Jump to content

Kennedy Space Center’s NASA Causeway Bridge Construction


NASA

Recommended Posts

  • Publishers
KSC-20231127-PH_JBP01-0068~large.jpg?w=1

In this aerial view, crews with Orion Marine Construction work to complete the westbound span of the Indian River Bridge, while daily traffic moves along the upgraded eastbound lanes of the bridge leading to NASA’s Kennedy Space Center in Florida on Monday, Nov. 27, 2023. The bridge crosses the Indian River Lagoon and connects Kennedy and the Cape Canaveral Space Force Station to the mainland via State Road 405/NASA Causeway in nearby Titusville. The new high-rise bridge serves as the primary entrance and exit to the space center for employees and visitors.

“This is the first partnered infrastructure project of its kind at Kennedy – the U.S. Army Corps of Engineers has historically designed and built the bridges serving the spaceport, and NASA operated and maintained them since the original construction of the spaceport about 60 years ago,” said Justin Ausanka, senior project manager, Experimental Facilities Development at Kennedy. “With this project, we are taking advantage of the expertise and experience of the Florida Department of Transportation to most efficiently build, operate, and maintain the future bridges as part of the state highway system. In turn, NASA can continue to focus on our core competencies and our vision of igniting space exploration and discovery for all.”

The new bridge spans replace a pair of two-lane drawbridges built in the mid-1960s to support NASA’s Apollo program. The first of the two new spans opened to the public ahead of schedule on June 9, 2023. In development for well over a decade, the load capacity, width, and grade of the bridge were designed to support the largest future payloads and vehicles at the spaceport while simultaneously supporting increased public traffic to and from Kennedy. 

Photo credit: NASA/Jamie Peer

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      NASA and Boeing welcomed Starliner back to Earth following the uncrewed spacecraft’s successful landing at 10:01 p.m. MDT Sept. 6, 2024, at the White Sands Space Harbor in New Mexico. Credit: NASA NASA and Boeing safely returned the uncrewed Starliner spacecraft following its landing at 10:01 p.m. MDT Sept. 6 at White Sands Space Harbor in New Mexico, concluding a three-month flight test to the International Space Station.
      “I am extremely proud of the work our collective team put into this entire flight test, and we are pleased to see Starliner’s safe return,” said Ken Bowersox, associate administrator, Space Operations Mission Directorate at NASA Headquarters in Washington. “Even though it was necessary to return the spacecraft uncrewed, NASA and Boeing learned an incredible amount about Starliner in the most extreme environment possible. NASA looks forward to our continued work with the Boeing team to proceed toward certification of Starliner for crew rotation missions to the space station.”
      The flight on June 5 was the first time astronauts launched aboard the Starliner. It was the third orbital flight of the spacecraft, and its second return from the orbiting laboratory. Starliner now will ship to NASA’s Kennedy Space Center in Florida for inspection and processing.
      NASA’s Commercial Crew Program requires a spacecraft to fly a crewed test flight to prove the system is ready for regular flights to and from the orbiting laboratory. Following Starliner’s return, the agency will review all mission-related data.
      “We are excited to have Starliner home safely. This was an important test flight for NASA in setting us up for future missions on the Starliner system,” said Steve Stich, manager of NASA’s Commercial Crew Program. “There was a lot of valuable learning that will enable our long-term success. I want to commend the entire team for their hard work and dedication over the past three months.”
      NASA astronauts Butch Wilmore and Suni Williams launched on June 5 aboard Starliner for the agency’s Boeing Crewed Flight Test from Cape Canaveral Space Force Station in Florida. On June 6, as Starliner approached the space station, NASA and Boeing identified helium leaks and experienced issues with the spacecraft’s reaction control thrusters. Following weeks of in-space and ground testing, technical interchange meetings, and agency reviews, NASA made the decision to prioritize safety and return Starliner without its crew. Wilmore and Williams will continue their work aboard station as part of the Expedition 71/72 crew, returning in February 2025 with the agency’s SpaceX Crew-9 mission.
      The crew flight test is part of NASA’s Commercial Crew Program. The goal of NASA’s Commercial Crew Program is safe, reliable, and cost-effective transportation to and from the International Space Station and low Earth orbit. This already is providing additional research time and has increased the opportunity for discovery aboard humanity’s microgravity testbed, including helping NASA prepare for human exploration of the Moon and Mars.
      Learn more about NASA’s Commercial Crew program at:
      https://www.nasa.gov/commercialcrew
      -end-
      Joshua Finch / Jimi Russell
      Headquarters, Washington
      202-358-1100
      joshua.a.finch@nasa.gov / james.j.russell@nasa.gov
      Leah Cheshier
      Johnson Space Center, Houston
      281-483-5111
      leah.d.cheshier@nasa.gov
      Steve Siceloff / Danielle Sempsrott / Stephanie Plucinsky
      Kennedy Space Center, Florida
      321-867-2468
      steven.p.siceloff@nasa.gov / danielle.c.sempsrott@nasa.gov / stephanie.n.plucinsky@nasa.gov
      Share
      Details
      Last Updated Sep 07, 2024 EditorJessica TaveauLocationNASA Headquarters Related Terms
      Commercial Crew International Space Station (ISS) ISS Research View the full article
    • By NASA
      The Roscosmos Soyuz MS-26 spacecraft will launch from the Baikonur Cosmodrome in Kazakhstan to the International Space Station with (pictured left to right) NASA astronaut Don Pettit and Roscosmos cosmonauts Alexey Ovchinin and Ivan Vagner.Credit: Gagarin Cosmonaut Training Center NASA astronaut Don Pettit will launch aboard the Roscosmos Soyuz MS-26 spacecraft, accompanied by cosmonauts Alexey Ovchinin and Ivan Vagner, to the International Space Station where they will join the Expedition 71 crew in advancing scientific research.
      Pettit, Ovchinin, and Vagner will lift off at 12:23 p.m. EDT Wednesday, Sept. 11 (9:23 p.m. Baikonur time) from the Baikonur Cosmodrome in Kazakhstan.
      Coverage will stream on NASA+, the NASA app, and the agency’s website. Learn how to stream NASA content through a variety of platforms including social media.
      After a two-orbit, three-hour trajectory to the station, the spacecraft will automatically dock at 3:33 p.m. at the orbiting laboratory’s Rassvet module. Shortly after, hatches will open between the spacecraft and the station.
      Once aboard, the trio will join NASA astronauts Tracy C. Dyson, Mike Barratt, Matthew Dominick, Jeanette Epps, Butch Wilmore, and Suni Williams, as well as Roscosmos cosmonauts Nikolai Chub, Alexander Grebenkin, and Oleg Kononenko.
      NASA’s coverage is as follows (all times Eastern and subject to change based on real-time operations):
      11:15 a.m. – Launch coverage begins on NASA+, the NASA app, YouTube, and the agency’s website.
      12:23 p.m. – Launch
      2:30 p.m. – Rendezvous and docking coverage begins on NASA+, the NASA app, YouTube, and the agency’s website.
      3:33 p.m. – Docking
      5:30 p.m. – Hatch opening and welcome remarks coverage begins on NASA+, the NASA app, YouTube, and the agency’s website.
      5:50 p.m. – Hatch opening
      The trio will spend approximately six months aboard the orbital laboratory as Expedition 71 and 72 crew members before returning to Earth in the spring of 2025. This will be the fourth spaceflight for Pettit and Ovchinin, and the second for Vagner.
      For more than two decades, people have lived and worked continuously aboard the International Space Station, advancing scientific knowledge, and making research breakthroughs that are not possible on Earth. The station is a critical testbed for NASA to understand and overcome the challenges of long-duration spaceflight and to expand commercial opportunities in low Earth orbit. As commercial companies focus on providing human space transportation services and destinations as part of a robust low Earth orbit economy, NASA is focusing more resources on deep space missions to the Moon as part of Artemis in preparation for future human missions to Mars.
      Learn more about International Space Station research and operations at:
      https://www.nasa.gov/station
      -end-
      Joshua Finch / Claire O’Shea
      Headquarters, Washington
      202-358-1100
      joshua.a.finch@nasa.gov / claire.a.o’shea@nasa.gov
      Sandra Jones
      Johnson Space Center, Houston
      281-483-5111
      sandra.p.jones@nasa.gov
      Share
      Details
      Last Updated Sep 06, 2024 LocationNASA Headquarters Related Terms
      International Space Station (ISS) Astronauts Donald R. Pettit Humans in Space ISS Research Johnson Space Center View the full article
    • By NASA
      Credit: NASA NASA has awarded the Center, Operations Maintenance, and Engineering II contract to Jacobs Technology Inc. of Tullahoma, Tennessee, to support operations at the agency’s Langley Research Center in Hampton, Virginia.
      The contract is a cost-plus-fixed-fee indefinite-delivery/indefinite-quantity contract with a maximum potential value of $973.7 million. Following a phase-in period that starts Tuesday, Oct. 1 and runs to Dec. 31, the contract will have a base period of 15 months followed by five optional periods that could extend the contract to the end of 2035.
      Under this contract, Jacobs Technology will assist in crucial research operations, engineering, and maintenance services at NASA Langley to help the center continue its work to solve the mysteries of our home planet, solar system, and beyond. The firm also will provide institutional and research operations support, maintenance and engineering for the center’s facilities, and central utilities operations, among other services.
      For information about NASA and agency programs, visit:
      https://www.nasa.gov
      -end-
      Tiernan Doyle
      Headquarters, Washington
      202-358-1600
      tiernan.doyle@nasa.gov
      Share
      Details
      Last Updated Sep 05, 2024 LocationNASA Headquarters Related Terms
      Langley Research Center NASA Centers & Facilities View the full article
    • By NASA
      On the left, the Canopee transport carrier containing the European Service Module for NASA’s Artemis III mission arrives at Port Canaveral in Florida, on Tuesday, Sept. 3, 2024, before completing the last leg of its journey to the agency’s Kennedy Space Center’s Neil A. Armstrong Operations and Checkout via truck. On the right, NASA’s Pegasus barge, carrying several pieces of hardware for Artemis II, III, and IV arrives at NASA Kennedy’s Launch Complex 39 turn basin wharf on Thursday, Sept. 5, 2024. Credit: NASA From across the Atlantic Ocean and through the Gulf of Mexico, two ships converged, delivering key spacecraft and rocket components of NASA’s Artemis campaign to the agency’s Kennedy Space Center in Florida.
      On Sept. 3, ESA (European Space Agency) marked a milestone in the Artemis III mission as its European-built service module for NASA’s Orion spacecraft completed a transatlantic journey from Bremen, Germany, to Port Canaveral, Florida, where technicians moved it to nearby NASA Kennedy. Transported aboard the Canopée cargo ship, the European Service Module—assembled by Airbus with components from 10 European countries and the U.S.—provides propulsion, thermal control, electrical power, and water and oxygen for its crews.
      “Seeing multi-mission hardware arrive at the same time demonstrates the progress we are making on our Artemis missions,” said Amit Kshatriya, deputy associate administrator, Moon to Mars Program, at NASA Headquarters in Washington. “We are going to the Moon together with our industry and international partners and we are manufacturing, assembling, building, and integrating elements for Artemis flights.”
      NASA’s Pegasus barge, the agency’s waterway workhorse for transporting large hardware by sea, ferried multi-mission hardware for the agency’s SLS (Space Launch System) rocket, the Artemis II launch vehicle stage adapter, the “boat-tail” of the core stage for Artemis III, the core stage engine section for Artemis IV, along with ground support equipment needed to move and assemble the large components. The barge pulled into NASA Kennedy’s Launch Complex 39B Turn Basin Thursday.
      The spacecraft factory inside NASA Kennedy’s Neil Armstrong Operations and Checkout Building is set to buzz with additional activity in the coming months. With the Artemis II Orion crew and service modules stacked together and undergoing testing, and engineers outfitting the Artemis III and IV crew modules, engineers soon will connect the newly arrived European Service Module to the crew module adapter, which houses electronic equipment for communications, power, and control, and includes an umbilical connector that bridges the electrical, data, and fluid systems between the crew and service modules.
      The SLS rocket’s cone-shaped launch vehicle stage adapter connects the core stage to the upper stage and protects the rocket’s flight computers, avionics, and electrical devices in the upper stage system during launch and ascent. The adapter will be taken to Kennedy’s Vehicle Assembly Building in preparation for Artemis II rocket stacking operations.
      The boat-tail, which will be used during the assembly of the SLS core stage for Artemis III, is a fairing-like structure that protects the bottom end of the core stage and RS-25 engines. This hardware, picked up at NASA’s Michoud Assembly Facility in New Orleans, will join the Artemis III core stage engine section housed in the spaceport’s Space Systems Processing Facility.
      The Artemis IV SLS core stage engine section arrived from NASA Michoud and also will transfer to the center’s processing facility ahead of final assembly.
      Under the Artemis campaign, NASA will land the first woman, first person of color, and its first international partner astronaut on the lunar surface, establishing long-term exploration for scientific discovery and preparing for human missions to Mars. The agency’s SLS rocket and Orion spacecraft, and supporting ground systems, along with the human landing system, next-generation spacesuits and rovers, and Gateway, serve as NASA’s foundation for deep space exploration.
      For more information on NASA’s Artemis missions, visit:
      https://www.nasa.gov/artemis
      -end-
      Rachel Kraft
      Headquarters, Washington
      202-358-1600
      Rachel.h.kraft@nasa.gov
      Allison Tankersley, Antonia Jaramillo Botero
      Kennedy Space Center, Florida
      321-867-2468
      Allison.p.tankersley@nasa.gov/ antonia.jaramillobotero@nasa.gov
      View the full article
    • By NASA
      Técnicos ponen a prueba un conjunto de enormes paneles solares que miden aproximadamente 14,2 metros de largo y 4,1 metros de alto para la nave espacial Europa Clipper de la NASA, dentro de la Instalación de servicio de carga peligrosa de la agencia en el Centro Espacial Kennedy en Florida el 7 de agosto.Crédito: NASA/Kim Shiflett Read this release in English here.
      La NASA y SpaceX tienen planificado que la ventana para el lanzamiento de la misión Europa Clipper se abra el jueves 10 de octubre. Esta misión ayudará a los científicos a determinar si una de las lunas heladas de Júpiter podría albergar vida. Esta misión de la NASA despegará a bordo de un cohete Falcon Heavy de SpaceX, desde el Complejo de Lanzamientos 39A en el Centro Espacial Kennedy de la NASA en Florida.
      Europa Clipper llevará a bordo nueve instrumentos y un experimento científico sobre gravedad para recopilar mediciones detalladas mientras se encuentra en órbita alrededor de Júpiter y realiza varios sobrevuelos cercanos de su luna Europa. Las investigaciones sugieren que, debajo de la corteza de hielo de Europa, existe un océano que tiene dos veces el volumen de todos los océanos de la Tierra.
      Los medios de comunicación interesados en cubrir el lanzamiento de Europa Clipper deben solicitar una acreditación de prensa. Los plazos para la acreditación de los medios son los siguientes:
      Los ciudadanos estadounidenses que representen a medios de comunicación nacionales o internacionales deben solicitar su acreditación antes de las 11:59 p.m. hora del este del viernes 27 de septiembre. Los representantes de medios internacionales con ciudadanía de otros países deben presentar su solicitud antes de las 11:59 p.m. hora del este del viernes 20 de septiembre. Los medios de comunicación que requieran arreglos logísticos especiales, tales como espacio para camiones de transmisión satelital, tiendas de campaña o conexiones eléctricas, deben escribir por correo electrónico a ksc-media-accreditat@mail.nasa.gov antes del 1 de octubre.
      Una copia del reglamento de la NASA para la acreditación de medios está disponible en línea (en inglés). Si tienes preguntas sobre tu acreditación, por favor envía un correo electrónico a ksc-media-accreditat@mail.nasa.gov. Para otras preguntas sobre la misión, por favor comunícate con la sala de prensa del Centro Espacial Kennedy al teléfono 321-867-2468.
      Para obtener información sobre cobertura en español en el Centro Espacial Kennedy o si deseas solicitar entrevistas en español, comunícate con Antonia Jaramillo: 321-501-8425, o Messod Bendayan: 256-930-1371.
      Los medios de comunicación acreditados tendrán la oportunidad de participar en una serie de sesiones informativas previas al lanzamiento y entrevistas con el personal clave de la misión, incluyendo una sesión informativa la semana del 9 de septiembre. La NASA comunicará detalles adicionales sobre el programa de eventos para los medios a medida que se acerque la fecha de lanzamiento.
      La NASA también publicará actualizaciones sobre los preparativos para el lanzamiento de la nave espacial en el blog (en inglés) de Europa Clipper de la NASA.
      El principal objetivo científico de Europa Clipper es determinar si existen lugares debajo de la superficie de Europa que pudieran sustentar la vida. Los tres objetivos científicos principales de la misión son comprender la naturaleza de la capa de hielo y el océano que está debajo de ella, junto con la composición y la geología de esta luna. La detallada exploración de Europa que lleve a cabo esta misión ayudará a los científicos a comprender mejor el potencial astrobiológico de los mundos habitables más allá de nuestro planeta.
      Administrado por Caltech en Pasadena, California, el Laboratorio de Propulsión a Chorro (JPL, por sus siglas en inglés) de la NASA en el sur de California lidera el desarrollo de la misión Europa Clipper, en asociación con el Laboratorio de Física Aplicada Johns Hopkins (APL, por sus siglas en inglés) en Laurel, Maryland, para la Dirección de Misiones Científicas de la NASA en Washington. APL diseñó el cuerpo principal de la nave espacial en colaboración con JPL y el Centro de Vuelo Espacial Goddard de la NASA en Greenbelt, Maryland. La Oficina del Programa de Misiones Planetarias en el Centro de Vuelo Espacial Marshall de la NASA en Huntsville, Alabama, gestiona la ejecución del programa de la misión Europa Clipper.
      El Programa de Servicios de Lanzamiento de la NASA, con sede en el centro Kennedy, gestiona el servicio de lanzamiento de la nave espacial Europa Clipper.
      Para obtener más detalles sobre la misión y actualizaciones sobre los preparativos del lanzamiento, visita el sitio web (en inglés):
      https://science.nasa.gov/mission/europa-clipper
      Leejay Lockhart
      Centro Espacial Kennedy, Florida
      321-747-8310
      leejay.lockhart@nasa.gov
      Karen Fox / Alana Johnson
      Sede de la NASA, Washington
      202-358-1600 / 202-358-1501
      karen.c.fox@nasa.gov / alana.r.johnson@nasa.gov
      María José Viñas
      Sede de la NASA, Washington
      240-458-0248
      maria-jose.vinasgarcia@nasa.gov
      Julian Coltre
      Sede de la NASA, Washington
      202-358-1100
      Julian.n.coltre@nasa.gov
      View the full article
  • Check out these Videos

×
×
  • Create New...