X-ray, and gamma-ray light. Its X-ray component will allow SWIFT to directly see the X-rays from IC 4709’s AGN breaking through the obscuring dust. ESA’s Euclid telescope — currently surveying the dark universe in optical and infrared light — will also image IC 4709 and other local AGNs. Their data, along with Hubble’s, provides astronomers with complementary views across the electromagnetic spectrum. Such views are key to fully research and better understand black holes and their influence on their host galaxies.

      Download this image

      Facebook logo @NASAHubble @NASAHubble Instagram logo @NASAHubble Media Contact:
      Claire Andreoli
      NASA’s Goddard Space Flight Center, Greenbelt, MD
      claire.andreoli@nasa.gov
      Share








      Details
      Last Updated Sep 05, 2024 Editor Andrea Gianopoulos Location NASA Goddard Space Flight Center Related Terms
      Active Galaxies Astrophysics Astrophysics Division Galaxies Goddard Space Flight Center Hubble Space Telescope Missions Spiral Galaxies Keep Exploring Discover More Topics From Hubble
      Hubble Space Telescope


      Since its 1990 launch, the Hubble Space Telescope has changed our fundamental understanding of the universe.


      Hubble’s Galaxies



      Hubble Science Highlights



      Hubble E-books


      View the full article
    • By NASA
      Credit: NASA NASA has awarded the Center, Operations Maintenance, and Engineering II contract to Jacobs Technology Inc. of Tullahoma, Tennessee, to support operations at the agency’s Langley Research Center in Hampton, Virginia.
      The contract is a cost-plus-fixed-fee indefinite-delivery/indefinite-quantity contract with a maximum potential value of $973.7 million. Following a phase-in period that starts Tuesday, Oct. 1 and runs to Dec. 31, the contract will have a base period of 15 months followed by five optional periods that could extend the contract to the end of 2035.
      Under this contract, Jacobs Technology will assist in crucial research operations, engineering, and maintenance services at NASA Langley to help the center continue its work to solve the mysteries of our home planet, solar system, and beyond. The firm also will provide institutional and research operations support, maintenance and engineering for the center’s facilities, and central utilities operations, among other services.
      For information about NASA and agency programs, visit:
      https://www.nasa.gov
      -end-
      Tiernan Doyle
      Headquarters, Washington
      202-358-1600
      tiernan.doyle@nasa.gov
      Share
      Details
      Last Updated Sep 05, 2024 LocationNASA Headquarters Related Terms
      Langley Research Center NASA Centers & Facilities View the full article
    • By NASA
      On the left, the Canopee transport carrier containing the European Service Module for NASA’s Artemis III mission arrives at Port Canaveral in Florida, on Tuesday, Sept. 3, 2024, before completing the last leg of its journey to the agency’s Kennedy Space Center’s Neil A. Armstrong Operations and Checkout via truck. On the right, NASA’s Pegasus barge, carrying several pieces of hardware for Artemis II, III, and IV arrives at NASA Kennedy’s Launch Complex 39 turn basin wharf on Thursday, Sept. 5, 2024. Credit: NASA From across the Atlantic Ocean and through the Gulf of Mexico, two ships converged, delivering key spacecraft and rocket components of NASA’s Artemis campaign to the agency’s Kennedy Space Center in Florida.
      On Sept. 3, ESA (European Space Agency) marked a milestone in the Artemis III mission as its European-built service module for NASA’s Orion spacecraft completed a transatlantic journey from Bremen, Germany, to Port Canaveral, Florida, where technicians moved it to nearby NASA Kennedy. Transported aboard the Canopée cargo ship, the European Service Module—assembled by Airbus with components from 10 European countries and the U.S.—provides propulsion, thermal control, electrical power, and water and oxygen for its crews.
      “Seeing multi-mission hardware arrive at the same time demonstrates the progress we are making on our Artemis missions,” said Amit Kshatriya, deputy associate administrator, Moon to Mars Program, at NASA Headquarters in Washington. “We are going to the Moon together with our industry and international partners and we are manufacturing, assembling, building, and integrating elements for Artemis flights.”
      NASA’s Pegasus barge, the agency’s waterway workhorse for transporting large hardware by sea, ferried multi-mission hardware for the agency’s SLS (Space Launch System) rocket, the Artemis II launch vehicle stage adapter, the “boat-tail” of the core stage for Artemis III, the core stage engine section for Artemis IV, along with ground support equipment needed to move and assemble the large components. The barge pulled into NASA Kennedy’s Launch Complex 39B Turn Basin Thursday.
      The spacecraft factory inside NASA Kennedy’s Neil Armstrong Operations and Checkout Building is set to buzz with additional activity in the coming months. With the Artemis II Orion crew and service modules stacked together and undergoing testing, and engineers outfitting the Artemis III and IV crew modules, engineers soon will connect the newly arrived European Service Module to the crew module adapter, which houses electronic equipment for communications, power, and control, and includes an umbilical connector that bridges the electrical, data, and fluid systems between the crew and service modules.
      The SLS rocket’s cone-shaped launch vehicle stage adapter connects the core stage to the upper stage and protects the rocket’s flight computers, avionics, and electrical devices in the upper stage system during launch and ascent. The adapter will be taken to Kennedy’s Vehicle Assembly Building in preparation for Artemis II rocket stacking operations.
      The boat-tail, which will be used during the assembly of the SLS core stage for Artemis III, is a fairing-like structure that protects the bottom end of the core stage and RS-25 engines. This hardware, picked up at NASA’s Michoud Assembly Facility in New Orleans, will join the Artemis III core stage engine section housed in the spaceport’s Space Systems Processing Facility.
      The Artemis IV SLS core stage engine section arrived from NASA Michoud and also will transfer to the center’s processing facility ahead of final assembly.
      Under the Artemis campaign, NASA will land the first woman, first person of color, and its first international partner astronaut on the lunar surface, establishing long-term exploration for scientific discovery and preparing for human missions to Mars. The agency’s SLS rocket and Orion spacecraft, and supporting ground systems, along with the human landing system, next-generation spacesuits and rovers, and Gateway, serve as NASA’s foundation for deep space exploration.
      For more information on NASA’s Artemis missions, visit:
      https://www.nasa.gov/artemis
      -end-
      Rachel Kraft
      Headquarters, Washington
      202-358-1600
      Rachel.h.kraft@nasa.gov
      Allison Tankersley, Antonia Jaramillo Botero
      Kennedy Space Center, Florida
      321-867-2468
      Allison.p.tankersley@nasa.gov/ antonia.jaramillobotero@nasa.gov
      View the full article
    • By NASA
      2 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      A prototype of the Mini Potable Water Dispenser, currently in development at NASA’s Marshall Space Flight Center, is displayed alongside various food pouches during a demonstration at NASA’s Johnson Space Center. NASA/David DeHoyos NASA engineers are working hard to ensure no astronaut goes hungry on the Artemis IV mission.
      When international teams of astronauts live on Gateway, humanity’s first space station to orbit the Moon, they’ll need innovative gadgets like the Mini Potable Water Dispenser. Vaguely resembling a toy water soaker, it manually dispenses water for hygiene bags, to rehydrate food, or simply to drink. It is designed to be compact, lightweight, portable and manual, making it ideal for Gateway’s relatively small size and remote location compared to the International Space Station closer to Earth.
      The team at NASA’s Marshall Space Flight Center in Huntsville, Alabama leading the development of the dispenser understands that when it comes to deep space cuisine, the food astronauts eat is so much more than just fuel to keep them alive.
      “Food doesn’t just provide body nourishment but also soul nourishment,” said Shaun Glasgow, project manager at Marshall. “So ultimately this device will help provide that little piece of soul nourishment. After a long day, the crew can float back and enjoy some pasta or scrambled eggs, a small sense of normalcy in a place far from home.”
      As NASA continues to innovate and push the boundaries of deep space exploration, devices like the compact, lightweight dispenser demonstrate a blend of practicality and ingenuity that will help humanity chart its path to the Moon, Mars, and beyond.
      An engineer demonstrates the use of the Mini Potable Water Dispenser by rehydrating a food pouch during a testing session at Johnson Space Center on June 6, 2024. This compact, lightweight dispenser is designed to help astronauts prepare meals in deep space.NASA/David DeHoyos A close-up view of the Mini Potable Water Dispenser prototype during a testing demonstration at NASA’s Johnson Space Center on June 6, 2024.NASA/David DeHoyos NASA food scientists rehydrate a food pouch during a test of the Mini Potable Water Dispenser at Johnson Space Center on June 6, 2024. NASA/David DeHoyos A NASA food scientist captures video of the Mini Potable Water Dispenser during testing at Johnson Space Center.NASA/David DeHoyos Matt Rowell, an engineer from the Marshall Space Flight Center demonstrates the Mini Potable Water Dispenser to NASA food scientists during a testing session.NASA/David DeHoyos Project manager Shaun Glasgow (right) demonstrates the Mini Potable Water Dispenser. NASA/David DeHoyos Brett Montoya, a lead space architect in the Center for Design and Space Architecture at Johnson Space Center, rehydrates a package of food using the Mini Potable Water Dispenser.NASA/David DeHoyos Learn More about Gateway Facebook logo @NASAGateway @NASA_Gateway Instagram logo @nasaartemis Share
      Details
      Last Updated Sep 04, 2024 EditorBriana R. ZamoraContactBriana R. Zamorabriana.r.zamora@nasa.govLocationJohnson Space Center Related Terms
      Artemis Earth's Moon Exploration Systems Development Mission Directorate Gateway Program Gateway Space Station Johnson Space Center Marshall Space Flight Center Explore More
      2 min read Gateway: Energizing Exploration
      Discover the cutting-edge technology powering Gateway, humanity's first lunar space station.
      Article 2 weeks ago 3 min read Gateway: Up Close in Stunning Detail
      Witness Gateway in stunning detail with this video that brings the future of lunar exploration…
      Article 2 months ago 2 min read Earth to Gateway: Electric Field Tests Enhance Lunar Communication
      Learn how engineers at NASA's Johnson Space Center are using electric field testing to optimize…
      Article 1 month ago Keep Exploring Discover More Topics From NASA
      Missions
      Humans in Space
      Climate Change
      Solar System
      View the full article
  • Check out these Videos

×
×
  • Create New...