Jump to content

55 Years Ago: Eight Months Before the Moon Landing


NASA

Recommended Posts

  • Publishers

November 1968 proved pivotal to achieving the goal of landing a man on the Moon before the end of the decade. The highly successful Apollo 7 mission that returned American astronauts to space provided the confidence for NASA to decide to send the next flight, Apollo 8, on a trip to orbit the Moon in December. At NASA’s Kennedy Space Center (KSC) in Florida, the Saturn V rocket and the Apollo spacecraft for that mission sat on Launch Pad 39A undergoing tests for its upcoming launch. In the nearby Vehicle Assembly Building (VAB), the three stages of the Saturn V for the Apollo 9 mission sat stacked awaiting the addition of its spacecraft undergoing final testing. Also in the VAB, workers had begun stacking the Apollo 10 Saturn V, while the Apollo 10 spacecraft arrived for testing. As the Apollo 8 and 9 crews continued their training, NASA named the crew for Apollo 10 and announced the science experiments that the first Moon landing astronauts would deploy.

Image of President Lyndon B. Johnson, second from left, presents Apollo 7 astronauts Walter M. Schirra, left, Donn F. Eisele, and R. Walter Cunningham with Exceptional Service Medals at the LBJ Ranch Entertainer Bob Hope, second from right, taped an episode of his show at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, with guests the “Voice of Mission Control” Paul P. Haney, left, Apollo 7 astronauts Schirra, Cunningham, and Eisele, and television star Barbara Eden The Apollo 7 Command Module on display at the Frontiers of Flight Museum at Dallas Love Field
Left: President Lyndon B. Johnson, second from left, presents Apollo 7 astronauts Walter M. Schirra, left, Donn F. Eisele, and R. Walter Cunningham with Exceptional Service Medals at the LBJ Ranch. Middle: Entertainer Bob Hope, second from right, taped an episode of his show at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston, with guests the “Voice of Mission Control” Paul P. Haney, left, Apollo 7 astronauts Schirra, Cunningham, and Eisele, and television star Barbara Eden. Right: The Apollo 7 Command Module on display at the Frontiers of Flight Museum at Dallas Love Field.

Following their highly successful flight, Apollo 7 astronauts Walter M. Schirra, Donn F. Eisele, and R. Walter Cunningham returned to Houston’s Ellington Air Force Base on Oct. 26. On Nov. 2, President Lyndon B. Johnson presented the astronauts with Exceptional Service Medals at the LBJ Ranch in Johnson City, Texas. Four days later, comedian Bob Hope filmed an episode of his weekly television variety show in the auditorium of the Manned Spacecraft Center (MSC), now the Johnson Space Center in Houston. Hope saluted the Apollo 7 astronauts in a skit that included actress Barbara Eden, star of the television series “I Dream of Jeannie” that featured fictional astronauts. Paul P. Haney, MSC Director of Public Affairs and the “Voice of Mission Control,” also participated in the skit. Following the recovery of Apollo 7, the prime recovery ship U.S.S. Essex sailed for Norfolk Naval Air Station in Virginia, where on Oct. 27 workers offloaded the Command Module (CM), and placed it aboard a cargo plane to fly it to California for return to its manufacturer, North American Rockwell Space Division in Downey, for postflight inspection. On Jan. 20, 1969, the Apollo 7 astronauts as well as their spacecraft took part in President Richard M. Nixon’s first inauguration parade. In 1970, NASA transferred the Apollo 7 spacecraft to the Smithsonian Institution that loaned it to the National Museum of Science and Technology in Ottawa, Canada, for display. Following its return to the United States in 2004, it went on display at the Frontiers of Flight Museum at Love Field in Dallas.

Image of the circumlunar trajectory of Apollo 8 Apollo 8 astronauts William A. Anders, left, James A. Lovell, and Frank Borman during a press conference shortly after the announcement of their mission to orbit the Moon Photo of Anders, left, Lovell, and Borman in the Command Module simulator
Left: The circumlunar trajectory of Apollo 8. Middle: Apollo 8 astronauts William A. Anders, left, James A. Lovell, and Frank Borman during a press conference shortly after the announcement of their mission to orbit the Moon. Right: Anders, left, Lovell, and Borman in the Command Module simulator.

On Nov. 12, 1968, NASA Headquarters put out the following statement: “The National Aeronautics and Space Administration today announced that the Apollo 8 mission would be prepared for an orbital flight around the Moon.” That momentous statement ended weeks of intense internal agency deliberations and public speculation about Apollo 8’s targeted mission. The original mission plan called for Apollo 8 to conduct the first test of the Lunar Module (LM) in Earth orbit, but when the LM fell behind schedule, NASA managers in August began contemplating sending the Apollo 8 crew on a lunar orbital test of the Command Module (CM). The decision hinged partly on a successful Apollo 7 mission, and with that milestone passed, NASA Administrator James E. Webb approved the daring plan. On only the second crewed Apollo mission, the first crew to launch on the Saturn V, and only the third launch of the mighty Moon rocket, with the second of those experiencing some serious anomalies, the decision weighed the risks against the benefits of achieving the Moon landing goal before the end of the decade. With the Dec. 21 launch date fast approaching, the Apollo 8 crew of Frank Borman, James A. Lovell, and William A. Anders and their backups Neil A. Armstrong, Edwin E. “Buzz” Aldrin, and Fred W. Haise had begun training for the lunar mission even before the official announcement. During a Nov. 16 press conference, Borman, Lovell, and Anders discussed their preparations for the historic mission. On Nov. 19, at KSC’s Launch Complex 39, engineers completed the Flight Readiness Test to validate the launch vehicle, spacecraft, and ground systems.

Photo of The Apollo 9 prime crew of James A. McDivitt, left, David R. Scott, and Russell L. Schweickart, not pictured, prepares for an altitude chamber test of their Command Module (CM) in the Manned Spacecraft Operations Building at NASA’s Kennedy Space Center in Florida Photo of McDivitt, emerging from the CM, Schweickart, at left in the raft, and Scott complete water egress training in the Gulf of Mexico Photo of The Apollo 9 backup crew of Charles “Pete” Conrad, left, Richard F. Gordon, and Alan L. Bean prepares for their water egress training
Left: The Apollo 9 prime crew of James A. McDivitt, left, David R. Scott, and Russell L. Schweickart, not pictured, prepares for an altitude chamber test of their Command Module (CM) in the Manned Spacecraft Operations Building at NASA’s Kennedy Space Center in Florida. Middle: McDivitt, emerging from the CM, Schweickart, at left in the raft, and Scott complete water egress training in the Gulf of Mexico. Right: The Apollo 9 backup crew of Charles “Pete” Conrad, left, Richard F. Gordon, and Alan L. Bean prepares for their water egress training.

The LM formed a critical component to the Moon landing effort. Delays in preparing LM-3 for flight resulted in the crewed test to slip to Apollo 9 in early 1969. The three stages of the Apollo 9 Saturn V stood stacked on Mobile Launcher 2 in High Bay 3 of the VAB. The Apollo 9 spacecraft components, CSM-104 and LM-3, continued testing in the KSC’s Manned Spacecraft Operations Building (MSOB). The prime crew of James A. McDivitt, David R. Scott, and Russell L. Schweickart, as well as their backups Charles “Pete” Conrad, Richard F. Gordon, and Alan L. Bean completed several altitude chamber tests with CSM-104 during the month of November. On Nov. 30, workers placed LM-3 inside its Spacecraft LM Adapter, topping it with CSM-104 to complete the spacecraft for its Dec. 3 rollover to the VAB for mating with the Saturn V. McDivitt, Scott, and Schweickart conducted water egress training in the Gulf of Mexico near Galveston, Texas. On Nov. 25, workers aboard the Motor Vessel M/V Retriever lowered a mockup CM with the crew inside into the water in a nose-down position. Flotation bags inflated to right the spacecraft to a nose-up position. The astronauts then exited the capsule onto life rafts and recovery personnel hoisted them aboard a helicopter. Backups Conrad, Gordon, and Bean completed the test on Dec. 6.

Photo of The Apollo 10 prime crew of Eugene A. Cernan, left, John W. Young, and Thomas P. Stafford Photo of the Apollo 10 backup crew of L. Gordon Cooper, Edgar D. Mitchell, and Donn F. Eisele
Left: The Apollo 10 prime crew of Eugene A. Cernan, left, John W. Young, and Thomas P. Stafford. Right: The Apollo 10 backup crew of L. Gordon Cooper, Edgar D. Mitchell, and Donn F. Eisele.

On Nov. 13, NASA announced the crew for the Apollo 10 mission planned for the spring of 1969. The fourth crewed Apollo mission would involve the launch of a CM and LM on a Saturn V rocket. Depending on the success of earlier missions, Apollo 10 planned to test the CM and LM either in Earth orbit or in lunar orbit, the latter a dress rehearsal for the actual Moon landing likely to follow on Apollo 11. NASA designated Thomas P. Stafford, John W. Young, and Eugene A. Cernan as the prime crew, the first all-veteran three person crew. The trio had served as the backup crew on Apollo 7 and had flight experience in the Gemini program. As backups, NASA assigned L. Gordon Cooper, Donn F. Eisele, and Edgar D. Mitchell. Cooper had flown previously on Mercury 9 and Gemini VIII, Eisele had just returned from Apollo 7, while this marked the first crew assignment for Mitchell. As support crew members, NASA named Joe H. Engle, James B. Irwin, and Charles M. Duke.

Photo of the Apollo 10 Command Module, left, and Service Module arrive at NASA’s Kennedy Space Center (KSC) in Florida Photo of the Apollo 10 S-IC first stage arrives at KSC’s Vehicle Assembly Building (VAB). Workers in the VAB stack the Apollo 10 first stage on its Mobile Launcher
Left: The Apollo 10 Command Module, left, and Service Module arrive at NASA’s Kennedy Space Center (KSC) in Florida. Middle: The Apollo 10 S-IC first stage arrives at KSC’s Vehicle Assembly Building (VAB). Right: Workers in the VAB stack the Apollo 10 first stage on its Mobile Launcher.

Flight hardware in support of Apollo 10 continued to arrive at KSC. Following delivery of LM-4 in October, on Nov. 2 workers mated its two stages and placed the vehicle in one of the MSOB’s altitude chambers. Stafford and Cernan carried out a sea level run on Nov. 22. The CM-106 and SM-106 for Apollo 10 arrived at KSC on Nov. 23 and workers trucked them to the MSOB where they mated the two modules three days later. In the VAB, the Saturn V’s S-IC first stage arrived on Nov. 27 and workers erected it on Mobile Launcher 3 in High Bay 2, awaiting the arrival of the upper stages.

A mockup of the laser ranging retroreflector (LRRR) experiment A mockup of the passive seismic experiment package (PSEP) A mockup of the solar wind composition (SWC) experiment A suited technician deploys mockups of the Apollo 11 experiments – the SWC, far left, the PSEP, and the LRRR, during a test session
Left: A mockup of the laser ranging retroreflector (LRRR) experiment. Middle left: A mockup of the passive seismic experiment package (PSEP). Middle right: A mockup of the solar wind composition (SWC) experiment. Right: A suited technician deploys mockups of the Apollo 11 experiments – the SWC, far left, the PSEP, and the LRRR, during a test session.

On Nov. 19, NASA announced that when Apollo astronauts first land on the Moon, possibly as early as during the Apollo 11 mission in the summer of 1969, they would deploy three scientific experiments – a passive seismometer experiment package (PSEP), a laser ranging retro-reflector (LRRR), and a solar wind composition (SWC) experiment – during their 2.5-hour excursion on the lunar surface. The PSEP will provide information about the Moon’s interior by recording any seismic activity. The passive LRRR consists of an array of precision optical reflectors that serve as a target for Earth-based lasers for highly precise measurements of the Earth-Moon distance. The SWC consists of a sheet of aluminum foil that the astronauts deploy at the beginning of their spacewalk and retrieve at the end for postflight analysis. During the exposure, the foil traps particles of the solar wind, especially noble gases.

The Lunar Module Test Article-8 (LTA-8) inside Chamber B of the Space Environment Simulation Laboratory (SESL) at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston Astronaut James B. Irwin inside LTA-8 during one of the altitude runs Workers remove LTA-8 from SESL’s Chamber B at the conclusion of the altitude tests
Left: The Lunar Module Test Article-8 (LTA-8) inside Chamber B of the Space Environment Simulation Laboratory (SESL) at the Manned Spacecraft Center, now NASA’s Johnson Space Center in Houston. Middle: Astronaut James B. Irwin inside LTA-8 during one of the altitude runs. Right: Workers remove LTA-8 from SESL’s Chamber B at the conclusion of the altitude tests.

On Nov. 14, engineers in MSC’s Space Environment Simulation Laboratory (SESL) completed a series of altitude tests with LM Test Article-8 (LTA-8) to certify the vehicle for lunar missions. Astronaut Irwin and Grumman Aircraft Corporation consulting pilot Gerald P. Gibbons completed the final test, the last in a series of five that started on Oct. 14. Grumman pilot Glennon M. Kingsley paired up with Gibbons for three of the tests. During the tests that simulated various portions of the LM’s flight profile, the chamber maintained a vacuum simulating an altitude of about 150 miles and temperatures as low as -300o F. Strip heaters attached to the LTA’s surface provided the simulated solar heat. NASA transferred the LTA-8 to the Smithsonian Institution in 1978 and it is now on public display at Space Center Houston.

Depiction of Zond 6’s circumlunar trajectory
Depiction of Zond 6’s circumlunar trajectory. Image credit: courtesy RKK Energia.

A Proton rocket with a Zond spacecraft on the launch pad at the Baikonur Cosmodrome Zond 6 photographed the Earth as it looped around the Moon
Left: A Proton rocket with a Zond spacecraft on the launch pad at the Baikonur Cosmodrome. Right: Zond 6 photographed the Earth as it looped around the Moon. Image credits: courtesy RKK Energia.

Depiction of Zond 6’s skip reentry trajectory flown
Depiction of Zond 6’s skip reentry trajectory flown. Image credit: courtesy RKK Energia.

In another reminder that the race to the Moon still existed, on Nov. 10 the Soviet Union launched the Zond 6 spacecraft. Although it launched uncrewed, the Zond spacecraft, essentially a Soyuz without the forward orbital compartment and modified for flights to lunar distances, could carry a crew of two cosmonauts. A cadre of cosmonauts trained for such missions. Similar to the Zond 5 mission in September, Zond 6 entered a trajectory that looped it around the Moon on Nov. 13, passing within 1,500 miles of the lunar surface. The spacecraft took photographs of the Moon’s near and far sides and of the distant Earth. As it neared Earth during its return journey, trouble developed aboard the spacecraft as a faulty hatch seal caused a slow leak and it began to lose atmospheric pressure. Ground controllers initially steadied the pressure loss and performed a final midcourse maneuver that allowed Zond 6 to perform a skip reentry to land in Soviet territory on Nov. 17. However, the spacecraft continued to lose pressure and a buildup of static electricity created a coronal discharge that triggered the spacecraft’s soft landing rockets to fire and cut the parachute lines while it was still descending through 5,300 meters altitude. Although the capsule hit the ground at a high velocity, rescue forces were able to recover the film containers. The Soviets at the time did not reveal either the depressurization or the crash but claimed the flight was a successful circumlunar mission. With two apparently successful uncrewed circumlunar flights and the resumption of crewed missions with Soyuz 3 in October, these Soviet activities perhaps played a part in the decision to send Apollo 8 to the Moon.

News from around the world in November 1968:

Nov. 5 – Richard M. Nixon elected as the 37th U.S. President.

Nov. 5 – Shirley A. Chisolm of Brooklyn, New York, becomes the first African American woman elected to the U.S. Congress.

Nov 8 – The United States launches Pioneer 9 into solar orbit to monitor solar storms that could be harmful to Apollo astronauts traveling to the Moon.

Nov. 13 – The HL-10 lifting body aircraft with NASA pilot John A. Manke at the controls made its first successful powered flight after being dropped from a B-52 bomber at Edwards Air Force Base in California’s Mojave Desert.

Nov. 14 – Yale University announces it is going co-ed beginning in the 1969-1970 academic year.

Nov. 22 – The Beatles release the “The Beatles” (better known as the White Album), the band’s only double album.

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      NASA’s Human Landing System (HLS) will transport the next astronauts that land on the Moon, including the first woman and first person of color, beginning with Artemis III. For safety and mission success, the landers and other equipment in development for NASA’s Artemis campaign must work reliably in the harshest of environments.
      The Hub for Innovative Thermal Technology Maturation and Prototyping (HI-TTeMP) lab at NASA’s Marshall Space Flight Center in Huntsville, Alabama, provides engineers with thermal analysis of materials that may be a prototype or in an early developmental stage using a vacuum chamber, back left, and a conduction chamber, right. NASA/Ken Hall Engineers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, are currently testing how well prototype insulation for SpaceX’s Starship HLS will insulate interior environments, including propellant storage tanks and the crew cabin. Starship HLS will land astronauts on the lunar surface during Artemis III and Artemis IV.
      Marshall’s Hub for Innovative Thermal Technology Maturation and Prototyping (HI-TTeMP) laboratory provides the resources and tools for an early, quick-check evaluation of insulation materials destined for Artemis deep space missions.
      “Marshall’s HI-TTeMP lab gives us a key testing capability to help determine how well the current materials being designed for vehicles like SpaceX’s orbital propellant storage depot and Starship HLS, will insulate the liquid oxygen and methane propellants,” said HLS chief engineer Rene Ortega. “By using this lab and the expertise provided by the thermal engineers at Marshall, we are gaining valuable feedback earlier in the design and development process that will provide additional information before qualifying hardware for deep space missions.”
      A peek inside the conductive test chamber at NASA Marshall’s HI-TTeMP lab where thermal engineers design, set up, execute, and analyze materials destined for deep space to better understand how they will perform in the cold near-vacuum of space. NASA/Ken Hall On the Moon, spaceflight hardware like Starship HLS will face extreme temperatures. On the Moon’s south pole during lunar night, temperatures can plummet to -370 degrees Fahrenheit (-223 degrees Celsius). Elsewhere in deep space temperatures can range from roughly 250 degrees Fahrenheit (120 degrees Celsius) in direct sunlight to just above absolute zero in the shadows.
      There are two primary means of managing thermal conditions: active and passive. Passive thermal controls include materials such as insulation, white paint, thermal blankets, and reflective metals. Engineers can also design operational controls, such as pointing thermally sensitive areas of a spacecraft away from direct sunlight, to help manage extreme thermal conditions. Active thermal control measures that could be used include radiators or cryogenic coolers.
      Engineers use two vacuum test chambers in the lab to simulate the heat transfer effects of the deep space environment and to evaluate the thermal properties of the materials. One chamber is used to understand radiant heat, which directly warms an object in its path, such as when heat from the Sun shines on it. The other test chamber evaluates conduction by isolating and measuring its heat transfer paths.
      NASA engineers working in the HI-TTeMP lab not only design, set up, and run tests, they also provide insight and expertise in thermal engineering to assist NASA’s industry partners, such as SpaceX and other organizations, in validating concepts and models, or suggesting changes to designs. The lab is able to rapidly test and evaluate design updates or iterations.
      NASA’s HLS Program, managed by NASA Marshall, is charged with safely landing astronauts on the Moon as part of Artemis. NASA has awarded contracts to SpaceX for landing services for Artemis III and IV and to Blue Origin for Artemis V. Both landing services providers plan to transfer super-cold propellant in space to send landers to the Moon with full tanks.
      With Artemis, NASA will explore more of the Moon than ever before, learn how to live and work away from home, and prepare for future human exploration of Mars. NASA’s SLS (Space Launch System) rocket, exploration ground systems, and Orion spacecraft, along with the HLS, next-generation spacesuits, Gateway lunar space station, and future rovers are NASA’s foundation for deep space exploration.
      For more on HLS, visit: 
      https://www.nasa.gov/humans-in-space/human-landing-system
      News Media Contact
      Corinne Beckinger 
      Marshall Space Flight Center, Huntsville, Ala. 
      256.544.0034  
      corinne.m.beckinger@nasa.gov 
      Explore More
      8 min read Preguntas frecuentes: La verdadera historia del cuidado de la salud de los astronautas en el espacio
      Article 1 day ago 6 min read FAQ: The Real Story About Astronaut Health Care in Space
      Article 1 day ago 3 min read Ready, Set, Action! Our Sun is the Star in Dazzling Simulation
      Article 1 day ago
      r
      View the full article
    • By Space Force
      Over the past two years, the first U.S. space service component has tripled in size, established a 24/7 space watch cell and executed three Tier 1 Combatant Command exercises.

      View the full article
    • By NASA
      5 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      A prototype of a robot designed to explore subsurface oceans of icy moons is reflected in the water’s surface during a pool test at Caltech in September. Conducted by NASA’s Jet Propulsion Laboratory, the testing showed the feasibility of a mission concept for a swarm of mini swimming robots.NASA/JPL-Caltech In a competition swimming pool, engineers tested prototypes for a futuristic mission concept: a swarm of underwater robots that could look for signs of life on ocean worlds.
      When NASA’s Europa Clipper reaches its destination in 2030, the spacecraft will prepare to aim an array of powerful science instruments toward Jupiter’s moon Europa during 49 flybys, looking for signs that the ocean beneath the moon’s icy crust could sustain life. While the spacecraft, which launched Oct. 14, carries the most advanced science hardware NASA has ever sent to the outer solar system, teams are already developing the next generation of robotic concepts that could potentially plunge into the watery depths of Europa and other ocean worlds, taking the science even further.
      This is where an ocean-exploration mission concept called SWIM comes in. Short for Sensing With Independent Micro-swimmers, the project envisions a swarm of dozens of self-propelled, cellphone-size swimming robots that, once delivered to a subsurface ocean by an ice-melting cryobot, would zoom off, looking for chemical and temperature signals that could indicate life.
      Dive into underwater robotics testing with NASA’s futuristic SWIM (Sensing With Independent Micro-swimmers) concept for a swarm of miniature robots to explore subsurface oceans on icy worlds, and see a JPL team testing a prototype at a pool at Caltech in Pasadena, California, in September 2024. NASA/JPL-Caltech “People might ask, why is NASA developing an underwater robot for space exploration? It’s because there are places we want to go in the solar system to look for life, and we think life needs water. So we need robots that can explore those environments — autonomously, hundreds of millions of miles from home,” said Ethan Schaler, principal investigator for SWIM at NASA’s Jet Propulsion Laboratory in Southern California.
      Under development at JPL, a series of prototypes for the SWIM concept recently braved the waters of a 25-yard (23-meter) competition swimming pool at Caltech in Pasadena for testing. The results were encouraging.
      SWIM Practice
      The SWIM team’s latest iteration is a 3D-printed plastic prototype that relies on low-cost, commercially made motors and electronics. Pushed along by two propellers, with four flaps for steering, the prototype demonstrated controlled maneuvering, the ability to stay on and correct its course, and a back-and-forth “lawnmower” exploration pattern. It managed all of this autonomously, without the team’s direct intervention. The robot even spelled out “J-P-L.”
      Just in case the robot needed rescuing, it was attached to a fishing line, and an engineer toting a fishing rod trotted alongside the pool during each test. Nearby, a colleague reviewed the robot’s actions and sensor data on a laptop. The team completed more than 20 rounds of testing various prototypes at the pool and in a pair of tanks at JPL.
      “It’s awesome to build a robot from scratch and see it successfully operate in a relevant environment,” Schaler said. “Underwater robots in general are very hard, and this is just the first in a series of designs we’d have to work through to prepare for a trip to an ocean world. But it’s proof that we can build these robots with the necessary capabilities and begin to understand what challenges they would face on a subsurface mission.”
      Swarm Science
      A model of the final envisioned SWIM robot, right, sits beside a capsule holding an ocean-composition sensor. The sensor was tested on an Alaskan glacier in July 2023 through a JPL-led project called ORCAA (Ocean Worlds Reconnaissance and Characterization of Astrobiological Analogs). The wedge-shaped prototype used in most of the pool tests was about 16.5 inches (42 centimeters) long, weighing 5 pounds (2.3 kilograms). As conceived for spaceflight, the robots would have dimensions about three times smaller — tiny compared to existing remotely operated and autonomous underwater scientific vehicles. The palm-size swimmers would feature miniaturized, purpose-built parts and employ a novel wireless underwater acoustic communication system for transmitting data and triangulating their positions.
      Digital versions of these little robots got their own test, not in a pool but in a computer simulation. In an environment with the same pressure and gravity they would likely encounter on Europa, a virtual swarm of 5-inch-long (12-centimeter-long) robots repeatedly went looking for potential signs of life. The computer simulations helped determine the limits of the robots’ abilities to collect science data in an unknown environment, and they led to the development of algorithms that would enable the swarm to explore more efficiently.
      The simulations also helped the team better understand how to maximize science return while accounting for tradeoffs between battery life (up to two hours), the volume of water the swimmers could explore (about 3 million cubic feet, or 86,000 cubic meters), and the number of robots in a single swarm (a dozen, sent in four to five waves).
      In addition, a team of collaborators at Georgia Tech in Atlanta fabricated and tested an ocean composition sensor that would enable each robot to simultaneously measure temperature, pressure, acidity or alkalinity, conductivity, and chemical makeup. Just a few millimeters square, the chip is the first to combine all those sensors in one tiny package.
      Of course, such an advanced concept would require several more years of work, among other things, to be ready for a possible future flight mission to an icy moon. In the meantime, Schaler imagines SWIM robots potentially being further developed to do science work right here at home: supporting oceanographic research or taking critical measurements underneath polar ice.
      More About SWIM
      Caltech manages JPL for NASA. JPL’s SWIM project was supported by Phase I and II funding from NASA’s Innovative Advanced Concepts (NIAC) program under the agency’s Space Technology Mission Directorate. The program nurtures visionary ideas for space exploration and aerospace by funding early-stage studies to evaluate technologies that could transform future NASA missions. Researchers across U.S. government, industry, and academia can submit proposals.
      How the SWIM concept was developed Learn about underwater robots for Antarctic climate science See NASA’s network of ready-to-roll mini-Moon rovers News Media Contact
      Melissa Pamer
      Jet Propulsion Laboratory, Pasadena, Calif.
      626-314-4928
      melissa.pamer@jpl.nasa.gov
      2024-162
      Share
      Details
      Last Updated Nov 20, 2024 Related Terms
      Europa Jet Propulsion Laboratory NASA Innovative Advanced Concepts (NIAC) Program Ocean Worlds Robotics Space Technology Mission Directorate Technology Explore More
      5 min read Making Mars’ Moons: Supercomputers Offer ‘Disruptive’ New Explanation
      Article 1 hour ago 4 min read From Houston to the Moon: Johnson’s Thermal Vacuum Chamber Tests Lunar Solar Technology 
      Article 19 hours ago 3 min read Northwestern University Takes Top Honors in BIG Idea Lunar Inflatables Challenge 
      Article 23 hours ago Keep Exploring Discover Related Topics
      Missions
      Humans in Space
      Climate Change
      Solar System
      View the full article
    • By NASA
      Imagine designing technology that can survive on the Moon for up to a decade, providing a continuous energy supply. NASA selected three companies to develop such systems, aimed at providing a power source at the Moon’s South Pole for Artemis missions. 

      Three companies were awarded contracts in 2022 with plans to test their self-sustaining solar arrays at the Johnson Space Center’s Space Environment Simulation Laboratory (SESL) in Houston, specifically in Chamber A in building 32. The prototypes tested to date have undergone rigorous evaluations to ensure the technology can withstand the harsh lunar environment and deploy the solar array effectively on the lunar surface. 
      The Honeybee Robotics prototype during lunar VSAT (Vertical Solar Array Technology) testing inside Chamber A at NASA’s Johnson Space Center in Houston.NASA/David DeHoyos The Astrobotic Technology prototype during lunar VSAT testing inside Chamber A at Johnson Space Center. NASA/James Blair In the summer of 2024, both Honeybee Robotics, a Blue Origin company from Altadena, California and Astrobotic Technology from Pittsburgh, Pennsylvania put their solar array concepts to the test in Chamber A. 

      Each company has engineered a unique solution to design the arrays to withstand the harsh lunar environment and extreme temperature swings. The data collected in the SESL will support refinement of requirements and the designs for future technological advancements with the goal to deploy at least one of the systems near the Moon’s South Pole. 

      The contracts for this initiative are part of NASA’s VSAT (Vertical Solar Array Technology) project, aiming to support the agency’s long-term lunar surface operations. VSAT is under the Space Technology Mission Directorate Game Changing Development program and led by the Langley Research Center in Hampton, Virginia, in collaboration with Glenn Research Center in Cleveland.  

      “We foresee the Moon as a hub for manufacturing satellites and hardware, leveraging the energy required to launch from the lunar surface,” said Jim Burgess, VSAT lead systems engineer. “This vision could revolutionize space exploration and industry.” 

      Built in 1965, the SESL initially supported the Gemini and Apollo programs but was adapted to conduct testing for other missions like the Space Shuttle Program and Mars rovers, as well as validate the design of the James Webb Space Telescope. Today, it continues to evolve to support future Artemis exploration. 

      Johnson’s Front Door initiative aims to solve the challenges of space exploration by opening opportunities to the public and bringing together bold and innovative ideas to explore new destinations. 

      “The SESL is just one of the hundreds of unique capabilities that we have here at Johnson,” said Molly Bannon, Johnson’s Innovation and Strategy specialist. “The Front Door provides a clear understanding of all our capabilities and services, the ways in which our partners can access them, and how to contact us. We know that we can go further together with all our partners across the entire space ecosystem if we bring everyone together as the hub of human spaceflight.” 

      Chamber A remains as one of the largest thermal vacuum chambers of its kind, with the unique capability to provide extreme deep space temperature conditions down to as low as 20 Kelvin. This allows engineers to gather essential data on how technologies react to the Moon’s severe conditions, particularly during the frigid lunar night where the systems may need to survive for 96 hours in darkness. 

      “Testing these prototypes will help ensure more safe and reliable space mission technologies,” said Chuck Taylor, VSAT project manager. “The goal is to create a self-sustaining system that can support lunar exploration and beyond, making our presence on the Moon not just feasible but sustainable.” 

      The power generation systems must be self-aware to manage outages and ensure survival on the lunar surface. These systems will need to communicate with habitats and rovers and provide continuous power and recharging as needed. They must also deploy on a curved surface, extend 32 feet high to reach sunlight, and retract for possible relocation.  

      “Generating power on the Moon involves numerous lessons and constant learning,” said Taylor. “While this might seem like a technical challenge, it’s an exciting frontier that combines known technologies with innovative solutions to navigate lunar conditions and build a dynamic and robust energy network on the Moon.”

      Watch the video below to explore the capabilities and scientific work enabled by the thermal testing conducted in Johnson’s Chamber A facility.
      View the full article
    • By NASA
      On Nov. 16, 2009, space shuttle Atlantis began its 31st trip into space, on the third Utilization and Logistics Flight (ULF3) mission to the International Space Station, the 31st shuttle flight to the orbiting lab. During the 11-day mission, the six-member STS-129 crew worked with the six-person Expedition 21 crew during seven days of docked operations. The mission’s primary objectives included delivering two external logistics carriers and their spare parts, adding nearly 15 tons of hardware to the station, and returning a long-duration crew member, the last to return on a shuttle. Three of the STS-129 astronauts conducted three spacewalks to transfer spare parts and continue assembly and maintenance of the station. As a group of 12, the joint crews celebrated the largest and most diverse Thanksgiving gathering in space.

      Left: Official photograph of the STS-129 crew of Leland D. Melvin, left, Charles O. Hobaugh, Michael J. Foreman, Robert “Bobby” L. Satcher, Barry “Butch” E. Wilmore, and Randolph “Randy” J. Bresnik. Middle: The STS-129 crew patch. Right: The ULF3 payload patch.
      The six-person STS-129 crew consisted of Commander Charles O. Hobaugh, Pilot Barry “Butch” E. Wilmore, and Mission Specialists Randolph “Randy” J. Bresnik, Michael J. Foreman, Leland D. Melvin, and Robert “Bobby” L. Satcher. Primary objectives of the mission included launch and transfer to the station of the first two EXPRESS Logistics Carriers (ELC-1 and ELC-2) and their multiple spare parts, and the return of NASA astronaut and Expedition 20 and 21 Flight Engineer Nicole P. Stott, the last astronaut to rotate on the shuttle.

      Left: In the Orbiter Processing Facility (OPF) at NASA’s Kennedy Space Center in Florida, workers finish processing Atlantis for STS-129. Right: Space shuttle Atlantis rolls over from the OPF to the Vehicle Assembly Building.

      Left: Atlantis rolls out to Launch Pad 39A. Right: The STS-129 crew during the Terminal Countdown Demonstration Test.
      Atlantis returned to NASA’s Kennedy Space Center (KSC) from its previous mission, STS-125, on June 2, 2009, and workers towed it to the Orbiter Processing Facility (OPF) to prepare it for STS-129. The orbiter rolled over to the Vehicle Assembly Building on Oct. 6, and after mating with its external tank and twin solid rocket boosters, rolled out to Launch Pad 39A on Oct. 14, targeting a Nov. 16 launch. Six days later, the six-member crew participated in the Terminal Countdown Demonstration Test, essentially a dress rehearsal of the actual countdown for launch, returning to Houston for final training. They returned to KSC on Nov. 13 to prepare for launch.

      Left: With Atlantis sitting on Launch Pad 39A, the Ares 1-X rocket lifts off from Launch Pad 39B. Right: The payload canister arrives at Launch Pad 39A.

      Left: The STS-129 astronauts leave crew quarters for the ride to Launch Pad 39A. Right: Liftoff of space shuttle Atlantis on STS-129.
      On Nov. 16, at 2:28 p.m. EST, space shuttle Atlantis lifted off from Launch Pad 39A to begin its 31st trip into space, carrying its six-member crew on the ULF3 space station outfitting and resupply mission. Eight and a half minutes later, Atlantis and its crew had reached orbit. The flight marked Hobaugh’s third time in space, having flown on STS-104 and STS-118, Foreman’s and Melvin’s second, having flown on STS-123 and STS-122, respectively, while Wilmore, Bresnik, and Satcher enjoyed their first taste of weightlessness.

      Left: The two EXPRESS Logistics Carriers in Atlantis’ payload bay. Middle: Leland D. Melvin participates in the inspection of Atlantis’ thermal protection system. Right: The Shuttle Remote Manipulator System grasps the Orbiter Boom Sensor System for the inspection.
      After reaching orbit, the crew opened the payload bay doors, deployed the shuttle’s radiators, and removed their bulky launch and entry suits, stowing them for the remainder of the flight. The astronauts spent six hours on their second day in space conducting a detailed inspection of Atlantis’ nose cap and wing leading edges, with Hobaugh, Wilmore, Melvin, and Bresnik taking turns operating the Shuttle Remote Manipulator System (SRMS), or robotic arm, and the Orbiter Boom Sensor System (OBSS).

      Left: The International Space Station as seen from Atlantis during the rendezvous and docking maneuver. Middle: Atlantis as seen from the space station, showing the two EXPRESS Logistics Carriers (ELC) in the payload bay. Right: View of the space station from Atlantis during the rendezvous pitch maneuver, with the Shuttle Remote Manipulator System grasping ELC-1 in preparation for transfer shortly after docking.
      On the mission’s third day, Hobaugh assisted by his crewmates brought Atlantis in for a docking with the space station. During the rendezvous, Hobaugh stopped the approach at 600 feet and completed the Rendezvous Pitch Maneuver so astronauts aboard the station could photograph Atlantis’ underside to look for any damage to the tiles. Shortly after docking, the crews opened the hatches between the two spacecraft and the six-person station crew welcomed the six-member shuttle crew. After the welcoming ceremony, Stott joined the STS-129 crew, leaving a crew of five aboard the station. Melvin and Bresnik used the SRMS to pick up ELC-1 from the payload bay and hand it off to Wilmore and Expedition 21 NASA astronaut Jeffrey N. Williams operating the Space Station Remote Manipulator System (SSRMS), who then installed it on the P3 truss segment.

      Images from the first spacewalk. Left: Michael J. Foreman unstows the S-band Antenna Support Assembly prior to transferring it to the station. Middle: Robert “Bobby” L. Satcher lubricates the robotic arm’s Latching End Effector. Right: Satcher’s image reflected in a Z1 radiator panel.
      During the mission’s first of three spacewalks on flight day four, Foreman and Satcher ventured outside for six hours and 37 minutes. During the excursion, with robotic help from their fellow crew members, they transferred a spare S-band Antenna Support Assembly from the shuttle’s payload bay to the station’s Z1 truss. Satcher, an orthopedic surgeon by training, performed “surgery” on the station’s main robotic arm as well as the robotic arm on the Kibo Japanese module, by lubricating their latching end effectors. One day after joining Atlantis’ crew, Stott celebrated her 47th birthday.

      Left: Space station crew member Jeffery N. Williams assists STS-129 astronaut Leland D. Melvin in operating the space station’s robotic arm to transfer and install the second EXPRESS Logistics Carrier (ELC2) on the S3 truss. Middle: The station robotic arm installs ELC2 on the S3 truss. Right: Michael J. Foreman, left, and Randolph J. Bresnik during the mission’s second spacewalk.
      On the mission’s fifth day, the astronauts performed another focused inspection of the shuttle’s thermal protection system. The next day, through another coordinated robotic activity involving the shuttle and station arms, the astronauts transferred ELC-2 and its complement of spares from the payload bay to the station’s S3 truss. Foreman and Bresnik completed the mission’s second spacewalk. Working on the Columbus module, they installed the Grappling Adaptor to On-Orbit Railing (GATOR) fixture that includes a system used for ship identification and an antenna for Ham radio operators. They next installed a wireless video transmission system on the station’s truss. This spacewalk lasted six hours and eight minutes.

      Left: Randolph J. Bresnik during the third STS-129 spacewalk. Middle: Robert “Bobby” L. Satcher during the third spacewalk. Right: The MISSE 7 exposure experiment suitcases installed on ELC2.
      Following a crew off duty day, on flight day eight Satcher and Bresnik exited the airlock for the mission’s third and final spacewalk. Their first task involved moving an oxygen tank from the newly installed ELC-2 to the Quest airlock. They accomplished this task with robotic assistance from their fellow crew members. Bresnik retrieved the two-suitcase sized MISSE-7 experiment containers from the shuttle cargo bay and installed them on the MISSE-7 platform on ELC-2, opening them to begin their exposure time. This third spacewalk lasted five hours 42 minutes.

      Left: An early Thanksgiving meal for 12 aboard the space station. Right: After the meal, who has the dishes?
      Thanksgiving Day fell on the day after undocking, so the joint crews celebrated with a meal a few days early. The meal represented not only the largest Thanksgiving celebration in space with 12 participants, but also the most international, with four nations represented – the United States, Russia, Canada, and Belgium (representing the European Space Agency).

      Left: The 12 members of Expedition 21 and STS-129 pose for a final photograph before saying their farewells. Right: The STS-129 crew, now comprising seven members.

      A selection of STS-129 Earth observation images. Left: Maui. Middle: Los Angeles. Right: Houston.
      Despite their busy workload, as with all space crews, the STS-129 astronauts made time to look out the windows and took hundreds of photographs of their home planet.

      Left: The space station seen from Atlantis during the flyaround. Middle: Atlantis as seen from the space station during the flyaround, with a now empty payload bay. Right: Astronaut Nicole P. Stott looks back at the station, her home for three months, from the departing Atlantis.
      On flight day nine, the joint crews held a brief farewell ceremony. European Space Agency astronaut Frank De Winne, the first European to command the space station, handed over command to NASA astronaut Williams. The two crews parted company and closed the hatches between the two spacecraft. The next day, with Wilmore at the controls, Atlantis undocked from the space station, having spent seven days as a single spacecraft. Wilmore completed a flyaround of the station, with the astronauts photographing it to document its condition. A final separation burn sent Atlantis on its way.
      The astronauts used the shuttle’s arm to pick up the OBSS and perform a late inspection of Atlantis’ thermal protection system. On flight day 11, Hobaugh and Wilmore tested the orbiter’s reaction control system thrusters and flight control surfaces in preparation for the next day’s entry and landing. The entire crew busied themselves with stowing all unneeded equipment.

      Left: Atlantis about to touch down at NASA’s Kennedy Space Center in Florida. Middle: Atlantis touches down. Right: Atlantis deploys its drag chute as it continues down the runway.

      Left: Six of the STS-129 astronauts pose with Atlantis on the runway at NASA’s Kennedy Space Center in Florida. Right: The welcome home ceremony for the STS-129 crew at Ellington Field in Houston.
      On Nov. 27, the astronauts closed Atlantis’ payload bay doors, donned their launch and entry suits, and strapped themselves into their seats, a special recumbent one for Stott who had spent the last three months in weightlessness. Hobaugh fired Atlantis’ two Orbital Maneuvering System engines to bring them out of orbit and head for a landing half an orbit later. He guided Atlantis to a smooth touchdown at KSC’s Shuttle Landing Facility.
      The landing capped off a very successful STS-129 mission of 10 days, 19 hours, 16 minutes. The six astronauts orbited the planet 171 times. Stott spent 90 days, 10 hours, 45 minutes in space, completing 1,423 orbits of the Earth. After towing Atlantis to the OPF, engineers began preparing it for its next flight, STS-132 in May 2010. The astronauts returned to Houston for a welcoming ceremony at Ellington Field.
      Enjoy the crew narrate a video about the STS-129 mission.
      Explore More
      23 min read 55 Years Ago: Apollo 12 Makes a Pinpoint Landing on the Moon
      Article 4 days ago 12 min read 40 Years Ago: STS-51A – “The Ace Repo Company”
      Article 1 week ago 1 min read Oral History with Jon A. McBride, 1943 – 2024
      Article 2 weeks ago View the full article
  • Check out these Videos

×
×
  • Create New...